ML17292A888

From kanterella
Revision as of 19:27, 5 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Withdraws Request for Amend of Slmcpr.Requested Changes to 970520 Ltr Included & TS Page 2.0-1,modified to Indicate That SLMCPR for ATRIUM-9X Fuel Applies Only to Cycle 13, Forwarded W/Corresponding Bases Page
ML17292A888
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/06/1997
From: BEMIS P R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17292A889 List:
References
GO2-97-115, NUDOCS 9706170043
Download: ML17292A888 (6)


Text

CATEGORY1REGULATOIINFORMATtON DISTRIBUTION jTEM(RODS)ACCESSION NBR:9706170043 DOC.DATS; 97/06/06NOTARIZED:

YESDOCKETFAC'IL:50-397 WPPSSNuclearProject,Unit2,Washington PublicPowe05000397AUT~sk.NAMEAUTHORAFFILIATION BEMIS,P.R.

Washington PublicBowerSuppl,ySystemRECIP.NAME RECIPIENT AFFILIA'9(ON DocumentControlBranch(Document ControlDesk)

SUBJECT:

Withdraws requestforamendofSLMCPR.Requested changesto970520ltrincluded&TSpaqe2.0-l,modified toindicatetharSLMCPRforATRIUM-9X fidelappliesonlytoCycle13,'orwarded w/corresponding Bqsespage.DISTRIBUTION CODE'001D COPIESRECEIVED;LTR

,ENCLSIZE'ITLE:

ORSubmittal:

GeneralDistribution NOTES:RECIPIENT IDCODE/NAME PD4-2LACOLBURNFT COPIESLTTRENCL1111RECIPIENT IDCODE/NAME PD4-2PDCOPIESLTTRENCL11INTERNAL:

ACRSNRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3EXTERNAL:

NOAC111111111011FILECENTERRPDE+l.bRB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRCPDR'1111111111DUNNOTETOALL"RIDS"RECIPZENTS:

PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK{DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:

LTTR14ENCL13

'Ctg'g WASHINGTON PUBLICPOWERSUPPLYSYSTEMP.O.Box968~Richland,,

Washington 99352-0968 June6,1997G02-97-115 DocketNo.50-397U.S.NuclearRegulatory Commission DocumentControlDeskWashington, D.C.20555Gentlemen:

Subject:

WNP-2OPERATING LICENSENPF-21EXIGENTREQUESTFORAMENDMENT OFSLMCPR-MODIFICATION OFREQUEST

Reference:

LetterGO2-97-102 datedMay20,1997,P.R.Bemis(SupplySystem)toNRCDocumentControlDesk,WNP-2Operating LicenseNPF-21ExigentRequestforAmendment:

MinimumCriticalPowerRatioSafetyLimitsThereferenced letterrequestsanexigentchangetotheWNP-2Technical Specifications (Section2.1.1.2)toestablish aninterimsafetylimit(SLMCPR)forSiemensPowerCorporation (SPC)ATRIUM-9X fuel.Inconjunction withtherequested change,areference describing themethodusedtoestablish theinterimsafetylimitwasproposedforinclusion intheCOLRreference list.Subsequent reviewbyNRCstaffhasdetermined thattheinclusion ofthisreference isnotnecessary forTechnical Specifications Section5.6.5.Accordingly, theSupplySystemherebywithdraws itsrequesttoinsertthenewreference inSection5.6.5.sNRCstaffreviewofthereferenced letteralsoidentified thatadditional information isnecessary toclarifytheuseofSPCSLMCPRfromCycle11insubsequent cycles.Therequested changestoAttachment iofthereferenced letterareincludedasAttachment itothisletter.Inaddition, Technical Specification page2.0-1hasbeenmodifiedtoindicatethattheSLMCPRforATRIUM-9X fuelappliesonlytoCycle13.Thisclarifies theintentoftheoriginalchangemadeinthereferenced letter.Attachment 2providestherevisedTechnical Specification page2.0-1andthecorresponding Basespage.'P70bl70043 970bObPDRADOCK05000397PPDR't60944IIIIIIIlllllllillIIIIlllillllIIl'Illllll e

EXIGENTREQUESTFRAMENDMENT OFSLMCPRMODIFICATION OFREQUESTPageosThechangesproposedbythisletterdonotalterthepreviousconclusion ofnosignificant hazardsthatwereevaluated inaccordance with10CFR50.92(c) anddocumented inthereferenced letter.Therevisedamendment requesthasalsobeenevaluated againstthecriteriaforidentification oflicensing andregulatory actionsrequiring environmental assessment inaccordance with10CFR51.21.

