ML091520257

From kanterella
Revision as of 09:09, 26 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Palisades, Proposed Operating Test Comments
ML091520257
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/07/2008
From:
NRC/RGN-III
To:
Entergy Nuclear Palisades
Shared Package
ML082200310 List:
References
Download: ML091520257 (1)


Text

Proposed Operating Test Comments

1. Change SRO JPM ADM 2 so we can perform in the simulator or classroom.

Done 2. Change the SRO system JPM from Placing the Zero Power Mode Bypass in Operation (SYS F) to Sampling Containment for Hydrogen (SYS D). Done

3. Change the Containment Air Cooler Fan Trip malfunction in Scenario 1. The Tech Spec call is weak. Added a slow pressure leak malfunction on Safety Injection Tank T-82A.
4. Remove the Tech Spec call for failure of the primary reactor trip push button on panel C-02. The NRC can't evaluate the spec. It will be completed before the applicant recognizes the spec and can only be evaluated by follow-up questions. Done.