From:
Ara Marderosian <ara@sequoiaforestkeeper.org>
Sent:
Sunday, February 18, 2024 5:43 PM To:
DiabloCanyonEnvironmental.Resource
Subject:
[External_Sender] Oppose continuation of Diablo Canyon Nuclear Facility I oppose continuation of the operation of Diablo Canyon Nuclear Facility for the following reasons:
- We continue to have significant concerns about seismic safety. PG&E underestimates the risk of an earthquake-caused accident at Diablo Canyon and fails to consider recent data and analyses. There is evidence which shows that the two faults that run directly under the plant are vertical thrust faults, meaning they could cause much more ground motion than ever credited.
- Unit 1s Reactor Pressure Vessel poses an unacceptable safety risk due to serious indications of embrittlement coupled with a lack of information to establish otherwise.
Neither PG&E nor the NRC has taken any steps to assess the current condition of the pressure vessel. Extensive investigation has revealed an unprecedented and persistent pattern of neglect by PG&E and the NRC technical staff.
- The Once-Through Cooling system at Diablo Canyon violates federal law. The facility circulates 2.5 billion gallons of seawater throughout its cooling system each day. The water released back into the ocean is 20 degrees warmer. It annually sucks in and kills more than one billion fish in early life stages. The State Water Resources Control Board has allowed several waivers to the Clean Water Act by permitting the continued operation of Diablo Canyon.
- After decades of failed policy, there exists no environmentally safe, just, and equitable solution to the storage of the toxic waste. Generation of even more high level radioactive waste during the period of extended operation - in an active seismic area - exacerbates an already dangerous situation.
- PG&E is a convicted felon. PG&E has a long history of safety violations resulting in death and destruction:
Hinkley groundwater contamination, the San Bruno pipeline explosion, and some of California's worst wildfires. PG&E has been deemed responsible for more than 30 wildfires since 2017 which destroyed more than 23,000 homes and businesses and killed more than 100 people.
- There is enough evidence to show that extended operation of Diablo Canyon is not needed to keep the lights on! California now has more than 8,500 MW of energy storage capacity with more being added each year, plus up to 5,000 MW of demand response - more than sufficient to ensure grid reliability during extreme weather events.
- Extended operation of Diablo Canyon is too costly! The California Public Utilities Commission has stated that complete costs are unknown but are expected to exceed
$6 billion. The cost burden would be spread to other non-PG&E ratepayers throughout the State. This is expected to exceed $500 for every family of four.
- Keeping Diablo Canyon online would crowd out and slow down the development of alternatives (wind, solar, storage, efficiency, demand response). Because Diablo must operate 24/7, it limits uploading access to the grid by renewable resources.
Ara Mr. Ara Marderosian Board Secretary Sequoia ForestKeeper P.O. Box 836 Weldon, CA 93283 www.sequoiaforestkeeper.org
Federal Register Notice:
89FR4631 Comment Number:
20 Mail Envelope Properties (CAHA6GBUxGw-Z3sBvGDucFk+JzHD7EH1YEeXD39V5AHXoNbfGKg)
Subject:
[External_Sender] Oppose continuation of Diablo Canyon Nuclear Facility Sent Date:
2/18/2024 5:43:00 PM Received Date:
2/18/2024 5:43:22 PM From:
Ara Marderosian Created By:
ara@sequoiaforestkeeper.org Recipients:
"DiabloCanyonEnvironmental.Resource" <DiabloCanyonEnvironmental.Resource@nrc.gov>
Tracking Status: None Post Office:
mail.gmail.com Files Size Date & Time MESSAGE 3155 2/18/2024 5:43:22 PM Options Priority:
Normal Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date: