Similar Documents at Cook |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217J4721999-10-15015 October 1999 Forwards NRC Physical Security Insp Repts 50-315/99-27 & 50-316/99-27 on 990920-24.Two Violations Noted & Being Treated as Ncvs,Consistent with App C of Enforcement Policy. Areas Examined Exempt from Disclosure,Per 10CFR73.21 IA-99-379, First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety1999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20217D9241999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0721999-07-29029 July 1999 Forwards LER 99-018-00 Re Refueling Water Storage Tank Suction Motor Operated Valves Inoperable,Due to Inadequate Design.Listed Commitments Were Identified in LER ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46. ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML17326A0631999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML17326A0311999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML20196K5961999-06-30030 June 1999 Ltr Contract:Task Order 40, DC Cook Extended Sys Regulatory Review Oversight Insp, Under Contract NRC-03-98-021 ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl ML17326A0121999-06-18018 June 1999 Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. ML17325B6281999-06-0101 June 1999 Forwards LER 99-S03-00,re Nonconforming Vital Area Barriers.Commitments Made by Util Are Listed ML17325B6401999-06-0101 June 1999 Forwards LER 99-013-00 Re Safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Lead to ECCS Pump Failure.Listed Commitments Identified in Submittal ML17325B6331999-05-28028 May 1999 Forwards LER 99-S02-00,re Vulnerability in Safeguard Sys That Could Allow Unauthorized or Undetected Access to Protected Area.Commitments Made by Util Are Listed ML17265A8201999-05-24024 May 1999 Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal ML20207A9201999-05-21021 May 1999 Ack Receipt of 990319 Response to Notice of Violation & Proposed Imposition of Civil Penalty .On 981124, Licensee Remitted Check for Payment of Civil Penalties. Licensee Requests for Extension for Response,Granted ML17325B6111999-05-21021 May 1999 Forwards Annual Radioactive Effluent Release Rept for 980101-1231 for DC Cook Nuclear Plant,Units 1 & 2. Transmittal of Submittal Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17325B6031999-05-21021 May 1999 Provides Response to NRC GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. ML17325B5971999-05-20020 May 1999 Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed ML17335A5281999-05-12012 May 1999 Forwards DC Cook Nuclear Plant Fitness for Duty Program Performance Dtd for six-month Period of 980701-1231,IAW 10CFR26.71(d).Info Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17335A5271999-05-11011 May 1999 Forwards Details Re Sources & Levels of Insurance Maintained for DC Cook,Units 1 & 2,as of 990401,per 10CFR50.54(w)(3). Info Was Delayed Beyond Required Date Due to Internal Oversight ML17325B5841999-05-10010 May 1999 Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed ML17325B5871999-05-0707 May 1999 Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current Esrr Schedule Provided for Info Purposes,Reflecting Revised Target Dates ML17325B5791999-05-0404 May 1999 Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed ML17325B5821999-05-0404 May 1999 Provides Addl Background,Description & Clarification of Previous & Revised Commitments Re UFSAR Revalidation Effort. Commitment Change Involved Alignment of UFSAR Revalidation Program Methodology to Strategy Contained in Current Plan ML17325B5741999-05-0303 May 1999 Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal ML17325B5631999-04-22022 April 1999 Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227 ML17325B5561999-04-16016 April 1999 Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed ML20205P0591999-04-14014 April 1999 Ninth Partial Response to FOIA Request for Documents.App Records Already Available in Pdr.Records in App T Encl & Being Made Available in Pdr.App U Records Being Released in Part (Ref FOIA Exemption 7).App V Records Withheld Entirely ML17325B5451999-04-12012 April 1999 Forwards LER 99-009-00 Re as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit.Commitments Identified in Submittal Listed ML17325B5301999-04-0707 April 1999 Forwards LER 99-S01-01, Vulnerability in Locking Mechanism of Four Vital Area Gates, Per 10CFR50.73.Commitments Made by Util,Listed ML17325B5241999-04-0505 April 1999 Forwards Revs 0 & 1 to Cook Nuclear Plant Restart Plan, Dtd 980307 & 0407.Rev 5 Is Current Cook Nuclear Plant Restart & Supercedes Previous Revs in All Respects ML17325B5121999-04-0101 April 1999 Forwards LER 99-007-00, Calculations Show That Divider Barrier Between Upper & Lower Containment Vols May Be Overstressed. Commitments Made by Util Are Listed 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0721999-07-29029 July 1999 Forwards LER 99-018-00 Re Refueling Water Storage Tank Suction Motor Operated Valves Inoperable,Due to Inadequate Design.Listed Commitments Were Identified in LER ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46. ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML17326A0631999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML17326A0311999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl ML17326A0121999-06-18018 June 1999 Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. ML17325B6401999-06-0101 June 1999 Forwards LER 99-013-00 Re Safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Lead to ECCS Pump Failure.Listed Commitments Identified in Submittal ML17325B6281999-06-0101 June 1999 Forwards LER 99-S03-00,re Nonconforming Vital Area Barriers.Commitments Made by Util Are Listed ML17325B6331999-05-28028 May 1999 Forwards LER 99-S02-00,re Vulnerability in Safeguard Sys That Could Allow Unauthorized or Undetected Access to Protected Area.Commitments Made by Util Are Listed ML17265A8201999-05-24024 May 1999 Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal ML17325B6111999-05-21021 May 1999 Forwards Annual Radioactive Effluent Release Rept for 980101-1231 for DC Cook Nuclear Plant,Units 1 & 2. Transmittal of Submittal Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17325B6031999-05-21021 May 1999 Provides Response to NRC GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. ML17325B5971999-05-20020 May 1999 Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed ML17335A5281999-05-12012 May 1999 Forwards DC Cook Nuclear Plant Fitness for Duty Program Performance Dtd for six-month Period of 980701-1231,IAW 10CFR26.71(d).Info Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17335A5271999-05-11011 May 1999 Forwards Details Re Sources & Levels of Insurance Maintained for DC Cook,Units 1 & 2,as of 990401,per 10CFR50.54(w)(3). Info Was Delayed Beyond Required Date Due to Internal Oversight ML17325B5841999-05-10010 May 1999 Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed ML17325B5871999-05-0707 May 1999 Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current Esrr Schedule Provided for Info Purposes,Reflecting Revised Target Dates ML17325B5821999-05-0404 May 1999 Provides Addl Background,Description & Clarification of Previous & Revised Commitments Re UFSAR Revalidation Effort. Commitment Change Involved Alignment of UFSAR Revalidation Program Methodology to Strategy Contained in Current Plan ML17325B5791999-05-0404 May 1999 Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed ML17325B5741999-05-0303 May 1999 Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal ML17325B5631999-04-22022 April 1999 Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227 ML17325B5561999-04-16016 April 1999 Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed ML17325B5451999-04-12012 April 1999 Forwards LER 99-009-00 Re as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit.Commitments Identified in Submittal Listed ML17325B5301999-04-0707 April 1999 Forwards LER 99-S01-01, Vulnerability in Locking Mechanism of Four Vital Area Gates, Per 10CFR50.73.Commitments Made by Util,Listed ML17325B5241999-04-0505 April 1999 Forwards Revs 0 & 1 to Cook Nuclear Plant Restart Plan, Dtd 980307 & 0407.Rev 5 Is Current Cook Nuclear Plant Restart & Supercedes Previous Revs in All Respects ML17325B5121999-04-0101 April 1999 Forwards LER 99-007-00, Calculations Show That Divider Barrier Between Upper & Lower Containment Vols May Be Overstressed. Commitments Made by Util Are Listed ML17325B5141999-03-30030 March 1999 Forwards Rept on Status of Decommissioning Funding.Attached Rept Includes Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML17325B5191999-03-29029 March 1999 Forwards LER 99-001-00,re Degraded Component Cw Flow to Containment Main Steam Line Penetrations.Commitment, Listed ML20204F6401999-03-19019 March 1999 Responds to NRC 981013 NOV & Proposed Imposition of Civil Penalty.Violations Cited in Subject NOV Were Initially Identified in Referenced Five Insp Repts.Corrective Actions: Ice Condensers Have Been Completely Thawed of Any Blockage ML17325B4751999-03-18018 March 1999 Forwards LER 99-004-00,re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitment Made by Util,Listed ML17325B4721999-03-18018 March 1999 Forwards LER 99-005-00,re Reactor Trip Breaker Manual Actuations During Rod Drop Testing Not Previously Reported. Listed Commitments Identified in Submittal ML17325B4641999-03-17017 March 1999 Withdraws Response to Issue 1 of NRC Cal,Dtd 970919. Comprehensive Design Review Effort in Progress to Validate Resolution of Issue for Future Operation 1999-09-30
