ULNRC-06595, Response to Request for Additional Information Regarding License Amendment Request for Deferral of Upcoming Steam Generator Inspection (LDCN 20-0013))

From kanterella
Jump to navigation Jump to search
Response to Request for Additional Information Regarding License Amendment Request for Deferral of Upcoming Steam Generator Inspection (LDCN 20-0013))
ML20238C105
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/25/2020
From: Wink R
Ameren Missouri, Union Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML20238C104 List:
References
LDCN 20-0013, ULNRC-06595
Download: ML20238C105 (5)


Text

SENSITIVE INFORMATION WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 Amer MISSOURI en Callaway Plant August 25, 2020 ULNRC-06595 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50.90 10 CFR 2.390(a)(4)

Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

RENEWED FACILITY OPERATING LICENSE NPF-30 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST FOR DEFERRAL OF UPCOMING STEAM GENERATOR INSPECTION (LDCN 20-0013))

References:

1 . Ameren Missouri letter ULNRC-06586, Request for One-Time License Amendment to Defer Upcoming Steam Generator Inspection (LDCN 20-00 13),

dated June 26, 2020 (ADAMS Accession No. ML20178A669)

2. Ameren Missouri letter ULNRC-06592, Supplement to License Amendment Request Regarding Deferral of Upcoming Steam Generator Inspection (LDCN 20-00 1 3), dated July 2 1 2020 (ADAMS Accession No. ML20203M328)

By letter dated June 26, 2020 (Reference 1), Ameren Missouri (Union Electric) submitted a license amendment request (LAR) for approval to delay performance of the steam generator inspection required per part d.2 of Callaway Technical Specification 5.5.9, Steam Generator (SG) Program. The inspection (i.e. eddy current testing of the steam generator tubes) is currently scheduled to be performed during Refuel Outage (RFO) 24 at the Callaway Plant this Attachment 1 to this letter contains sensitive information and should be withheld from public disclosure per 10 CFR 2.390.

Upon removal of Attachment 1 this letter is uncontrolled.

83 15 County Road 459 : Steedman, MO 65077 AmerenMissouri.com L. -- L

SENSITIVE INFORMATION WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 ULNRC-06595 August 25, 2020 Page 2 of 5 coming October (2020), and per the requested license amendment, it would be deferred to RFO 25 which is scheduled for the spring of 2022. Subsequent to submittal of the LAR, a supplement dated July 2 1 2020 (Reference 2) was submitted to provide an amended proprietary version of the vendor-supplied Operational Assessment included with the LAR. The amended version included brackets adjacent to the text containing the proprietary information, with markings alongside the brackets, signifying the particular reason/basis for the proprietary information (i.e.,

why it should be withheld).

During its review of the LAP. (including the provided Operational Assessment), the NRC staff determined that a request for additional information (RAI) was needed to complete its review.

The NRC transmitted an RAI to Ameren Missouri in electronic form on August 12, 2020, and requested that the response be provided within 30 days of receipt. Accordingly, the response to the RAI is attached to this letter. The additional information provided in the RAI response does not change the No Significant Hazards Consideration conclusions reached in the LAR, nor does it change the conclusion regarding no need for an environmental assessment based on the categorical exclusion provisions of 10 CFR 5 1 .22, in regard to the LAR.

It should be noted that the complete RAI response contains proprietary information. Therefore, a proprietary version and a non-proprietary (redacted) version of the RAI response (as prepared in the form of a report by Ameren Missouris contractor, Framatome, Inc.) are provided as Attachments 1 and 2 to this letter, respectively. An affidavit attesting to the proprietary nature of Attachment 1 (i.e., the need for withholding the proprietary information from public disclosure per 10 CFR 2.390) is provided as Attachment 3 to this letter.

This submittal does not contain new commitments.

In accordance with 10 CFR 50.9 1, Notice for public comment; State consultation, Section (b)(l), a copy of this RAJ response (in support of the associated license amendment application) is being provided to the designated Missouri State official.

If there are any questions, please contact Mr. Tom Elwood at 314-225-1905.

Attachment 1 to this letter contains sensitive information and should be withheld from public disclosure per 10 CFR 2.390.

Upon removal of Attachment 1 this letter is uncontrolled.

L iI -

jB

SENSITIVE INFORMATION WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 ULNRC-06595 August 25, 2020 Page 3 of 5 I declare under penalty of perjury that the foregoing is true and correct.

Sincerely, Executed on: August 25, 2020 Roger C. Wink Manager, Regulatory Affairs DRB/mlp Attachments:

1 Response to Request for Additional Information (Non-Redacted)

2. Response to Request for Additional Information (Redacted)
3. Affidavit Attachment 1 to this letter contains sensitive information and should be withheld from public disclosure per 10 CFR 2.390.

Upon removal of Attachment 1 this letter is uncontrolled.

Uth I LLL I

SENSITIVE INFORMATION WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 ULNRC-06595 August 25, 2020 Page 4 of 5 cc: Mr. Scott A. Morris Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Mahesh Chawla Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O8B1A Washington, DC 20555-000 1 Attachment 1 to this letter contains sensitive information and should be withheld from public disclosure per 10 CFR 2.390.

Upon removal of Attachment 1, this letter is uncontrolled.

I

SENSITIVE INFORMATION WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 ULNRC-06595 August 25, 2020 Page 5 of 5 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 6100 Western Place, Suite 1050 Fort Worth, TX 76107 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via LER ULNRC Distribution:

F. M. Diya B. L. Cox F. I. Bianco S. P. Banker K. A. Mills J. J. Hutchison R. C. Wink T. B. Elwood J. C. Claunch NSRB Secretary Performance Improvement Coordinator STARS Regulatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)

Ms. Katie Jo Wheeler (DNR)

Missouri Public Service Commission Attachment 1 to this letter contains sensitive information and should be withheld from public disclosure per 10 CFR 2.390.

L Upon removal of Attachment 1, this letter is uncontrolled.

z:z j zij