Similar Documents at Cook |
---|
Category:Inspection Report Correspondence
MONTHYEARML23117A0062023-04-27027 April 2023 Review of the Spring 2022 Steam Generator Tube Inspections Report IR 05000315/20224022022-07-0505 July 2022 Material Control and Accounting Program Inspection Report 05000315/2022402 and 05000316/2022402 IR 05000315/20214032021-11-17017 November 2021 Security Baseline Inspection Report 05000315/2021403 and 05000316/2021403 IR 05000315/20214012021-10-21021 October 2021 Cyber Security Inspection Report 05000315/2021401 and 05000316/2021401 IR 05000315/20164072016-08-15015 August 2016 Cyber Security Problem and Identification Inspection Report 05000315/2016407; 05000316/2016407 - Cover Letter Only IR 05000315/20164052016-08-12012 August 2016 NRC Security Baseline Inspection Report 05000315/2016405; 05000316/2016405 (Cover Letter Only) IR 05000315/20160042016-07-11011 July 2016 Donald C. Cook Nuclear Power Plant, Unit 2 - Notification of NRC Inspection and Request for Information; Inspection Report 05000315/2016004; 05000316/2016004 ML16193A6542016-07-11011 July 2016 Notification of NRC Inspection and Request for Information; Inspection Report 05000315/2016004; 05000316/2016004 ML16025A0552016-01-22022 January 2016 Ltr. 01/22/16 Donald C. Cook Nuclear Power Plant, Units 1 and 2 - Request for Information for an NRC Pilot Design Bases Inspection on the Implementation of the Environmental Qualification Program Inspection Report 05000315/2016008; 05000316 IR 05000315/20085012009-02-13013 February 2009 IR 05000315-08-501, IR 05000316-08-501, on 12/31/2008, Donald C. Cook Nuclear Power Plant - NRC Emergency Preparedness Annual Inspection Report; NRC Security Annual Inspection Report IR 05000315-08-401, IR 05000316-08-401 ML0808703952008-03-26026 March 2008 IR 05000315-08-003 and 05000316-08-003, on 05/12/2008, D.C. Cook Nuclear Power Plant, TI-166 Request for Information NRC Inspection of Temporary Instruction 2515-166 IR 05000315/20074032007-07-20020 July 2007 IR 05000315-07-403, and IR 05000316-07-403, (Drs), on 06/11/2007 - 06/15/2007, D.C. Cook, Units 1 and 2, Routine Security Baseline Inspection - Cover Letter IR 05000315/20060072007-02-12012 February 2007 IR 05000315-06-007, IR 05000316-06-007, on 10/01/2006-12/31/2006, D. C. Cook Nuclear Power Plant, Units 1 and 2, Evaluation of Changes, Tests, or Experiments, Inservice Inspection Activities ML0210603072002-04-16016 April 2002 IR 05000315/2002-002(DRP), IR 05000316/2002-002(DRP), on 02/09-03/31/2002, Indiana Michigan Power Company, D.C. Cook Nuclear Power Plant, Units 1 and 2. Post Maintenance Testing, Surveillance Testing, Performance Indicator Verification IR 05000315/20010192002-01-23023 January 2002 IR 05000315/2001-019(DRP), IR 05000316/2001-019(DRP), on 11/18-12/29/2001; Indiana Michigan Power Company, D.C. Cook Nuclear Power Plant, Units 1 and 2. Fire Protection, Radiological Environmental and Radioactive Material. Violations Noted 2023-04-27
[Table view] Category:Letter
MONTHYEARIR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report ML23159A0192023-06-13013 June 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report ML23131A3282023-05-11011 May 2023 D.C. Cook Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000315/2023404 and 05000316/2023404 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report ML23117A0062023-04-27027 April 2023 Review of the Spring 2022 Steam Generator Tube Inspections Report ML23114A1142023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report ML23076A0212023-03-20020 March 2023 Request for Information for NRC Commercial Grade Dedication Inspection; Inspection Report 05000315/2023011; 05000316/2023011 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 ML23066A1882023-03-0707 March 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Donald C. Cook Nuclear Plant IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation ML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in ML22340A1392022-11-30030 November 2022 Submittal of Revision 31 to Updated Final Safety Analysis Report and 10CFR50.71(e) Updated and Related Site Change Reports IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 2024-01-08
