Proposed Tech Specs Pages,Correcting TS Pages Inadvertently Submitted in 990923 Submittal
ML17335A561
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/11/1999
From:
INDIANA MICHIGAN POWER CO.
To:
Shared Package
ML17335A560 List:
References
NUDOCS 9910200237
Download: ML17335A561 (5)


Text

ATTACHMENT TO C1099-11 PROPOSED T/S PAGES UNIT 1 Page 3/4 9-8 UNIT 2 Page 3/4 9-7 99i0200237 99iOii PDR ADQCK 050003i5 P PDR g 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS.

3/4.9 REFUELING OPERATIONS

.~CRANE TRAVEL-SPENT FUEL STORAGE POOL BUILDING'IMITING CONDITION FOR OPERATION 3.9.7 Loads in excess of 2,500 pounds shall be prohibited from travel over fuel assemblies in the storage pool.Loads carried over the spent fuel pool and the heights at which they may be carried over racks containing fuel shall be limited in such a way as to preclude impact energies over 24,240 in.-lbs., if the loads are dropped from the crane.APPLICABILITY:

With fuel assemblies in the storage pool.ACTION: With the requirements of the above specification not satisfied, place the crane load in a safe condition.

The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE RE UIREMENTS 4.'9.7.1 Crane interlocks which prevent crane travel with loads in excess of 2,500 pounds over fuel assemblies shall be demonstrated OPERABLE within 7 days prior to crane use and at least once per 7 days thereafter during crane operation.

This Surveillance Requirement is not required during the movement of steam generator sections in the auxiliary building for the Unit 1 steam generator replacement project.When crane travel interlocks are disengaged, administrative controls shall be in place to prevent loads from passing over the spent fuel pool.4.9.7.2 The potential impact energy due to dropping the crane's load shall.be determined to be S 24,240 in.-lbs.prior to moving each load over racks containing fuel.Shared system with Cook Nuclear Plant-Unit 2 COOK NUCLEAR PLANT-UNIT 1 Page 3/4 9-8 AMENDMENT 4M, 448, 486

~iS (V 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.9 REFUELING OPERATIONS CRANE TRAVEL-SPENT FUEL STORAGE POOL BUILDING*LIMITING CONDITION FOR OPERATION 3.9.7 Loads in excess of 2,500 pounds shall be prohibited from travel over fuel assemblies in the storage pool.Loads carried over the spent fuel pool and the heights at which they may be carried over racks containing fuel shall be limited in such a way as to preclude impact energies over 24,240 in.-lbs., if the loads are dropped from the crane.APPLICABILITY:

With fuel assemblies in the storage pool.ACTION: With the requirements of the above specification not satisfied, place the crane load in a safe condition.

The'rovisions of Specification 3.0.3 are not applicable.

SURVEILLANCE RE UIREMENTS 4.9.7.1 Crane interlocks which prevent crane travel with loads in excess of 2,500 pounds over fuel assemblics shall.be demonstrated OPERABLE within 7 days prior to crane use and at least once per 7 days thereafter during crane operation.

This Surveillance Requirement is not required during the movement of steam generator sections in the auxiliary building for the Unit 1 steam generator replacement project.When crane travel interlocks are disengaged, administrative controls shall be in place to prevent loads from passing over the spent fuel pool.4.9.7.2 The potential impact energy due to dropping the crane's load shall be determined to be 5 24,240 in.-lbs.prior to moving each load over racks containing fuel.Shared system with Cook Nuclear Plant-Unit 1.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 9-7 AMENDMENT 8V, 96,+VS o M~~~.~'