Letter Sequence Request |
---|
|
|
MONTHYEAR3F0314-01, Response to Request for Additional Information to Exemptions on Radiological Emergency Response Plan Requirements Defined by 10 CFR 50.47 and Appendix E to Part 50, Revision 12014-03-28028 March 2014 Response to Request for Additional Information to Exemptions on Radiological Emergency Response Plan Requirements Defined by 10 CFR 50.47 and Appendix E to Part 50, Revision 1 Project stage: Response to RAI 3F0814-07, Exemptions to Radiological Emergency Response Plan Requirements Defined by 10 CFR 50.47 and Appendix E to Part 50, Supplement2014-08-28028 August 2014 Exemptions to Radiological Emergency Response Plan Requirements Defined by 10 CFR 50.47 and Appendix E to Part 50, Supplement Project stage: Supplement ML15013A1812015-02-23023 February 2015 Letter with Environmental Assessment and Finding of No Significant Impact Related to Request for Exemptions from Certain Emergency Planning Requirements Project stage: Other ML15013A1732015-02-23023 February 2015 Environmental Assessment and Finding of No Significant Impact Exemptions from Certain Emergency Planning Requirements Project stage: Other ML15058A9062015-03-30030 March 2015 Letter, Exemptions from Certain Emergency Planning Requirements and Related Safety Evaluation Project stage: Approval ML15040A0902015-03-30030 March 2015 Nuclear Generating Plant - FRN for Exemptions on Emergency Plan and Emergency Action Level Scheme. Project stage: Other NRC-2015-0042, Nuclear Generating Plant - FRN for Exemptions on Emergency Plan and Emergency Action Level Scheme.2015-03-30030 March 2015 Nuclear Generating Plant - FRN for Exemptions on Emergency Plan and Emergency Action Level Scheme. Project stage: Other 3F0315-04, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20142015-03-31031 March 2015 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2014 Project stage: Request ML15110A1292015-04-22022 April 2015 Correction to the Emergency Planning Exemptions Safety Evaluation Project stage: Approval 3F0815-01, License Amendment Request No. 318, Revision 0, Permanently Defueled Emergency Plan, Revision 2, and Permanently Defueled Emergency Action Level Bases Manual, Revision 1, for the Independent Spent Fuel Storage Installation2015-08-27027 August 2015 License Amendment Request No. 318, Revision 0, Permanently Defueled Emergency Plan, Revision 2, and Permanently Defueled Emergency Action Level Bases Manual, Revision 1, for the Independent Spent Fuel Storage Installation Project stage: Request 3F1115-01, Notification of Schedule Change for the Post-Shutdown Decommissioning Activities Report2015-11-16016 November 2015 Notification of Schedule Change for the Post-Shutdown Decommissioning Activities Report Project stage: Request 3F1215-01, Request for Exemption from 10 CFR 50.54(w)(1) Regarding Onsite Insurance Coverage2015-12-17017 December 2015 Request for Exemption from 10 CFR 50.54(w)(1) Regarding Onsite Insurance Coverage Project stage: Request 3F0516-02, License Amendment Request No. 322, Revision 0, Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, and ISFSI-Only Emergency Action Level Bases Manual, for the CR-3 Safstor Period with Spent Fuel on Site2016-05-25025 May 2016 License Amendment Request No. 322, Revision 0, Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, and ISFSI-Only Emergency Action Level Bases Manual, for the CR-3 Safstor Period with Spent Fuel on Site Project stage: Request 3F0716-02, Permanently Defueled Emergency Plan, Revision 3 and Implementing Procedure, Permanently Defueled Emergency Action Level Bases Manual, Revision 12016-07-19019 July 2016 Permanently Defueled Emergency Plan, Revision 3 and Implementing Procedure, Permanently Defueled Emergency Action Level Bases Manual, Revision 1 Project stage: Other 3F0720-03, ISFSI Only Emergency Plan and Implementing Procedure2020-07-21021 July 2020 ISFSI Only Emergency Plan and Implementing Procedure Project stage: Request 3F0321-01, License Amendment Request, Revision to Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, Draft a, and ISFSI Only Emergency Action Level Bases Manual2021-03-17017 March 2021 License Amendment Request, Revision to Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, Draft a, and ISFSI Only Emergency Action Level Bases Manual Project stage: Draft Request 2015-03-31
