ML24313A045

From kanterella
Jump to navigation Jump to search
Comment (1) of Khaled Asad on Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2; Draft Supplemental Environmental Impact Statement
ML24313A045
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/01/2024
From: Asad K
- No Known Affiliation
To:
Office of Administration
References
NRC-2023-0192, 89FR87433 00001
Download: ML24313A045 (1)


Text

PUBLIC SUBMISSION As of: 11/8/24, 9:23 AM Received: November 01, 2024 Status: Pending_Post Tracking No. m2z-7hze-8m8v Comments Due: December 16, 2024 Submission Type: API Docket: NRC-2023-0192 Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2 Comment On: NRC-2023-0192-0013 Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2; Draft Supplemental Environmental Impact Statement Document: NRC-2023-0192-DRAFT-0010 Comment on FR Doc # 2024-25444 Submitter Information Name: Khaled Asad Address:

Amman jordan, Jordan, Email:Khaled.asad@icloud.com Phone:00962795522425 General Comment The water discharged from Diablo Canyons cooling system is returned to the ocean at an elevated temperature, typically 18 to 20 degrees Fahrenheit (about 10 to 11 degrees Celsius) above the ambient ocean temperature. This warmer water disperses gradually as it re-enters the sea, but it does create a localized thermal plume in the vicinity of the discharge area.

We need to upgrade the cooling system in return to the ocean Also: consider the quality of the water returned 11/8/24, 9:24 AM blob:https://www.fdms.gov/8c9aaf34-85c4-44da-b156-e8c604cd2cfd blob:https://www.fdms.gov/8c9aaf34-85c4-44da-b156-e8c604cd2cfd 1/1 SUNSI Review Complete Template=ADM-013 E-RIDS=ADM-03 ADD: Kim Conway, Antoinette Walker-Smith, Mary Neely Comment (1)

Publication Date:

11/1/2024 Citation: 89 FR 87433