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 ML22264A1112022-09-21021 September 2022 Notification of Post-Approval Site Inspection for License Renewal - Phase IV; IR 05000315/2023010; 05000316/2023010 and RFI ML22230A4362022-08-19019 August 2022 Licensed Operator Positive Fitness-For-Duty Test ML22049B4532022-02-22022 February 2022 Notification of NRC Baseline Inspection and Request for Information Report 05000315/2022002 ML21307A3352021-11-0303 November 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Final RAI - License Amendment Request Regarding Containment Water Level Instrumentation ML21215A1242021-08-0303 August 2021 Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000315/2021013; 05000316/2021013 ML21140A3052021-05-20020 May 2021 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - Relief Request ISIR-4-11, Impractical Examinations for the Fourth 10-Year ISI Interval ML21049A2682021-02-16016 February 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Final RAI - License Amendment Request for One-Time Extension Containment Type a ILRT ML21026A3472021-01-26026 January 2021 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - Relief Request REL-PP2 for Pump and Valve IST Fifth 10-year Interval IR 05000315/20200112020-09-17017 September 2020 Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000315/2020011; 05000316/2020011 ML20181A4122020-06-29029 June 2020 NRR E-mail Capture - Final RAI - D.C. Cook 1 - One-Time Extension, Containment Type a ILRT Frequency ML20232B4562020-04-27027 April 2020 Request for Supporting Information for the D.C. Cook SPRA Audit Review - Fragility Questions IR 05000315/20200202020-04-10010 April 2020 Units 1 and 2 - Information Request for NRC Triennial Evaluation of Changes, Tests, and Experiments (50.59) Baseline Inspection 05000315/2020020 and 05000316/2020020 ML20232B4432020-03-25025 March 2020 Request for Supporting Information for the D.C. Cook SPRA Audit Review - Plant Response Model Questions ML19267A1362019-09-24024 September 2019 NRC Information Request (September 23, 2019) - IP 71111.08 - DC Cook U2 - Documents Selected for Onsite Review (DRS-M.Holmberg) ML19204A0962019-07-23023 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Request for Additional Information Related to Unit 2 Leak Before Break Analysis and Deletion of Containment Humidity Monitors for Unit Nos. 1 and 2 ML19211C3032019-07-0303 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 & 2 - Request for Additional Information Related to LAR to Address NSAL-15-1 ML19084A0002019-03-20020 March 2019 NRR E-mail Capture - Resubmitted: Draft Request for Additional Information DC Cook Unit 1 - Leak-Before-Break LAR ML19072A1432019-03-12012 March 2019 NRR E-mail Capture - Resubmitted: Draft Request for Additional Information DC Cook Unit 1 - Leak-Before-Break LAR ML19011A3512019-01-11011 January 2019 NRR E-mail Capture - Request for Additional Information DC Cook Unit 1 Leak Before Break Amendment ML18313A0802018-11-0808 November 2018 NRR E-mail Capture - D.C. Cook Units 1 and 2 - RAI for RPV Threads in Flange Alternative ML18263A1542018-09-14014 September 2018 NRR E-mail Capture - D.C. Cook Unit No. 1 - RAI for Leak-Before-Break LAR ML18204A3722018-07-19019 July 2018 NRR E-mail Capture - D.C. Cook Unit No. 1 - RAI for Leak-Before-Break LAR ML18143B6292018-05-29029 May 2018 Dtf. RAI ML18142B5312018-05-29029 May 2018 Request for Additional Information Concerning 2017 Decommissioning Funding Status Report ML18060A0212018-02-28028 February 2018 Enclosurequest for Additional Information (Request for Additional Information Regarding Indiana Michigan Power Company'S Decommissioning Funding Update for Donald C Cook Nuclear Plant Units 1 and 2 ISFSI) ML18043A0092018-02-0909 February 2018 NRR E-mail Capture - DC Cook, Unit 2 - Request for Additional Information Regarding Reactor Vessel Internals Again Management Program ML17304A0102017-11-0101 November 2017 Unit Nos.1 and 2 - Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9444 and MF9445; EPID L-2016-LRC-0001) ML17249A7492017-08-28028 August 2017 E-Mail Sent August 28, 2017, Request for Information for Donald C. Cook Nuclear Power Plant, Unit 1 (Part B); Inspection Report 05000315/2017004 (Msh) ML17108A7772017-04-18018 April 2017 17 Donald C. Cook Nuclear Power Plant, Unit 1 - Notification of NRC Baseline Inspection and Request for Information (05000315/2017003; 05000316/2017003) (Msh) ML17068A0652017-03-0808 March 2017 Ltr 03/08/17 Donald C. Cook Nuclear Power Plant, Unit 2 - Information Request for an NRC Post-Approval Site Inspection for License Renewal 05000316/2017009 (Bxj) ML17027A0192017-01-26026 January 2017 NRR E-mail Capture - D.C. Cook Units 1 and 2 - RAI Regarding LAR to Revise TS 5.5.14 (MF8483 and MF8484) ML16211A0152016-08-0101 August 2016 Follow-Up Request for Additional Information Regarding License Amendment Request to Relocate Surveillance Frequencies to Licensee Control IR 05000315/20160042016-07-11011 July 2016 Donald C. Cook Nuclear Power Plant, Unit 2 - Notification of NRC Inspection and Request for Information; Inspection Report 05000315/2016004; 05000316/2016004 ML16193A6542016-07-11011 July 2016 Notification of NRC Inspection and Request for Information; Inspection Report 05000315/2016004; 05000316/2016004 ML16154A1822016-06-0909 June 2016 Request for Additional Information Regarding License Amendment Request to Relocate Surveillance Frequencies to Licensee Control (CAC Nos. MF7114 and MF7115) ML16127A0792016-05-11011 May 2016 Request for Additional Information Regarding License Amendment Request to Relocate Surveillance Frequencies to Licensee Control ML16025A0552016-01-22022 January 2016 Ltr. 01/22/16 Donald C. Cook Nuclear Power Plant, Units 1 and 2 - Request for Information for an NRC Pilot Design Bases Inspection on the Implementation of the Environmental Qualification Program Inspection Report 05000315/2016008; 05000316 ML15267A6832015-10-0505 October 2015 Second Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 ML15231A5542015-08-18018 August 2015 Ltr. 08/18/15 Donald C. Cook Nuclear Power Plant, Units 1 and 2 - Request for Information for an NRC Triennial Pilot Baseline Component Design Bases Inspection (Inspection Report 05000315/2015008; 05000316/2015008) (Axd) ML15225A5772015-08-13013 August 2015 Information Request to Support Upcoming Problem Identification and Resolution Inspection at D.C. Cook, Units 1 and 2 ML15163A1672015-06-15015 June 2015 Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 ML15149A3832015-05-28028 May 2015 Information Request to Support NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) ML15119A3392015-05-0505 May 2015 Follow-up Request for Additional Information Concerning the Reactor Vessel Internals Aging Management Program Submittal ML15055A5702015-02-24024 February 2015 Cyber Security RFI Temporary Instruction 2201/004 ML15022A1532015-01-21021 January 2015 Dccook ISI Request for Information ML14363A4912015-01-16016 January 2015 DC Cook Nuclear Plant, Units 1 and 2 - Supplemental Information Needed for Acceptance of Requested Licensing Action to Adopt TSTF-490, Rev.0, Deletion of E-Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Sp ML14246A4992014-08-26026 August 2014 NRR E-mail Capture - Donald C. Cook Nuclear Plant, Units 1 and 2 - Draft Requests for Additional Information (Scvb) Change to TS 5.5.14 by Adopting NEI 94-01, Revision 3-A ML14135A3202014-06-0606 June 2014 Request for Additional Information Concerning the Reactor Vessel Internals Afing Management Program Submittal 2023-12-19
[Table view] |
See also: IR 05000315/2016008
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE RD. SUITE 210
LISLE, IL 60532-4352
January 22, 2016
Mr. Larry Weber
Senior VP and Chief Nuclear Officer
Indiana Michigan Power Company
Nuclear Generation Group
One Cook Place
Bridgman, MI 49106
SUBJECT: DONALD. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 - REQUEST
FOR INFORMATION FOR AN NRC PILOT DESIGN BASES INSPECTION ON
THE IMPLEMENTATION OF THE ENVIRONMENTAL QUALIFICATION
PROGRAM INSPECTION REPORT 05000315/2016008; 05000316/2016008
Dear Mr. Weber:
On May 9, 2016, the U. S. Nuclear Regulatory Commission (NRC) will begin the pilot program
portion of the triennial baseline Design Bases Inspection (DBI) at Donald C. Cook Nuclear
Power Plant, Units 1 and 2. This inspection will be performed in accordance with NRC
Baseline Inspection Procedure 71111.21N.
