MONTHYEARML19301A0012019-09-18018 September 2019 Draft of TSTF-577, Revision 0a, Performance Based Frequencies for Steam Generator Tube Inspections Project stage: Draft Other RS-20-044, Emergency License Amendment Request for a One-Time Extension of the Steam Generator Tube Inspections2020-04-0606 April 2020 Emergency License Amendment Request for a One-Time Extension of the Steam Generator Tube Inspections Project stage: Request ULNRC-06586, Attachment 4 - Affidavit2020-06-24024 June 2020 Attachment 4 - Affidavit Project stage: Request ML20178A6692020-06-26026 June 2020 Request for One-Time License Amendment to Defer Upcoming Steam Generator Inspection (LDCN 20-0013) Project stage: Request ML20178A6732020-06-26026 June 2020 Attachment 3 - Callaway Unit 1, Steam Generator Operational Assessment to Support Deferral of Planned Inspections from 1R24 to 1R25, Revision 1 (Redacted) Project stage: Request ML20190A0812020-07-15015 July 2020 Letter - Notice of Consideration of Issuance of Amendment to RFOL, Proposed Nshcd, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information Project stage: Other ML20190A0792020-07-15015 July 2020, 20 July 2020 Notice of Consideration of Issuance of Amendment to RFOL, Proposed Nshcd, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information (EPID L-2020-LLA-0142 Project stage: Request ML20190A0822020-07-20020 July 2020 FRN - Notice of Consideration of Issuance of Amendment to RFOL, Proposed Nshcd, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information Project stage: Other ULNRC-06592, Supplement to License Amendment Request Regarding Deferral of Upcoming Steam Generator Inspection (LDCN 20-0013)2020-07-21021 July 2020 Supplement to License Amendment Request Regarding Deferral of Upcoming Steam Generator Inspection (LDCN 20-0013) Project stage: Supplement ML20205L4252020-07-22022 July 2020 NRR E-mail Capture - Callaway Plant, Unit 1 - Acceptance of Requested Licensing Action Request for One-Time License Amendment to Defer Upcoming Steam Generator Inspection (EPID L-2020-LLA-0142)(COVID-19) Project stage: Acceptance Review ML20212L3652020-08-0606 August 2020 Request for Withholding Information from Public Disclosure (EPID L-2020-LLA-0142) (COVID-19) Project stage: Withholding Request Acceptance ML20238C1072020-08-25025 August 2020 Response to Request for Additional Information (Redacted) Project stage: Response to RAI ULNRC-06603, Corrected Affidavit for Proprietary Information Provided in Support of License Amendment Request Regarding Defferal of Upcoming Steam Generator Inspection (LDCN 20-001)2020-09-0303 September 2020 Corrected Affidavit for Proprietary Information Provided in Support of License Amendment Request Regarding Defferal of Upcoming Steam Generator Inspection (LDCN 20-001) Project stage: Request ML20253A2532020-09-29029 September 2020 Request for Withholding Information from Public Disclosure (EPID L-2020-LLA-0142 (COVID-19)) Project stage: Withholding Request Acceptance ML20246G5702020-10-16016 October 2020 Issuance of Amendment No. 223 One-Time Deferral of the Steam Generator Tube Inspections Project stage: Approval 2020-07-20
[Table View] |
|
---|
Category:Letter
MONTHYEARULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 IR 05000483/20230042024-01-19019 January 2024 Integrated Inspection Report 05000483/2023004 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) ML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23317A0012024-01-12012 January 2024 Audit Summary Regarding LAR to Clarify Support System Requirements for the Residual Heat Removal and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML24011A1492024-01-11011 January 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information (05000483/2024011) ULNRC-06847, Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01)2023-12-21021 December 2023 Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01) ULNRC-06849, License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds2023-12-20020 December 2023 License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds ML23346A0392023-12-14014 December 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Relief from Requirements of ASME Code, Section Xl, Examination and Testing Unbonded Post-Tensioning System ULNRC-06844, Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification2023-12-0707 December 2023 Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification 05000483/LER-2023-001, Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications2023-11-29029 November 2023 Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications ULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2023-11-20020 November 2023 Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) IR 05000483/20230102023-11-15015 November 2023 NRC License Renewal Phase 1 Inspection Report 05000483 2023010 IR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23297A2502023-11-0606 