ML17334B016

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec 3.3.3.9,revising Table 3.3-12 to Reflect Replacement of Liquid Radwaste Effluent Line Monitor
ML17334B016
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 12/08/1986
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17334B015 List:
References
NUDOCS 8612120328
Download: ML17334B016 (3)


Text

\ e

~ t TABLE 3.3-12 RADIOACTIVE LI UID EFFLUENT MONITORING INSTRUMENTATION Minimum Channel's Instrument ~0 etable A licabilit Action

1. Gross Radioactivity Monitors Providing Automatic Release Termination
a. Liquid Radwaste Effluent Line (12-RRS-1001) (1) At times of release 23
b. Steam Generator Blowdown Line (1-R-19) At times of release 24
c. Steam Generator Blowdown Treatment Effluent (1-R-24) At times of release 24
2. Gross Radioactivity Monitors Not Providing Automatic Release Termination
a. Service Water System Effluent Line (1)per At all times 25 (1-R-20, 1-R-28) train
3. Continuous Composite Sampler Flow Monitor
a. Turbine Building Sump Effluent Line At all times 25
4. Flow Rate Measurement Devices
a. Liquid Radwaste Line(RFI-285) At times of release 26
b. Discharge Pipes* At all times NA
c. Steam Generator Blowdown Treatment Effluent At times of release 26

'(1-DFI-352)

  • Pump curves and valve settings may be utilized to estimate flow; in such cases, Action Statement 26 is not applicable.

+ Monitor 1-R-18 may be used until monitor 12-RRS-1001 is declared OPERABLE following initial installation. e D. C. COOK - UNIT 1 3/4 3-58 Amendment No.

8612120328 8b1208~!

PDR ADOCK 0500031'5 P PDP

TABLE 3.3-12 RADIOACTIVE LI UID EFFLUENT MONITORING INSTRUMENTATION Minimum Channels Instrument ~0 arable A licabilit Action

1. Gross Radioactivity Monitors Providing Automatic Release Termination
a. Liquid Radwaste +

Effluent Line (12-RRS-1001) At times of release 23

b. Steam Generator Blowdown Line (2-R-19) At times of release 24
c. Steam Generator Blowdown Treatment Effluent (2-R-24) At times of release 24
2. Gross Radioactivity Monitors Not Providing Automatic Release Termination
a. Service Water System Effluent Line (1)per At all times 25 (2-R-20, 2-R-28) train
3. Continuous Composite Sampler Flow Monitor
a. Turbine Building Sump Effluent Line At all times
4. Flow Rate Measurement Devices
a. Liquid Radwaste,Line(RFI-285) At times of release 26
b. Discharge Pipes* At all times NA
c. Steam Generator Blowdown Treatment Effluent At times of release 26 (2-DFI-352)
  • Pump curves and valve settings may be utilized to estimate flow; in such cases, Action Statement 26 is not applicable.

+ Monitor 2-R-18 may be used until monitor 12-RRS-1001 is declared OPERABLE following initial installation.

D. C. COOK - UNIT 2 3/4 3-54 Amendment No.

1 4I 1

1