ML20129E090
| ML20129E090 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 05/10/1985 |
| From: | Rogers T, Wilson B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20129E087 | List: |
| References | |
| 50-250-OL-85-01, 50-250-OL-85-1, NUDOCS 8507160731 | |
| Download: ML20129E090 (2) | |
Text
.
~.
ENCLOSURE 1 EXAMINATION REPORT 250/0L-85-01 Facility Licensee: Florida Power and Light Company 9250 West Flagler Street Miami, FL 33101 Facility Name:
Turkey Point Facility Docket Nos. 50-250 and 50-251 An oral examination was adminis red at Turkey Point near Homestead, Florida.
S!/o!PS Chief Examiner-Thomas Rogers' Date Signed Approved by:
JuA. M.
E!!o !?(
, sm BP6ce A. Wilson, Section Chief Date Signed Summary:
Examination on April 30, 1985.
An oral senior reactor operator upgrade examination was administered to one candidate; this candidate passed.
8507160731 850515 PDR ADOCK 05000250 G
REPORT DETAILS 1.
Facility Employees Contacted
- Arias, J., Jr., Regulation and Compliance Supervisor
- Labarraque, J. A., Acting Plant Manager - Nuclear
- Miller, W. C., Training Department Supervisor Other Personnel Contacted
- Brewer, D. R., Resident Inspector, USNRC
- Attended Exit Meeting 2.
Chief Examiner:
Rogers, T., USNRC 3.
Exit Meeting At the conclusion of the site visit the examiner met with representatives of the plant staff to discuss the results of the examination.
The cooperation given to the examiners and the effort to ensure an atmos-phere in the control room conducive to oral examinations was also noted and appreciated.
.