MONTHYEAR05000316/LER-2024-004, AB Emergency Diesel Generator Inoperable for Longer than Allowed by Technical Specifications2024-11-11011 November 2024 AB Emergency Diesel Generator Inoperable for Longer than Allowed by Technical Specifications IR 05000315/20240032024-10-31031 October 2024 Integrated Inspection Report 05000315/2024003 05000316/2024003 07200072/2024001 and Exercise of Enforcement Discretion AEP-NRC-2024-77, U2C28 Steam Generator Tube Inspection Report2024-10-21021 October 2024 U2C28 Steam Generator Tube Inspection Report AEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak IR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 ML24159A2522024-05-30030 May 2024 10 CFR 50.71(e) Update and Related Site Change Reports AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 2024-09-09
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24178A0432024-06-26026 June 2024 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - License Amendment Request Regarding Neutron Flux Instrumentation ML24156A0072024-05-30030 May 2024 NRR E-mail Capture - Final RAI - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - License Amendment Request Regarding Reserve Feed Enclosure ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20230102022-09-21021 September 2022 Notification of Post-Approval Site Inspection for License Renewal - Phase IV; IR 05000315/2023010; 05000316/2023010 and RFI ML22230A4362022-08-19019 August 2022 Licensed Operator Positive Fitness-For-Duty Test ML22049B4532022-02-22022 February 2022 Notification of NRC Baseline Inspection and Request for Information Report 05000315/2022002 ML21307A3352021-11-0303 November 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Final RAI - License Amendment Request Regarding Containment Water Level Instrumentation IR 05000315/20210132021-08-0303 August 2021 Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000315/2021013; 05000316/2021013 ML21140A3052021-05-20020 May 2021 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - Relief Request ISIR-4-11, Impractical Examinations for the Fourth 10-Year ISI Interval ML21049A2682021-02-16016 February 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Final RAI - License Amendment Request for One-Time Extension Containment Type a ILRT ML21026A3472021-01-26026 January 2021 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - Relief Request REL-PP2 for Pump and Valve IST Fifth 10-year Interval IR 05000315/20200112020-09-17017 September 2020 Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000315/2020011; 05000316/2020011 ML20181A4122020-06-29029 June 2020 NRR E-mail Capture - Final RAI - D.C. Cook 1 - One-Time Extension, Containment Type a ILRT Frequency ML20232B4562020-04-27027 April 2020 Request for Supporting Information for the D.C. Cook SPRA Audit Review - Fragility Questions IR 05000315/20200202020-04-10010 April 2020 Units 1 and 2 - Information Request for NRC Triennial Evaluation of Changes, Tests, and Experiments (50.59) Baseline Inspection 05000315/2020020 and 05000316/2020020 ML20232B4432020-03-25025 March 2020 Request for Supporting Information for the D.C. Cook SPRA Audit Review - Plant Response Model Questions ML19267A1362019-09-24024 September 2019 NRC Information Request (September 23, 2019) - IP 71111.08 - DC Cook U2 - Documents Selected for Onsite Review (DRS-M.Holmberg) ML19204A0962019-07-23023 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Request for Additional Information Related to Unit 2 Leak Before Break Analysis and Deletion of Containment Humidity Monitors for Unit Nos. 1 and 2 ML19211C3032019-07-0303 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 & 2 - Request for Additional Information Related to LAR to Address NSAL-15-1 ML19084A0002019-03-20020 March 2019 NRR E-mail Capture - Resubmitted: Draft Request for Additional Information DC Cook Unit 1 - Leak-Before-Break LAR ML19072A1432019-03-12012 March 2019 NRR E-mail Capture - Resubmitted: Draft Request for Additional Information DC Cook Unit 1 - Leak-Before-Break LAR ML19011A3512019-01-11011 January 2019 NRR E-mail Capture - Request for Additional Information DC Cook Unit 1 Leak Before Break Amendment ML18313A0802018-11-0808 November 2018 NRR E-mail Capture - D.C. Cook Units 1 and 2 - RAI for RPV Threads in Flange Alternative ML18263A1542018-09-14014 September 2018 NRR E-mail Capture - D.C. Cook Unit No. 1 - RAI for Leak-Before-Break LAR ML18204A3722018-07-19019 July 2018 NRR E-mail Capture - D.C. Cook Unit No. 1 - RAI for Leak-Before-Break LAR ML18143B6292018-05-29029 May 2018 Dtf. RAI ML18142B5312018-05-29029 May 2018 Request for Additional Information Concerning 2017 Decommissioning Funding Status Report ML18060A0212018-02-28028 February 2018 Enclosurequest for Additional Information (Request for Additional Information Regarding Indiana Michigan Power Company'S Decommissioning Funding Update for Donald C Cook Nuclear Plant Units 1 and 2 ISFSI) ML18043A0092018-02-0909 February 2018 NRR E-mail Capture - DC Cook, Unit 2 - Request for Additional Information Regarding Reactor Vessel Internals Again Management Program ML17304A0102017-11-0101 November 2017 Unit Nos.1 and 2 - Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9444 and MF9445; EPID L-2016-LRC-0001) ML17249A7492017-08-28028 August 2017 E-Mail Sent August 28, 2017, Request for Information for Donald C. Cook Nuclear Power Plant, Unit 1 (Part B); Inspection Report 05000315/2017004 (Msh) ML17108A7772017-04-18018 April 2017 17 Donald C. Cook Nuclear Power Plant, Unit 1 - Notification of NRC Baseline Inspection and Request for Information (05000315/2017003; 05000316/2017003) (Msh) ML17068A0652017-03-0808 March 2017 Ltr 03/08/17 Donald C. Cook Nuclear Power Plant, Unit 2 - Information Request for an NRC Post-Approval Site Inspection for License Renewal 05000316/2017009 (Bxj) ML17027A0192017-01-26026 January 2017 NRR E-mail Capture - D.C. Cook Units 1 and 2 - RAI Regarding LAR to Revise TS 5.5.14 (MF8483 and MF8484) ML16211A0152016-08-0101 August 2016 Follow-Up Request for Additional Information Regarding License Amendment Request to Relocate Surveillance Frequencies to Licensee Control IR 05000315/20160042016-07-11011 July 2016 Donald C. Cook Nuclear Power Plant, Unit 2 - Notification of NRC Inspection and Request for Information; Inspection Report 05000315/2016004; 05000316/2016004 ML16193A6542016-07-11011 July 2016 Notification of NRC Inspection and Request for Information; Inspection Report 05000315/2016004; 05000316/2016004 ML16154A1822016-06-0909 June 2016 Request for Additional Information Regarding License Amendment Request to Relocate Surveillance Frequencies to Licensee Control (CAC Nos. MF7114 and MF7115) ML16127A0792016-05-11011 May 2016 Request for Additional Information Regarding License Amendment Request to Relocate Surveillance Frequencies to Licensee Control ML16025A0552016-01-22022 January 2016 Ltr. 01/22/16 Donald C. Cook Nuclear Power Plant, Units 1 and 2 - Request for Information for an NRC Pilot Design Bases Inspection on the Implementation of the Environmental Qualification Program Inspection Report 05000315/2016008; 05000316 ML15267A6832015-10-0505 October 2015 Second Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 ML15231A5542015-08-18018 August 2015 Ltr. 08/18/15 Donald C. Cook Nuclear Power Plant, Units 1 and 2 - Request for Information for an NRC Triennial Pilot Baseline Component Design Bases Inspection (Inspection Report 05000315/2015008; 05000316/2015008) (Axd) ML15225A5772015-08-13013 August 2015 Information Request to Support Upcoming Problem Identification and Resolution Inspection at D.C. Cook, Units 1 and 2 ML15163A1672015-06-15015 June 2015 Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 ML15149A3832015-05-28028 May 2015 Information Request to Support NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) ML15119A3392015-05-0505 May 2015 Follow-up Request for Additional Information Concerning the Reactor Vessel Internals Aging Management Program Submittal ML15055A5702015-02-24024 February 2015 Cyber Security RFI Temporary Instruction 2201/004 ML15022A1532015-01-21021 January 2015 Dccook ISI Request for Information 2024-06-26
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 29, 2018 Mr. Joel P. Gebbie Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, Ml 49106
SUBJECT:
DONALD C. COOK NUCLEAR PLANT, UNIT NOS. 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION CONCERNING 2017 DECOMMISSIONING FUNDING STATUS REPORT
Dear Mr. Gebbie:
By letter dated March 21, 2017, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17081A443), Indiana Michigan Power Company (l&M, the licensee) submitted its biennial decommissioning funding status report for the Donald C. Cook Nuclear Plant (CNP), Unit Nos. 1 and 2.
