Comment (91) of Kenneth Clark on Consideration on Environmental Impacts on Temporary Storage of Spent Fuel After Cessation of Reactor OperationML12334A387 |
Person / Time |
---|
Site: |
Davis Besse, Indian Point, Grand Gulf, Seabrook, Limerick, Crystal River, Diablo Canyon, Callaway, South Texas |
---|
Issue date: |
11/21/2012 |
---|
From: |
Clark K - No Known Affiliation |
---|
To: |
Rulemaking, Directives, and Editing Branch |
---|
References |
---|
77FR65137 00091, NRC-2012-0246 |
Download: ML12334A387 (1) |
|
|
---|
Category:General FR Notice Comment Letter
MONTHYEARML24313A2282024-11-0808 November 2024 Comment (6) E-mail Regarding Diablo Canyon Lr Draft EIS ML24313A2292024-11-0808 November 2024 Comment (7) E-mail Regarding Diablo Canyon Lr Draft EIS ML24313A2252024-11-0808 November 2024 Comment (4) E-mail Regarding Diablo Canyon Lr Draft EIS ML24313A2262024-11-0808 November 2024 Comment (5) E-mail Regarding Diablo Canyon Lr Draft EIS ML24313A2242024-11-0808 November 2024 Comment (3) E-mail Regarding Diablo Canyon Lr Draft EIS ML24310A1302024-11-0303 November 2024 Comment (2) E-mail Regarding Diablo Canyon Lr Draft EIS ML24310A1032024-11-0101 November 2024 Comment (1) E-mail Regarding Diablo Canyon Lr Draft EIS ML24313A0452024-11-0101 November 2024 Comment (1) of Khaled Asad on Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2; Draft Supplemental Environmental Impact Statement ML24108A0532024-02-29029 February 2024 Comment (51) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24056A0012024-02-24024 February 2024 Comment (50) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24055A0042024-02-24024 February 2024 Comment (49) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24055A0032024-02-24024 February 2024 Comment (48) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24054A0172024-02-23023 February 2024 Comment (37) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24054A0162024-02-23023 February 2024 Comment (36) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24058A0042024-02-23023 February 2024 Comment (4) of David Bender on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2 ML24058A0052024-02-23023 February 2024 Comment (5) of Tony Brown on Behalf of Nuclear Energy Institute (NEI) on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 an ML24058A0062024-02-23023 February 2024 Comment (6) of Nelson Chloe on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2 ML24058A0072024-02-23023 February 2024 Comment (7) of Kermit Kubitz on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2 ML24054A0872024-02-23023 February 2024 Comment (38) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24054A0902024-02-23023 February 2024 Comment (39) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24054A1102024-02-23023 February 2024 Comment (40) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24054A4442024-02-23023 February 2024 Comment (41) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24054A4592024-02-23023 February 2024 Comment (42) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24054A8482024-02-23023 February 2024 Comment (43) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24054A8492024-02-23023 February 2024 Comment (44) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24054A8502024-02-23023 February 2024 Comment (45) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24054A8512024-02-23023 February 2024 Comment (46) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24055A0022024-02-23023 February 2024 Comment (47) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24054A0012024-02-22022 February 2024 Comment (31) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24054A0002024-02-22022 February 2024 Comment (30) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24053A4162024-02-22022 February 2024 Comment (29) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24053A4152024-02-22022 February 2024 Comment (28) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24054A0022024-02-22022 February 2024 Comment (32) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24054A0032024-02-22022 February 2024 Comment (33) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24054A0042024-02-22022 February 2024 Comment (34) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24054A0052024-02-22022 February 2024 Comment (35) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24052A3632024-02-21021 February 2024 Comment (25) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24053A1432024-02-21021 February 2024 Comment (3) of Mila Vujovich-LaBarre on Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2 ML24053A0222024-02-21021 February 2024 Comment (27) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24053A0192024-02-21021 February 2024 Comment (26) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24052A3622024-02-21021 February 2024 Comment (24) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24051A1052024-02-20020 February 2024 Comment (23) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24050A0102024-02-19019 February 2024 Comment (22) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24050A0042024-02-18018 February 2024 Comment (21) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24050A0032024-02-18018 February 2024 Comment (20) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24046A0222024-02-15015 February 2024 Comment (17) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24047A0982024-02-15015 February 2024 Comment (19) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24108A0542024-02-15015 February 2024 Comment (52) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24047A0972024-02-15015 February 2024 Comment (18) E-mail Regarding Diablo Canyon Lr EIS Scoping ML24046A0792024-02-14014 February 2024 Comment (2) of Anonymous on Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2 2024-02-29
[Table view] |
Text
Page 1 of 1 As of: November 27, 2012 Received:
November 21, 2012 Status: PendingPost Tracking No. ljw-823x-bgbl Comments Due: January 02, 2013 Submission Type: Web Docket: NRC-2012-0246 Consideration on Environmental Impacts on Temporary Storage of Spent Fuel After Cessation of Reactor Operation Comment On: NRC-2012-0246-0001 Consideration of Environmental Impacts of Temporary Storage of Spent Fuel After Cessation of Reactor Operation Document:
NRC-2012-0246-DRAFT-0093 Comment on FR Doc # 2012-26295 i- -I V)01, Submitter Information
-N Name: Kenneth Clark 4--].i Address: 7/112 Sandy Lane Unionville, TN, 37180 Cr)C-)C/')General Comment The preferred alternative is to stop making irradiated nuclear fuel. NRC should cease licensing atomic reactors, which inevitably generate high-level radioactive waste, deadly for at least a million years. This includes the rejection of any more combined Construction and Operating License Applications (COLAs) for proposed new atomic reactors, such as those recently rubberstamped by NRC at Vogtle, GA and Summer, SC. But this also includes the rejection of any more 20 year license extensions, as NRC has rubberstamped at 73 reactors since the year 2000. Thus, such pending license extensions as at Indian Point 2 & 3 (NY), Crystal River 3 (FL), Diablo Canyon I & 2 (CA), Seabrook (NH), Davis-Besse (OH), South Texas 1 & 2 (TX), Limerick I & 2 (PA), Grand Gulf 1 (MS), and Callaway (MO) should all be rejected by NRC.(Beyond Nuclear has successfully applied the Nuke Waste Con Game victory to win from NRC two year delays in the finalization of licensing approvals for new reactors at Grand Gulf 2 in MS and Fermi 3 in MI, as well as for 20 year license extensions at Grand Gulf 1 in MS and Davis-Besse in OH.For the nearly 70,000 metric tons of irradiated nuclear fuel currently stored at U.S. atomic reactors, Hardened On-Site Storage (HOSS) should be required.
Pools, at risk of leaks, as well as catastrophic radioactivity leaks due to sudden drain downs or slower motion boil downs, should be emptied. The irradiated nuclear fuel should be transferred into on-site dry casks which are: designed and built to last for centuries; camoflagued to deter, and fortified to withstand, terrorist attacks; safeguarded against accidents; and prevented from corroding and leaking high-level radioactive waste into the environment, as by replacement once per generation, requiring either a pool or a hot cell in which to carry out such transfer operations.
https://www.fdms.gov/fdms-web-agency/component/contentstreamer?objectld=09000064...
11/27/2012