ML17334B016

From kanterella
Revision as of 07:32, 6 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Proposed Tech Spec 3.3.3.9,revising Table 3.3-12 to Reflect Replacement of Liquid Radwaste Effluent Line Monitor
ML17334B016
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 12/08/1986
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17334B015 List:
References
NUDOCS 8612120328
Download: ML17334B016 (3)


Text

\e~t TABLE 3.3-12 RADIOACTIVE LI UID EFFLUENT MONITORING INSTRUMENTATION Instrument Minimum Channel's~0 etable A licabilit Action 1.Gross Radioactivity Monitors Providing Automatic Release Termination a.Liquid Radwaste Effluent Line (12-RRS-1001)

(1)At times of release 23 b.Steam Generator Blowdown Line (1-R-19)At times of release 24 c.Steam Generator Blowdown Treatment Effluent (1-R-24)At times of release 24 2.Gross Radioactivity Monitors Not Providing Automatic Release Termination a.Service Water System Effluent Line (1-R-20, 1-R-28)(1)per At all times train 25 3.Continuous Composite Sampler Flow Monitor a.Turbine Building Sump Effluent Line At all times 25 4.Flow Rate Measurement Devices a.Liquid Radwaste Line(RFI-285) b.Discharge Pipes*c.Steam Generator Blowdown Treatment Effluent'(1-DFI-352)

At times of release 26 At all times NA At times of release 26*Pump curves and valve settings may be utilized to estimate flow;in such cases, Action Statement 26 is not applicable.

+Monitor 1-R-18 may be used until monitor 12-RRS-1001 is declared OPERABLE following initial installation.

e D.C.COOK-UNIT 1 8612120328 8b1208~!PDR ADOCK 0500031'5 P PDP 3/4 3-58 Amendment No.

TABLE 3.3-12 RADIOACTIVE LI UID EFFLUENT MONITORING INSTRUMENTATION Instrument Minimum Channels~0 arable A licabilit Action 1.Gross Radioactivity Monitors Providing Automatic Release Termination a.Liquid Radwaste Effluent Line (12-RRS-1001)

+At times of release 23 b.Steam Generator Blowdown Line (2-R-19)At times of release 24 c.Steam Generator Blowdown Treatment Effluent (2-R-24)At times of release 24 2.Gross Radioactivity Monitors Not Providing Automatic Release Termination a.Service Water System Effluent Line (2-R-20, 2-R-28)(1)per At all times train 25 3.Continuous Composite Sampler Flow Monitor a.Turbine Building Sump Effluent Line At all times 4.Flow Rate Measurement Devices a.Liquid Radwaste,Line(RFI-285) b.Discharge Pipes*c.Steam Generator Blowdown Treatment Effluent (2-DFI-352)

At times of release 26 At all times NA At times of release 26*Pump curves and valve settings may be utilized to estimate flow;in such cases, Action Statement 26 is not applicable.

+Monitor 2-R-18 may be used until monitor 12-RRS-1001 is declared OPERABLE following initial installation.

D.C.COOK-UNIT 2 3/4 3-54 Amendment No.

1 4I 1 1