The U.S. Nuclear Regulatory Commission staff has reviewed the subject submittal and determined that additional information is needed to complete the review, as described in the enclosed Request for Additional Information (RAI). Please respond to the enclosed RAI within 30 days of this letter.
Please feel free to contact me at (301) 415-3826 if you have any additional questions or concerns.
Sincerely,
- /;//
Allison W. Dietrich, Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-315 and 50-316
Enclosure:
Request for Additional Information cc: ListServ
REQUEST FOR ADDITIONAL INFORMATION REGARDING 2017 DECOMMISSIONING FUNDING STATUS REPORT DONALD C. COOK NUCLEAR PLANT UNIT NOS. 1 AND 2 DOCKET NOS. 50-315 AND 50-316 By letter dated March 21, 2017, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17081A443), Indiana Michigan Power Company (l&M, the licensee) submitted its biennial decommissioning funding status report to the U.S. Nuclear Regulatory Commission (NRC), for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 (CNP). The NRC staff has reviewed the submittal, and determined that additional information is necessary in order to complete its review.
Regulatory Basis for Request Regulatory Requirements Title 10 of the Code of Federal Regulations ( 10 CFR) 50. 2 states that "Decommission" means to remove a facility or site safely from service and reduce residual radioactivity to a level that permits: (1) Release of the property for unrestricted use and termination of the license; or (2) Release of the property under restricted conditions and termination of the license. Therefore, decommissioning, as used in the NRC regulations, refers to radiological decommissioning.
Regulation 10 CFR 50. 75 (f)(1) states, in part, that each power reactor licensee shall report, on a calendar-year basis, to the NRC by March 31, 1999, and at least once every 2 years thereafter on the status of its decommissioning funding for each reactor or part of a reactor that it owns. The information in this report must include, at a minimum, the amount of decommissioning funds estimated to be required pursuant to 10 CFR 50.75(b) and (c); the amount of decommissioning funds accumulated to the end of the calendar year preceding the date of the report; a schedule of the annual amounts remaining to be collected; the assumptions used regarding rates of escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates of other factors used in funding projections; any contracts upon which the licensee is relying pursuant to 10 CFR 50.75(e)(1 )(v); any modifications occurring to a licensee's current method of providing financial assurance since the last submitted report; and any material changes to trust agreements.
Regulation 10 CFR 50. 75(h)(2) states, in part, that disbursements or payments from the trust, escrow account, Government fund, or other account used to segregate and manage the funds, other than for payment of ordinary administrative costs (including taxes) and other incidental expenses of the fund (including legal, accounting, actuarial, and trustee expenses) in connection with the operation of the fund, are restricted to decommissioning expenses or transfer to another financial assurance method acceptable under 10 CFR 50. 75( e) until final decommissioning has been completed.
Enclosure
2 Regulation 10 CFR 50. 75(h)(2) further states that licensees that are "electric utilities" under 10 CFR 50.2 that use prepayment or an external sinking fund to provide financial assurance shall include a provision in the terms of the trust, escrow account, Government fund, or other account used to segregate and manage funds that except for withdrawals being made under 10 CFR 50.82(a)(8) or for payments of ordinary administrative costs (including taxes) and other incidental expenses of the fund (including legal, accounting, actuarial, and trustee expenses) in connection with the operation of the fund, no disbursement or payment may be made from the trust, escrow account, Government fund, or other account used to segregate and manage the funds until written notice of the intention to make a disbursement or payment has been given the Director, Office of Nuclear Reactor Regulation, Director, Office of New Reactors, or Director, Office of Nuclear Material Safety and Safeguards, as applicable, at least 30 working days before the date of the intended disbursement or payment. After decommissioning has begun and withdrawals from the decommissioning fund are made under 10 CFR 50.82(a)(8), no further notification need be made to the NRC.
Regulation 10 CFR 50.54(bb) states, in part, that for nuclear power reactors licensed by the NRC, the licensee shall, within 2 years following permanent cessation of operation of the reactor or 5 years before expiration of the reactor operating license, whichever occurs first, submit written notification to the Commission for its review and preliminary approval of the program by which the licensee intends to manage and provide funding for the management of all irradiated fuel at the reactor following permanent cessation of operation of the reactor until title to the irradiated fuel and possession of the fuel is transferred to the Secretary of Energy for its ultimate disposal in a repository.
