ML091520257
Jump to navigation
Jump to search
| ML091520257 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 07/07/2008 |
| From: | NRC/RGN-III |
| To: | Entergy Nuclear Palisades |
| Shared Package | |
| ML082200310 | List: |
| References | |
| Download: ML091520257 (1) | |
Text
Proposed Operating Test Comments
- 2. Change the SRO system JPM from Placing the Zero Power Mode Bypass in Operation (SYS F) to Sampling Containment for Hydrogen (SYS D). Done
- 3. Change the Containment Air Cooler Fan Trip malfunction in Scenario 1. The Tech Spec call is weak. Added a slow pressure leak malfunction on Safety Injection Tank T-82A.
- 4. Remove the Tech Spec call for failure of the primary reactor trip push button on panel C-02. The NRC cant evaluate the spec. It will be completed before the applicant recognizes the spec and can only be evaluated by follow-up questions. Done.