The inspection will focus on the implementation of the Environmental Qualification (EQ)
Program. The EQ components to be reviewed during this baseline inspection will be identified
during the in-office preparation week that occurs prior to the first onsite inspection week.
The inspection will include a bagman trip to support selection of components and one week
of onsite inspection. The inspection team will consist of three NRC inspectors. The current
inspection schedule is as follows:
- Bagman trip onsite week: March 29 - 30, 2016
- Inspection onsite week: May 9 - 13, 2016
The team will be preparing for the inspection, mainly during the week of May 2 - 6, 2016, as
discussed in the enclosure.
Experience with previous baseline design inspections of similar depth and length has shown
that this type of inspection is extremely resource intensive, both for the NRC inspectors and the
licensee staff. In order to minimize the inspection impact on the site and to ensure a productive
inspection for both parties, we have enclosed a request for information needed for the
inspection.
L. Weber -2-
It is important that all of these documents are up-to-date and complete in order to
minimize the number of additional documents requested during the preparation and/or the
onsite portions of the inspection. Insofar as possible, this information should be provided
electronically to the lead inspector. The information request has been divided into four groups:
- The first group lists information necessary for our initial inspection scoping
activities. This information should be provided to the lead inspector no later than
March 1, 2016. By March 15, 2016, the lead inspector will communicate the
initial selected set of approximately 12 EQ components.
- The second group of documents requested is those items needed to support the
bagman trip. This set of documents should be available to the lead inspector onsite
on March 29, 2016.
- The third group of documents requested is those items needed to support our in-
office preparation activities for the selected set of 6 - 9 EQ components. This set of
documents should be provided to the lead inspector at the Regional Office no later
than April 27, 2016. During the in-office preparation activities, the team may identify
additional information needed to support the inspection.
- The last group includes the additional information above as well as plant specific
reference material. This information should be available to the team onsite on
May 9, 2016. It is also requested that corrective action documents and/or questions
developed during the inspection be provided to the lead inspector as the documents
are generated.
The lead inspector for this inspection is Mr. Andrew Dunlop. We understand that our licensing
contact for this inspection is Mr. Rick Wynegar of your organization. If there are any questions
about the inspection or the material requested in the enclosure, please contact the lead
inspector at (630) 829-9726, or via e-mail at Andrew.Dunlop@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required
to respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter, its enclosure, and your response (if any) will be available electronically for public
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
L. Weber -3-
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
/RA/
Christine A. Lipa, Chief
Engineering Branch 2
Division of Reactor Safety
Docket Nos. 50-315; 50-316
License Nos. DPR-58; DPR-74
Enclosure:
Request for Information - Design Bases Inspection
cc: Distribution via LISTSERV
REQUEST FOR INFORMATION - DESIGN BASES INSPECTION
Inspection Report: 05000315/2016008; 05000316/2016008
Bagman Dates: March 29 - 30, 2016
Inspection Dates: May 9 - 13, 2016
Inspection Procedure: IP 71111.21N, Design Bases Inspection
Lead Inspector: Andrew Dunlop, Senior Reactor Engineer, DRS
(630) 829-9726
Andrew.Dunlop@nrc.gov
I. Information Requested Prior to the Onsite Information Gathering/Bagman Week
The following information is requested by March 1, 2016, or sooner, to facilitate
inspection preparation. If you have any questions regarding this information, please
call the team leader as soon as possible. (Please provide the information electronically
in pdf files, Excel, or other searchable formats, preferably on some portable electronic
media (e.g., CD-ROM, DVD, etc.). The portable electronic media should contain
descriptive names, and be indexed and hyperlinked to facilitate ease of use.
Information in lists should contain enough information to be easily understood
by someone who has knowledge of light water reactor technology).
1. Risk-ranking of top 250 components from your site specific probabilistic safety
analysis (PSA) sorted by Fussell Vesely Importance.
2. PSA listing of top ten risk-significant systems.
3. Electronic copies of Updated Final Safety Analysis Report, Technical
Specifications, and Technical Specifications Bases. Specifically identify which
Updated Final Safety Analysis Report sections address environmental (including
seismic) qualification (EQ).
4. NRC Safety Evaluation Report(s) associated with EQ.
5. Identify the various EQ standards (including year, edition, or revision) that the
station is committed to.