Regulatory Guidance Regulatory Guide 1.184, "Decommissioning of Nuclear Power Reactors" (ADAMS Accession No. ML13144A840), states on page 6:
Funding for spent fuel maintenance and storage required by 10 CFR 50.54(bb) may be commingled in the same trust fund that is used for decommissioning but the licensee must be able to identify and track the amounts in the trust fund applicable for decommissioning activities and the amounts set aside for spent fuel management and other uses. This is because funds collected and set aside in the decommissioning trust for decommissioning are exclusively for radiological decommissioning as defined in 10 CFR 50.2. Therefore, the amount set aside for radiological decommissioning as required by 10 CFR 50. 75 should not be used for:
(1) the maintenance and storage of spent fuel in the spent fuel pool, (2) the design, construction, or decommissioning of spent fuel dry storage facilities directly related to permanent disposal, (3) other activities not directly related to radiological decontamination, or dismantlement of the facility or site.
Regulatory Issue Summary 2001-07, Revision 1, "10 CFR 50.75 Reporting and Recordkeeping for Decommissioning Planning," January 8, 2009 (ADAMS Accession No. ML083440158), states:
3 Recently, the NRG staff has learned that some licensees also reporting under 10 GFR 50.75(f) have provided figures for the accumulation of decommissioning funds that included funds accumulated for purposes other than to meet the NRG's decommissioning requirements. Therefore, the staff is also issuing this RIS to clarify for licensees the need to preserve the distinction between funds accumulated for radiological decommissioning, which licensees are required to report, and funds accumulated for other purposes."
Regulatory Issue Summary 2001-07, Revision 1, also states:
The NRG has not precluded the commingling in a single account of funds accumulated to comply with NRG radiological decommissioning requirements and funds accumulated to address State site restoration costs (State costs) and spent fuel management costs, as long as the licensee is able to identify and account for the NRG radiological decommissioning funds that are contained within its single account.
However, NRG staff has learned that some licensees, in response to the requirement that they report the amount of decommissioning funds accumulated to the end of the calendar year preceding the date of the report, have reported as part of that amount funds accumulated to address State costs and spent fuel management costs. Accordingly, NRG staff is clarifying for licensees the need to report radiological decommissioning fund balances that are distinct from amounts accumulated for other purposes, such as paying for State costs and spent fuel management.
Regulatory Issue Summary 2001-07, Revision 0, "10 GFR 50.75(f)(1) Reports on the Status of Decommissioning Funds (Due March 31, 2001 )," February 23, 2001 (ADAMS Accession No. ML010300068), states:
In 1999, some licensees reporting under 10 GFR 50. 75(f) indicated a combined total and did not distinguish between the radiological and non-radiological estimates. The staff is issuing this RIS to inform licensees of the need to preserve the distinction between NRG-defined cost estimates and all other decommissioning cost estimates in the reports they must submit by March 31, 2001.
RIS 2001-07, Revision 0, also states:
In reporting the financial status of decommissioning funds, licensees should either omit or list separately, the costs of non NRG-defined decommissioning activities, such as dismantling non-radiological systems and structures and the costs of managing and storing spent fuel on site.
These non-radiological costs are not counted as part of NRG's required decommissioning funding assurance.
Background
In its decommissioning funding status report dated March 21, 2017, l&M reported significant reductions in the balances of the Decommissioning Trust Fund (DTF)
4 accounts for CNP, Unit Nos. 1 and 2, from what was previously reported in its decommissioning funding status report dated March 20, 2015 (ADAMS Accession No. ML15084A007). These amounts are as follows.
In 2015, l&M reported the following:
- 2. The amount accumulated in the fund allocated to radiological decommissioning reflects the market value of the funds accumulated through December 31, 2014, net of all taxes currently due for items included in 10 CFR 50.75(b) and (c) are:
- a. Cook Unit 1 $537,925,429
- b. Cook Unit 2 $489,331,963
- c. Total $1,027,257,392 In 2017, l&M reported the following:
- 2. The amount accumulated in the fund allocated to radiological decommissioning reflects the market value of the funds accumulated through December 31, 2016, net of all taxes currently due for items included in 10 CFR 50.75(b) and (c) are:
- a. Cook Unit 1 $459,454,502
- b. Cook Unit 2 $418,248,246
- c. Total $877,702,748 The NRC staff review of these submittals (2015 and 2017) revealed end-of-year balances that had been reduced by $78,470,927 and $71,083,717 for CNP Unit Nos. 1 and 2, respectively, or $149,554,644 collectively. The staff notes that market growth during this period of time was approximately 9%. Therefore, the staff expected the DTF balances for CNP, Unit Nos. 1 and 2, to have increased accordingly.
