i ENCLOSURE 1 NOTICE OF VIOLATION :
Florida Power and Light Company Docket No. 50-250 Turkey Point Unit 3 License No. DPR-31 During the Nuclear Regulatory Commission (NRC) inspection conducted on May 12 -
June 9, 1986, a violation of NRC requirements was identified.
The violation involved the failure to implement Technical Specification (TS) requirements, in that a temporary cnange was made to a procedure in an unauthorized manner.
In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1985), the violation is listed below:
Technical Specification (TS) 6.8.1 requires that written procedures and administrative policies be implemented that meet or exceed the requirements and recommendations of sections 5.1 and 5.3 of ANSI N18 7-1972 and Appendix A of USNRC Regulatory Guide 1.33.
Appendix A of USNRC Regulatory Guide 1.33 recommends that specific procedures be written for surveillance tests, inspections and calibrations of the reactor protection system.
Contrary to the above, Operating Procedure 14004.1, Steam Generator Protec-tion Channels - Periodic Test, dated October 25, 1985 was not properly implemented on June 5, 1986. While performing steps 8.3.79 through 8.3.83, the channel 3 steam header pressure and steam break protection portion of the procedure, a power supply was substituted for the procedurally required transmitter simulator, and test signal input and monitoring locations other than those specified by the procedure were used.
This is a Severity Level IV violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, Florida Power and Light Company is hereby required to submit to this Office within 30 days of the date of the letter transmitting this Notice a written statement or explanation in reply including (for each violation): (1) admission or denial of the violation, (2) the reasons for the violation if admitted, (3) the corrective steps which have been taken and the results achieved, (4) the corrective steps which will be taken to avoid further violations, and (5) the date when full compliance will be achieved.
Where good cause is shown, consideration will be given to extending the response time.
FOR THE NUCLEAR REGULATORY COMMISSION
/y l' Division Luis A. Re Acting Director f Reactor Projects Dated at. Atlanta, Georgia this 7 day of July 1986 8607180356 860707