Themodifiedrequestcontinues tomeettheeligibility criteriaforacategorical exclusion assetforthin10CFR51.22(c)(9).

Therefore, inaccordance with10CFR51.22(b),

anenvironmental assessment ofthechangeisnotrequired.

Thisrequestformodification ofthependingexigentTechnical Specifications amendment requesthasbeenreviewedandapprovedbytheWNP-2PlantOperations Committee andtheSupplySystemCorporate NuclearSafetyReviewBoard.Inaccordance with10CFR50.91, theStateofWashington hasbeenprovidedacopyofthisletter.Shouldyouhaveanyquestions ordesireadditional information regarding thematter,pleasecontactMr.P.J.Inserraat(509)377-4147.

Respectfully, P.R.BemisVicePresident NuclearOperations MailDropPE23Attachments CC:EWMerschoff

-NRCRIVKEPerkins,Jr.-NRCRIV,WalnutCreekFieldOfficeTGColburn-NRRNRCSr.ResidentInspector

-927NDLWilliams-BPA/399CRWallis-EFSECPDRobinson-Winston&Strawn

,STATEOFWASHINGTON)

)COUNTYOFBENTON)

Subject:

RequestforMcxBfication ofAmendment toTSMCPRafeLimiI,G.O.SMITH,beingdulysworn,subscribe toandsaythatIamtheActingVicePresident, NuclearOperations fortheWASHINGTON PUBLICPOWERSUPPLYSYSTEM,theapplicant herein;thatIhavethefullauthority toexecutethisoath;thatIhavereviewedtheforegoing; andthattothebestofmyknowledge, information, andbeliefthestatements madeinitaretrue.DATE,1997G.O.SnuthActingVicePresident, NuclearOperations Onthisdatepersonally appearedbeforemeG.O.Smith,tomeknowntobetheindividual whoexecutedtheforegoing instrument, andacknowledged thathesignedthesameashisfreeactanddeedfortheusesandpurposeshereinmentioned.

GIVENundermyhandandsealthis~dayof1997NotaryPublicmandfortheSTATEOFWASHINGTON byrResidingatMyCommission Expires EXIGENTREQUESTFORAMENDMENT OFSLMCPRMODIFICATION OFREQUESTAttachment 1'agelof1ATTACHMi22IT 1Submittal ofAdditional Information Page1ofAttachment 1ofthedocumentreferenced belowisrevisedbyinserting thefollowing textasnewparagraph 2:Cycle13willbecomprised of112freshABBassemblies, 104once-burned ABBassemblies, and548oftheatleasttwiceburnedATRIUM-9X assemblies.

TheNRCapprovedABBmethodology (i.e.,COLRReference 11:CENPD-300-P-A) assumesthatthesafetylimitMCPR(SLMCPR)forthenon-ABBresidentfuelisunchanged fromthelastcycleforwhichitwasevaluated byitssupplier.

TheA'INDIUM-9X fuelwaslastevaluated bySPCinCyclell.Accordingly, anewATRIUM-9X SLMCPRforCycle11hasbeendetermined bySPC(Reference 3)usingthechangestotheadditiveconstantuncertainty discussed below.TheSPCdetermined SLMCPRwillbeappliedbyABBtoCycle13andfuturecyclesthatusetheATRIUM-9X fuel.

Reference:

LetterGO2-97-102 datedMay20,1997,P.R.Bemis(SupplySystem)toNRCDocumentControlDesk,WNP-2Operating LicenseNPF-21ExigentRequestforAmendment:

MinimumCriticalPowerRatioSafetyLimits.