On April 10, 2018, a Category I public meeting was held between the NRC staff and representatives of l&M via teleconference (ADAMS Accession No. ML18109A069). The NRC staff requested that l&M explain whether there had been a withdrawal of funds from the DTF, and if not, explain the decrease in these funds allocated in the trust fund balances dedicated for radiological decommissioning. In response to the staff's question, the licensee affirmed that there had been no withdrawals. The l&M staff stated that the total value of the account had increased, in alignment with overall market conditions, but that the percent allocated for radiological decommissioning had decreased. The licensee explained that the decrease was due to a 2017 site-specific cost study at CNP, which determined that additional funding would be required in the future for spent fuel management. Therefore, l&M had reallocated a percentage of the funds in the DTF, previously allocated for radiological decommissioning, to be used for future maintenance of CNP's independent spent fuel storage installation (ISFSI),
pursuant to 10 CFR 50.54(bb). The licensee stated that in preparing its biennial submittal to the NRC, it had followed the guidance provided in RIS 2001-07, Revision 1.
The NRC staff stated that, per the NRC's regulations, funds that have previously been reported as dedicated for radiological decommissioning cannot be repurposed for non-radiological decommissioning purposes such as for spent fuel management. Thus, the
5 amount of funds reported biennially is generally expected to increase over time unless adversely affected by market conditions. The licensee responded that l&M had not made a disbursement from the account, only reallocated the funds in the account for future spent fuel management expenses.
Requests for Additional Information
RAI 1
As described above, the end-of-year balance in the DTFs reported to the NRC for CNP, Unit Nos. 1 and 2, decreased between 2015 and 2017. During the April 10, 2018, public meeting, l&M indicated that there was no disbursement from the decommissioning fund.
Confirm whether the reported decrease of decommissioning funding between 2015 and 2017 was the result of a withdrawal or disbursement from the DTFs for CNP, Unit Nos. 1 and 2.
RAI 2
During the April 10, 2018, public meeting, l&M stated that the reduction in the amount of decommissioning funding reported to the NRC between 2015 and 2017 was due to the reallocation of the DTFs for CNP, Unit Nos. 1 and 2. Specifically, l&M indicated that it repurposed a percentage of the DTFs previously allocated to radiological decommissioning in 2015, to spent fuel management in 2017. Confirm whether funds allocated to radiological decommissioning within the DTFs for CNP, Unit Nos. 1 and 2, as reported to the NRC in 2015, were repurposed in 2017 for use for spent fuel management.
RAl3 If funds allocated for radiological decommissioning in 2015 were repurposed for spent fuel management, provide the reason for repurposing the funds. In your response, provide the regulatory basis for repurposing funds in the DTFs, including an explanation of why this practice is consistent with NRC regulations and guidance. Indicate whether l&M intends to request a regulatory exemption to use its DTFs for CNP, Unit Nos. 1 and 2, for spent fuel management.
RAl4 Were funds allocated to radiological decommissioning in 2015 reallocated for any other purpose in 2017? If so, explain why the funds were repurposed.
RAIS Assuming funds allocated to radiological decommissioning in 2015 in the DTFs for CNP, Unit Nos. 1 and 2, were repurposed (for any reason), provide the following information:
(1) the percentage of the DTF allocated to radiological decommissioning in the 2015 status report; (2) the percentage of the DTF allocated to radiological decommissioning in the 2017 status report; (3) the percentage and dollar amount of decommissioning funding that was repurposed between 2015 and 2017.
ML181428531 Package No: ML181438612 RAI No: ML181438629 *via memorandum OFFICE DORL/LPL3/PM D0RL/LPL3/LA DLP/PFPB/BC* D0RL/LPL3/BC D0RL/LPL3/PM NAME ADietrich $Rohrer ABowers DWrona ADietrich DATE 5/22/18 5/23/18 5/17/18 5/29/18 5/29/18