ML17292B262

From kanterella
Revision as of 18:47, 5 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Copy of Performance Self-Assessment,WNP-2, Documenting Results of Assessment,Which Was Conducted 971006-31,of Key Functional Areas
ML17292B262
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/04/1998
From: WEBRING R L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17292B263 List:
References
GO2-98-045, GO2-98-45, NUDOCS 9803100236
Download: ML17292B262 (6)


Text

CATEGORYj.REGULA1RYINFORMATION DISTRIBUTIO SYSTEM(RIDS)~>ACCESSION NBR:9803100236 DOC.DATE:

98/03/04NOTARIZED:

NODOCKET¹~~~~FACIL:50-397 WPPSSNuclearProject,Unit2,Washington PublicPowe05000397AUTH.NAME,AUTHORAFFILIATION BRING,R.L.

Washington PublicPowerSupplySystem,RECIP.NAME RECIPIENT AFFILIATION DocumentControlBranch(Document ControlDesk)

SUBJECT:

Forwardscopyof"Performance Self-Assessment,WNP-2,"

documenting resultsofassessment, whichwasconducted 971006-31,of keyfunctional areas.DISTRIBUTION CODE:A001DCOPXESRECEIVED:LTR ENCLSIZE:TITLE:ORSubmittal:

GeneralDistribution Cy/OjANOTES:RECIPIENT IDCODE/NAME PD4-2LAPOSLUSNY,C COPIESLTTRENCL1111RECIPIENT IDCODE/NAME PD4-2PDCOPIESLTTRENCL11EINTERNAL:

ACRSNRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS311111111101NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT 11111111ERNAL:NOAC11NRCPDR11DNOTETOALL"RIDS"RECIPIENTS:

PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:

LTTR14ENCL13 IhIIf 0WASHINGTON PUBLICPOWERSUPPLYSYSTEMP.O.Box968~Richland, Washington 99352-0968 March4,1998G02-98-045 DocketNo.50-397U.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, DC20555Gentlemen:

Subject:

WNP-2,OPERATING LICENSENPF-21PERFORMANCE SELFASSESSMENT REPORTThepurposeofthisletteristotransmitacopyoftheSupplySystem'sPerformance SelfAssessment Report.Theattachedreportdocuments theresultsofanassessment, whichwasconducted October6,1997throughOctober31,1997,ofkeyfunctional areasatWNP-2.Theassessment teamwascomprised ofseveralnuclearutilitypersonnel, supported bySupplySystememployees knowledgeable intheareasevaluated.

Thegoaloftheassessment wastoobtainanindependent andcriticalfunctional evaluation ofWNP-2performance usingindustryandNRCstandards andmethodologies.

Theassessment focusedonfunctional areasratherthandepartmental organizations.

Asaresult,performance issuesidentified areassociated withplant-wide functions, andnotwithspecificworkgroups.Fromanoverallperspective, itwasconcluded fromtheassessment thatWNP-2performance duringthelastyearcanbecharacterized asimproving, butataslowerratethanexpected, withacontinuing needformanagement attention incertainkeyareas.Actionshavebeendeveloped forresolving issuesidentified duringtheassessment.

ASlWeconsidertheselfassessment processtobeanintegralpartofourcontinued effortstotI"improveperformance andwouldwelcomeanopportunity todiscusstheresultsandplannedactionspertaining totheattachedassessment report.9803i00236 980304PDRADOCK050003'P7 l'DR,lllllillllllllilllllllflllllllllllllllllj 0I$1s~h'tgt~r~

WNP-2PERFORMANCE SELFASSESSMENT REPORTPage2Ifyouhaveanyquestions orrcquneadditional information pertaining tothisletter,pleasecontactmeorP.J.Inserraat(509)377-4147.

Respectfully, R.L.WebringVicePresident, Operations Support/PIO MailDropPE08Attachment CC:EWMerschoff

-NRCRIVWHBateman-NRCNRRJEDyer-NRCRIVTPGwynn-NRCRIVATHowellIII-NRCRIVGWJohnston-NRCRIV,WCFOKEPerkins,Jr.-NRCRIV,WCFOCPoslusny, Jr-NRCNRRHJWong-NRCRIV,WCFONRCSeniorResidentInspector

-927NDLWilliams-BPA/399PDRobinson-Winston&Strawn II