November 2023 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination and Opportunity for a Hearing (EPID L-2022-LLA-0176) - Letter IR 05000483/20240122023-10-24024 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000483/2024012) ML23293A2652023-10-24024 October 2023 3rd Quarter 2023 Integrated Inspection Report ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) ML23234A1522023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Letter) ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23270B9662023-09-27027 September 2023 10 CFR 50.55a(z)(I) Request for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23261C3852023-09-25025 September 2023 Safety Evaluation for Operating Quality Assurance Manual Revision 36A ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML23206A1992023-09-15015 September 2023 Regulatory Audit Summary Regarding License Amendment and Regulatory Exemptions Request for Fuel Transition to Framatome Gaia Fuel (Epids L-2022-LLA-0150 and L-2022-LLE-0030) IR 05000483/20234012023-09-13013 September 2023 NRC Security Baseline Inspection Report 05000483/2023401 ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20230052023-08-23023 August 2023 Updated Inspection Plan for Callaway Nuclear Power Plant, Unit 1 (Report 05000483/2023005) - Mid Cycle Letter 2023 ULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A2023-08-17017 August 2023 Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A ML23219A1392023-08-15015 August 2023 Request for Withholding Information from Public Disclosure ULNRC-06830, Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak2023-08-15015 August 2023 Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak ML23215A1972023-08-0303 August 2023 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) ULNRC-06223, Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004)2023-07-25025 July 2023 Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004) ULNRC-06799, Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications2023-07-13013 July 2023 Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications IR 05000483/20230022023-07-10010 July 2023 Integrated Inspection Report 05000483/2023002 ML23174A1272023-06-23023 June 2023 Cw FFD Document Request List 2023 ML23171A9942023-06-22022 June 2023 Acceptance of Request for Approval of Operating Quality Assurance Manual Revision 36a ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) IR 05000483/20230112023-06-15015 June 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000483/2023011 ULNRC-06822, Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a2023-06-14014 June 2023 Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a ML23158A1462023-06-13013 June 2023 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000483/2023010) ULNRC-06815, Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a2023-06-0505 June 2023 Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a ULNRC-06818, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate .2023-06-0505 June 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate . ML23093A0952023-05-10010 May 2023 Issuance of Amendment No. 232 Regarding Technical Specification Changes for Spent Fuel Storage ULNRC-06816, Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015)2023-05-0909 May 2023 Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015) ML23129A7942023-05-0909 May 2023 Post-Audit Supplement to License Amendment Request and Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (Iepid L-2022-LLA-0150 and EPID L-2022-LLE-0030) ML23122A3172023-05-0808 May 2023 Review of the Spring 2022 Steam Generator Tube Inservice Inspections ML23118A3492023-05-0808 May 2023 Request for Withholding Information from Public Disclosure 2024-01-29
[Table view] |
Text
SENSITIVE INFORMATION WITHHOLD FROM PUBLIC DISCLOSURE V UNDER 10 CFR 2.390 Amerefl MISSOURI Callaway Plant June 26, 2020 ULNRC-06586 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50.90 10 CFR 2.390(a)(4)
Ladies and Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.
RENEWED FACILITY OPERATING LICENSE NPF-30 REQUEST FOR ONE-TIME LICENSE AMENDMENT TO DEFER UPCOMING STEAM GENERATOR INSPECTION (LDCN 20-0013)
Pursuant to 10 CFR 50.90, Application for amendment of license or construction permit, Ameren Missouri (Union Electric Company) herewith requests, on an expedited basis, approval of a one-time license amendment regarding the steam generator tube inspection required per part d.2 of Callaway Technical Specification 5.5.9, Steam Generator (SG) Program. Specifically, approval of a change to the Technical Specification is requested to allow the steam generator tube inspection (eddy current testing) currently scheduled to be performed during Refuel Outage 24 this coming October (2020) to be deferred such that it would instead be performed during Refuel Outage 25 which is scheduled for the spring of 2022.