6. Copy of EQ Design Basis Document, if applicable.
7. Copy of any licensing commitments related to EQ, if applicable.
8. Equipment Qualification Master List (EQML). Specific issues to be identified
include: safety classification (safety-related or nonsafety-related), Regulatory
Guide 1.97 instrumentation, EQ qualification (e.g. DOR, NUREG 588, 50.49),
original or replaced after implementation of 50.49, and plant location.
Enclosure
REQUEST FOR INFORMATION - DESIGN BASES INSPECTION
9. List of any installed equipment removed from the EQML and basis for removal.
10. For units that have entered the period of extended operation, if EQ files were
reviewed for Aging Management effects of license renewal, identify which EQ
files were modified/changed to incorporate appropriate actions for the period of
extended operation. Copies of any EQ Aging Management Programs.
11. List or drawings of plant areas that are subjected to EQ, identifying design
(limiting) temperature, both normal and accident, high-energy line break,
radiation levels, etc. that the associated equipment will have to be qualified
to meet EQ. If unit has obtained a power uprate (greater than 5 percent)
provide same information pre-update (earliest available if multiple uprates).
12. Site (and corporate if applicable) procedures associated with the 10 CFR 50.49
EQ Program for electrical components. Include procedures for procurement of
qualified equipment, maintenance of qualified equipment, modification to
qualified equipment (including equivalency or commercial grade dedication
(CGD) programs), and material storage and shelf life controls.
13. List of CGD evaluations performed, for which the dedicated parts have been
issued for installation (parts issued for the last 10 years) on EQ applications
in the plant. Include CGD evaluation number, name of part, component ID
number or description of the component the part was issued to repair, work
order, and date issued or installed.
14. List of Condition Reports (CRs) related to the EQ Program or EQ of components
for the last 5 years.
15. Current management and engineering organizational chart.
II. Information Requested (for the approximate 9 - 12 selected components) to be
Available by the Bagman Trip on March 29, 2016.
1. EQ Summary Report for each component/subcomponent.
2. Qualification Maintenance Requirement Sheet (QMRS) or equivalent.
3. List of CRs (corrective action documents) associated with each of the selected
components for the last 5 years.
4. Photos of any component in containment or high-radiation areas, if available.
III. Information Requested (for the approximate 6 - 9 selected components) to be
Available by April 27, 2016, (will be reviewed by the team in the Regional office
during the week of May 2 - 6, 2016).
This information should be separated for each selected component, especially if
provided electronically (e.g., folder with component name that includes EQ files,
Qualification Test Reports, calculations, CRs, maintenance history, etc.).
1. EQ file, including associated Qualification Test Reports.
2. Vendor manual (electronic copy or availability of hard copy during inspection).
2
REQUEST FOR INFORMATION - DESIGN BASES INSPECTION
3. Preventive maintenance template.
4. Last performed work order (WO) for each associated EQ preventive
maintenance.
5. List of corrective maintenance WOs for the last 10 years. Include WO number,
date performed, and brief one line description.
6. If repair work (e.g., a motor rewind) was performed under a purchase order,
provide copy of the purchase order.
7. Thermal life calculation.
8. Any self-assessments of the EQ Program for the last 3 years.
IV. Additional Information to be Provided on May 9, 2016, Onsite
1. During the in-office preparation activities, the team may identify additional
information needed to support the inspection. The lead inspector will provide a
list of the additional information needed during the week of May 2 - 6, 2016.
V. Information Requested to be Provided Throughout the Inspection
1. Copies of any corrective action documents generated as a result of the teams
questions or queries during this inspection.
2. Copies of the list of questions submitted by the team members and the
status/resolution of the information requested (provide daily during the
inspection to each team member).
If you have questions regarding the information requested, please contact the lead inspector.
3
L. Weber -3-
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
/RA/
Christine A. Lipa, Chief
Engineering Branch 2
Division of Reactor Safety
Docket Nos. 50-315; 50-316
License Nos. DPR-58; DPR-74
Enclosure:
Request for Information - Design Bases Inspection
cc: Distribution via LISTSERV
DISTRIBUTION:
Kimyata MorganButler
RidsNrrDorlLpl3-1 Resource
RidsNrrPMDCCook Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
Darrell Roberts
Richard Skokowski
Allan Barker
Carole Ariano
Linda Linn
DRPIII
DRSIII
Jim Clay
Carmen Olteanu
ADAMS Accession Number ML16025A055
Publicly Available Non-Publicly Available Sensitive Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE RIII RIII
NAME CLipa for ADunlop:cl CLipa
DATE 01/22/16 01/22/16
OFFICIAL RECORD COPY