[Table view] Category:STATE/LOCAL GOVERNMENT TO NRC
MONTHYEARML20064G0391982-10-29029 October 1982 Informs That Area Directional Sirens Cannot Be Heard at Beach Area of Warren Dunes State Park.Recommendations for Improving Emergency Notification Sys Discussed ML17317B5201979-08-27027 August 1979 Requests Info for Technical Review of Public Health Matters Re Proposed Spent Fuel Storage Capacity Expansion,Including Data Ref by Util ML17317B2431979-05-18018 May 1979 Comments on Meeting to Be Held to Provide Mi Citizens W/Better Understanding of Proposed Spent Fuel Storage Expansion ML17317B2161979-05-14014 May 1979 Describes Correspondence W/Nrc Re Application for Expansion of Spent Fuel Storage Capacity to 2,050 Fuel Assemblies. Requests Addl Info Re Technical Review of Related Public Health & Safety Matters 1982-10-29
[Table view] |
Text
e e REGULATORY INFORMATION DISTRIBUTION SYSTEM{RIDS)DISTRIBUTION, CODE: C002S COPIES RECEIVED:LTR g ENCL+SIZE~TITLE: 'NVIRON~COMMENTS~NOT S o wwaawwww<<weemww wwwwaawwaoaaya~gaowwwwwaawwwaaaaoa<<waawwwweoaaaaeowoaaaweewmwwaaoawaow<<waaaaaaaoaa RECIPIENT COPIES ID CODE/NAME'TTR ENCL RECIPIENT ID CODE/NAME i 7 BC OOSPORE++COPIES" LTTR ENCL 1 05 PM 18 LAOMRN ACTION!ACCESSION NBR:7905230504 DOC~DATE: 79/05/14 NOTARIZED'O DOCKET FAC IL?50 5 DONALD C~COOK NUCLFAR'POWER PLANTg UNIT 1 i INDIANA 8 05000315 0<<31 DONALD C, COOK NUCLEAR POWER PLANTi UNIT 2i INDIANA 8 05000316 AUTH, AUTHOR AFFILIATION REIZENgM~S~MICHIGAN'TATE OF REC IP~NAME RECIPIENT AFFILIATION DENTONgH~RE OFFICE OF NUCLEAR REACTOR REGULATION
SUBJECT:
LISTS CORRESPONDENCE RE APPLICATION FOR EXPANSION OF SPENT FUEL STORAGE CAPACITY TO 2g050 FUEL ASSEMBLIES'EQUESTS ADDL-INFO.FOR TECHNICAL-REVIEW OF RELATED PUBLIC HEALTH L SAFETY MATTERS'NTERNAL:
01 07 10 12 15 19 AD Fl CST BNFT ANL'D SITE TECH EFLT TRT SYS DIR DSE SITE ANALY 1 2 1 2 1 1 1 1 0 02 NRC PDR 09 ENVN SPEC BR 11 TA/EDO 14 ACDENT ANALY 16 RAD ASMT BR AD ENVIRON TECH OELD EXTERNAL: 03 LPDR 20 NATL LAB glVL.1 1 5 5 OLI N SIC ACRS LA-gigEAI Hii 7 or(8~i~I@Zle'7 d I/oR8~r l~gg gS1$79 q".(TOTAL NUMBER OF COP IES REQUIRED: LTTR 28 ENCL WILLIAM G.MILL!KEN, Governor MAURICE 5.REIZEN, M.D.,'Director STATE OF MICHIGAN DEPARTMENT OF PUBLIC HEALTH'500 N.LOGAN,P.O.'OX 30035, LANSING, MICHIGAN 48909 May 14, 1979, Mr.Harold C.Denton, Di r ector Office of Nuclear Reactor Regul ati on U.S.Nuclear Regulatory Commission Washington, D.C.20555
Dear Mr.Denton:
I have noted that Indiana and Michigan Power Company has made appl ica-tion for an expansion of the Spent Fuel storage capacity from 500 to 2050 fuel assembl i es at the Donald C.Cook Plant Unit Numbers 1 and 2 (Docket Nos.50-31 5 and 50-31 6).The fol 1 owing correspondence i s in my possession:
an Indiana and Michigan letter to you of November 22, 1978 with attachment 1,"Description and Safety Analysis for the Spent Fuel Storage Capacity Expansion Program", and an Indiana 8 Michigan letter to you of January 24, 1979 with additional information.
This correspondence contains inadequate information for a comprehensive engineering public health and safety evaluation by my staff.I would appreciate receiving information sufficient for a technical review of related public health matters including any pertinent Salem Nuclear Generating Station, N.J.data referenced by Indiana and Michigan Company.Thank you for your attention to this request.Sincerely, auric S.eizen, M.D.Director REIVUf ATo,,y DgyE R M I C H I GAWAIN THC GATAT LAAC STAVE 7905230 QOQ"Equal Health Opportunilrj for All" goer P g,S]/~
, Docket No.50-315 5O-316 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C.20555 Nay 10'979 ISTRIBUTIOH oc et;es aII ORB1 R CSParrish SEE ATTACHED LIST subject: lNK~AHA AHD MICHIGAN POi'JER COMPANY (0 C COOK 1 SI 2)The following documents concerning our review of the subject facility are transmitted for your information:
Notice of Receipt of Application.
