ML091520121

From kanterella
Jump to navigation Jump to search
ES-301-2 SRO R1, Control Room/In-Plant Systems Outline
ML091520121
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/07/2008
From:
NRC/RGN-III
To:
Entergy Nuclear Palisades
Shared Package
ML082200310 List:
References
Download: ML091520121 (1)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Palisades Date of Examination: July 2008 Exam Level: RO SRO-I SRO-U Operating Test Number: 1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function

a. N/A - RO Only
b. Manually Initiate Containment Isolation (SRO-U) (2 valves in series dont close)

A,D,EN 2

c. PORV Lifting After Block Valve Opening (SRO-U) (PORV lifts, must close block valve)

A,L,N 3

d. Sample Containment for Hydrogen A,D 5
e. N/A - RO Only
f. N/A - RO Only
g. N/A - RO Only
h. N/A - RO Only In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. Outside Control Room B S/G ESDE Isolation per EOP Supplement 18 (SRO-U)

E,M,R 4s

j. Locally Start and Load 1-1 D/G (SRO-U)

A,D 6

k. N/A - RO Only All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3

< 9 / < 8 / < 4

> 1 / > 1 / > 1

- / - / > 1 (control room system)

> 1 / > 1 / > 1

> 2 / > 2 / > 1

< 3 / < 3 / < 2 (randomly selected)

> 1 / > 1 / > 1 ES-301, Page 23 of 27