Donald C. Cook Nuclear Plant, Units 1 and 2 - Request for Additional Information Regarding License Amendment Request to Relocate Surveillance Frequencies to Licensee Control (CAC Nos. MF7114 and MF7115)
ML16154A182
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/09/2016
From: Dietrich A W
Plant Licensing Branch III
To: Gebbie J P
Indiana & Michigan Electric Co
Dietrich A W, NRR-DORL 415-2846
References
CAC MF7114, CAC MF7115
Download: ML16154A182 (4)


Text

Mr. Joel P. Gebbie Senior Vice President and Chief Nuclear Officer UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C. 20555-0001 June 9, 2016 Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, Ml 49106

SUBJECT:

DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2 -REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST TO RELOCATE SURVEILLANCE FREQUENCIES TO LICENSEE CONTROL (CAC NOS. MF7114 AND MF7115)

Dear Mr. Gebbie:

By letter dated November 19, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15328A469), as supplemented by letter dated February 4, 2016 (ADAMS Accession No. ML 16039A240), Indiana Michigan Power Company (l&M, the licensee) submitted a license amendment request (LAR) for the Donald C. Cook Nuclear Plant, Units 1 and 2. The proposed changes are consistent with the NRG-approved Technical Specifications Task Force (TSTF) Traveler, TSTF-425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control -[Risk Informed Technical Specifications Task Force] Initiative Sb." The proposed change would relocate surveillance frequencies to a licensee controlled program, the Surveillance Frequency Control Program. The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the subject submittal, as supplemented, and has determined that additional information is needed to complete the review, as described in the enclosed request for additional information (RAI). The draft RAI was sent to l&M via electronic mail on May 27, 2016. The NRC staff clarified the draft RAI in a conference call conducted on June 1, 2016. A response to this RAI is expected by July 6, 2016.

J. Gebbie Please feel free to contact me at (301) 415-2846 if you have any questions or concerns.

Docket Nos. 50-315 and 50-316

Enclosure:

Request for Additional Information cc: Distribution via ListServ Sincerely, foAA Allison W. Dietrich, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RAl-TS-1 REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST TO RELOCATE SURVEILLANCE FREQUENCIES TO LICENSEE CONTROL DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2 DOCKET NOS. 50-315 AND 50-316 CAC NOS. MF7114 AND MF7115 The U.S. Nuclear Regulatory Commission (NRC) regulatory requirements related to the content of the technical specifications (TSs) surveillance requirements (SRs) are contained in Title 1 O of the Code of Federal Regulations (10 CFR) Section 50.36(c)(3).

Per 10 CFR 50.36(c)(3), SRs are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met. During the NRC staff's review to ensure that a change is in accordance with 1 O CFR 50.36, the staff uses NUREG-0800, Standard Review Plan, Chapter 16, Technical Specifications, as well as NUREG-1431, Revision 4, "Standard Technical Specifications, Westinghouse Plants," which contain approved TSTF-425, Revision 3, as guidance.

According to this guidance, the language in the proposed TS changes must be the same or equivalent to that in the current TS unless there is adequate technical\

or administrative reasoning supporting the change. The current SRs 3.6.9.1 and 3.6.9.2 for the Donald C. Cook Nuclear Plant, Unit 1, each contain a reference to a footnote 3 in the frequency column. There is no provision provided in the approved TSTF-425, Revision 3, for transfer of surveillance frequencies containing a footnote to the licensee controlled surveillance frequency control program. Please explain this apparent deviation from the approved TSTF-425, Revision 3. Enclosure J. Gebbie Please feel free to contact me at (301) 415-2846 if you have any questions or concerns.

Docket Nos. 50-315 and 50-316

Enclosure:

Request for Additional Information cc: Distribution via ListServ DISTRIBUTION:

PUBLIC LPL3-1 R/F RidsNrrDorlLpl3-1 Resource RidsNrrDssStsb Resource RidsNrrPMDCCook Resource RidsN rrLAS Roh re rResou rce RidsAcrsAcnw_MailCTR Resource PSnyder, NRR ADAMS Accession No.: ML 16154A182 OFFICE DORULPL3-1

/PM DORULPL3-1/LA NAME ADietrich SRohrer DATE 06/2/2016 06/2/2016 Sincerely, IRA/ Allison W. Dietrich, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

  • via memorandum DSS/STSB/BC*

DORULPL3-1/BC DORULPL3-1

/PM AKlein DWrona ADietrich 05/25/2016 06/7/2016 06/9/2016 OFFICIAL RECORD COPY