Draft/Final Environmental Statement, dated Safety Evaluation, or Supplement No., dated Notice of Hearing on Application, for Construction Permit.Notice of Consideration of Issuance of Facility Operating License.Application and Safety'Analysis Report, Vol.Amendment No.to Application/SAR, dated Construction Permit No.CPPR-Facility Operating License No.DPR-, dated , NPF-, dated Amendment No.to CPPR-or DRR-, dated Other:
Enclosures:
As stated', t'ivision of Operating Reactors Office of Nuclea'r Reactor Regulation CC: OFFICE SURNAME In 0 A1E NBC 21 16 76)m.3)OR:ORB3
'gj CSParrish jb I" A)5/10/79 r I'J P ('(" F-V h h'uT,i , 1 C i l C<4=C A iP r UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C.20555 March 27, 1979 Docket No.50-316 SEE THOSE OH ATTACHED LIST UTIOH: Docket OR DG CParrish DOMLD C.COOK NUCLEAR POWER PUWT, 1ocated in Berrien County, Michigan.The following documents concerning our review of the subject facility are transmitted for your information:
Noticb of Receipt of Application.
Draft/Final
'Ertvironmental Statement, dated J Salety Evaluation.
or Supplement No., dated Q Notice of Hearing on Application for Construction Permit.Notice of Consideration of Issuance of Facility Operating License.Application and Safety Analysis Report.Vol.Amendment No.to Application/SAR, dated Construction Permit No.CPPR-Facility Operating License No.DPR-, dated a NPF-, dated C I Amendment No.-to CppR-or DRR.-, dated other Honth1y Operating Repor t for Februar 1 979.
Enclosures:
As stated cc: See next page ms(Office of, Nuclear Reactor Regulation Division of Operating Reactors Operating Reactors Branch¹1 OFFICE In SURNAME>0AIE NRC 21 I6 76)DOR:0 B¹1 CP r h:jb 3'/79
~q 0 kP 1 r A P R 4>P))4\3 1 1')*~y't Chief Division of Ecological Services Bureau of Sport Fisheries 5 wildlife US.Departm nt of the Interior Washington, DC 20240 Director National Oceanographic Data Certer Env'ironmental Data Servi ce National Oceanic 5 Atmospheric Administration US D partment of Commerce'ashington, DC 20235 Dr.James T.Tanner National Bureau of Standards Reactor Building 235.'Washington, DC 20234 Director, Technical Office of Radiation U.S.Environmental Crystal Mall-;2..Arlington, Virginia Assessment Division Programs (AW-459)Protection Agency 20460 Dr.Philip F.Gustafson Argonne"National Laboratory 9700 South Cass Avenue Argonne, Illinois'0439 U.S.E.P.A.Region II Office ATTN: E IS COORDINATOR 26 Federal Pl aza New York, New York 10007 I~'g'a" f'I Docket No.50-315.50-316 DISTR'ION Doc e il 50-316'NITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C.20555 ORBl Rdg Harch 9, 1979 SEE ATTACHED LIST
Subject:
INDIANA AND MICHIGAN ELECTRIC COHPANY INDIANA ND HICHIGAN POtlER COI~tPAHY (Donald C.Cook, Units 1 and 2)The following documents concerning our review of the subject facility are transmitted for your information:
Notice of Receipt of Application.
Draft/Final Environmental Statement, dated Safely Evaluation.
or Supplement No..dated.Notice of Hearing on Application for Construction Permit.Notice of Consideration of Issuance of Facility Operating License.Application and Safety Analysis Report, Vol.Amendment No.to Application/SAR, dated Construction Permit No.CPPR-Facility Operating License No.DPR-dated , NPF-, dated Cl Amendment No.-to CPPR-or DRR-.dated Cl Other: Office of Nuclear Reactor Regulation Enclosures;
- As stated cc: OFFICE SURNAME Im OATE NRC 2I I6 76)R-:ORBX-SParrishtjb vu ynn yen t P Chief Division of Ecological Services Bureau of Sport Fisheries E Wildlife US Department of the Interior Washington, DC 20240 Director National Oceanographic Data Center Environmental Data Service National Oceanic 5 Atmospheric Administration US Department of Commerce Washington, DC 20235 Dr.James T.Tanner National Bureau of Standards Reactor Building 235 Washington, DC 20234 Director, Technical Assessment Division Office of Radiation Programs (AM-459)U.S.Environmental Protection Agency Crystal.Mall b2 Arlington, Virginia 20460'r.Philip F.Gustafson Argonne National Laboratory 9700 South Cass Avenue Argonne, Illinois 60439 U.S.E.P.A.Region II'ffice ATTN: E IS COORDI'NATOR 26 Federal Plaza New York, New York 10007