ML17334B016
| ML17334B016 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 12/08/1986 |
| From: | INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | |
| Shared Package | |
| ML17334B015 | List: |
| References | |
| NUDOCS 8612120328 | |
| Download: ML17334B016 (3) | |
Text
\\
e
~
t TABLE 3.3-12 RADIOACTIVE LI UID EFFLUENT MONITORING INSTRUMENTATION Instrument Minimum Channel's
~0 etable A licabilit Action 1.
Gross Radioactivity Monitors Providing Automatic Release Termination
- a. Liquid Radwaste Effluent Line (12-RRS-1001)
(1)
At times of release 23 b.
Steam Generator Blowdown Line (1-R-19)
At times of release 24 c.
Steam Generator Blowdown Treatment Effluent (1-R-24)
At times of release 24
- 2. Gross Radioactivity Monitors Not Providing Automatic Release Termination
- a. Service Water System Effluent Line (1-R-20, 1-R-28)
(1)per At all times train 25
- 3. Continuous Composite Sampler Flow Monitor
- a. Turbine Building Sump Effluent Line At all times 25 4.
Flow Rate Measurement Devices
- a. Liquid Radwaste Line(RFI-285)
- b. Discharge Pipes*
c.
Steam Generator Blowdown Treatment Effluent
'(1-DFI-352)
At times of release 26 At all times NA At times of release 26
- Pump curves and valve settings may be utilized to estimate flow; in such
- cases, Action Statement 26 is not applicable.
+ Monitor 1-R-18 may be used until monitor 12-RRS-1001 is declared OPERABLE following initial installation.
e D.
C.
COOK - UNIT 1 8612120328 8b1208~!
PDR ADOCK 0500031'5 P
PDP 3/4 3-58 Amendment No.
TABLE 3.3-12 RADIOACTIVE LI UID EFFLUENT MONITORING INSTRUMENTATION Instrument Minimum Channels
~0 arable A licabilit Action
- 1. Gross Radioactivity Monitors Providing Automatic Release Termination
- a. Liquid Radwaste Effluent Line (12-RRS-1001) +
At times of release 23 b.
Steam Generator Blowdown Line (2-R-19)
At times of release 24 c.
Steam Generator Blowdown Treatment Effluent (2-R-24)
At times of release 24
- 2. Gross Radioactivity Monitors Not Providing Automatic Release Termination
- a. Service Water System Effluent Line (2-R-20, 2-R-28)
(1)per At all times train 25
- 3. Continuous Composite Sampler Flow Monitor
- a. Turbine Building Sump Effluent Line At all times
- 4. Flow Rate Measurement Devices
- a. Liquid Radwaste,Line(RFI-285)
- b. Discharge Pipes*
c.
Steam Generator Blowdown Treatment Effluent (2-DFI-352)
At times of release 26 At all times NA At times of release 26
- Pump curves and valve settings may be utilized to estimate flow; in such
- cases, Action Statement 26 is not applicable.
+ Monitor 2-R-18 may be used until monitor 12-RRS-1001 is declared OPERABLE following initial installation.
D.
C.
COOK - UNIT 2 3/4 3-54 Amendment No.
1 4I 1
1