Deferral of the required SG tube inspection is necessitated by Coronavirus Disease 2019 (COVID 19) for which a national emergency was declared on March 13, 2020. The upcoming steam generator inspection would require the working together, in close quarters, of numerous employees and vendor personnel from other states and areas. This deferral is being requested in the interest of personnel safety and to preclude the potential for transmittal and spread of the COVID-19 virus.
Attachment 2 to this letter contains sensitive information and should be withheld from public disclosure per 10 CFR 2.390.
Upon removal of Attachment 2, this letter and its other attachments are uncontrolled.
SENSITIVE INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390
ULNRC-06586 June 26, 2020 Page 2 of 5 Essential information is provided in the attachments to this letter. Attachment 1 provides an overall discussion of the proposed change. Attachments 2 and 3 provide non-redacted and redacted versions, respectively, of the primary technical document in support of the proposed change, i.e., an Operational Assessment of the steam generators at the Callaway Plant, as prepared by the contractor, Framatome Inc. (Framatome). Attachment 4 is an affidavit prepared by Framatome supporting the withholding of certain information from public disclosure in accordance with 10 CFR 2.390. Attachment 5 provides a mark-up of the affected Technical Specification (TS) pages for revising TS 5.5.9, and Attachment 6 provides clean T$ pages reflecting the revised Technical Specification if revised and approved as proposed.
It has been determined that this amendment application does not involve a significant hazard consideration as determined per 10 CFR 50.92, Issuance of amendment. Pursuant to 10 CFR 5 1 .22, Criterion categorical exclusion or otherwise not requiring environmental review, Section (b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of this amendment.
Further, this submittal does not contain new commitments.
The Callaway Onsite Review Committee has reviewed and approved the proposed changes and has approved the submittal of this amendment application.
Ameren Missouri requests approval of the requested license amendment by October 5, 2020.
Ameren Missouri further requests that the license amendment be made effective upon NRC issuance, to be implemented within 45 days from the date of issuance.
In accordance with 10 CFR 50.91 Notice for public comment; State consultation, Section (b)(1), a copy of this amendment application is being provided to the designated Missouri State official.
If there are any questions, please contact Mr. Tom Elwood at 314-225-1905.
I declare under penalty of perjury that the foregoing is true and correct.
Sincerely, Stephanie P. Banker Vice President, Engineering Executed on: June 26, 2020
ULNRC-065$6 June 26, 2020 Page 3 of 5 Attachments:
1 Discussion of Change
- 2. Callaway Unit 1 Steam Generator Operational Assessment to Support Deferral of Planned Inspections from 1R24 to 1R25 (Framatome document 5 1-9312589-000, Non-Redacted) 3 Callaway Unit 1 Steam Generator Operational Assessment to Support Deferral of Planned Inspections from 1R24 to 1R25 (Framatome document 51-9312589-001, Redacted)
- 4. Affidavit
- 5. Marked-up Technical Specification Pages
- 6. Proposed Technical Specification Pages
ULNRC-06586 June 26, 2020 Page 4 of 5 cc: Mr. Scott A. Morris Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Mahesh Chawla Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O8B1A Washington, DC 20555-0001
ULNRC-065$6 June 26, 2020 Page 5 of 5 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 6100 Western Place, Suite 1050 FortWorth,TX 76107 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via LER ULNRC Distribution:
F. M. Diya B. L. Cox F. J. Bianco S. P. Banker K. A. Mills J. J. Hutchison R. C. Wink T. B. Elwood J. C. Claunch NSRB Secretary Performance Improvement Coordinator STARS Regulatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)
Ms. Katie Jo Wheeler (DNR)
Missouri Public Service Commission