[Table View] |
|
---|
Category:Letter
MONTHYEARML23342A0942024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23354A0632023-12-22022 December 2023 Cover Letter - Crystal River License Termination Plan Request for Additional Information ML23345A1882023-12-0606 December 2023 Fws to NRC Crystal River Species List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML23320A2592023-11-17017 November 2023 STC-23 077 Notification of the Crystal River Unit 3 Generating Plant License Termination Plan Public Meeting and Federal Register Notice ML23313A1322023-11-15015 November 2023 Request for Additional Information for the Environmental Assessment of the License Termination Plan for Crystal River Unit 3 Nuclear Generating Plant ML23310A0712023-11-0707 November 2023 Audit Plan Cover Letter - Crystal River Unit 3 Nuclear Generating Plant LTP ML23187A1112023-07-25025 July 2023 Acceptance of Requested Licensing Action License Request to Add License Condition to Include License Termination Plan Requirements ML23107A2722023-06-13013 June 2023 Letter Transmitting NRC Survey Results for East Settling Pond ML23160A2962023-06-0909 June 2023 Response to Crystal River, Unit 3 Supplemental Information Needed for Acceptance on the Application for a License Amendment Regarding Approval of the License Termination Plan ML23107A2732023-06-0707 June 2023 Orise Independent Survey Report Dcn 5366-SR-01-0 IR 05000302/20220032023-05-25025 May 2023 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2022003 ML23103A1902023-04-19019 April 2023 Request for Supplemental Information Cover Letter ML23058A2532023-03-22022 March 2023 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River, Unit 3 - NRC Inspection Report No. 05000302/2022003 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22265A0192022-09-26026 September 2022 Nuclear Generating Plant - U.S. Nuclear Regulatory Commission'S Analysis of ADP CR3, Llc'S Decommissioning Funding Status Report (License No. DPR-72, Docket Nos. 50-302 and 72-1035) IR 05000302/20220022022-08-0909 August 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report 05000302/2022002 IR 05000302/20220012022-05-0303 May 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report 05000302/2022001 ML22116A1752022-04-27027 April 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3- Independent Spent Fuel Storage Installation Security Inspection Report 07201035/2022401 ML22105A3992022-04-18018 April 2022 Nuclear Generating Plant - Change in NRC Project Manager ML22011A1362022-01-31031 January 2022 Independent Spent Fuel Storage Installation Security Inspection Plan IR 05000302/20210042022-01-24024 January 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2021004 ML22024A2142022-01-24024 January 2022 Nuclear Generating Plant - NMFS NRC Letter - Crystal River Energy Complex Biological Opinion Status (License No. DPR-72, Docket Nos. 50-302 and 72-1035) ML21351A0052021-12-20020 December 2021 NRC Analysis of ADP CR3, LLC Decommissioning Funding Status Report for the Crystal River Unit 3 Nuclear Generating Plant (License No. DPR-72, Docket Nos. 50-302 and 72-1035) ML21322A2702021-11-24024 November 2021 Nuclear Generating Plant - Issuance of Amendment No. 260 Approving the Independent Spent Fuel Storage Installation Only Security Plan, Rev 3 IR 05000302/20210032021-11-0909 November 2021 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report Nos. 05000302/2021003 and 07201035/2021001 ML21288A4292021-10-18018 October 2021 Letter - Crystal River Unit 3 Nuclear Generating Plant - Correction to Safety Evaluation Related to the Issuance of Amendment No. 259 Approving the Independent Spent Fuel Storage Installation Only Emergency Plan ML21238A0952021-10-13013 October 2021 Issuance of Amendment No. 259 Approving the ISFSI-Only Emergency Plan, Revision Draft a IR 05000302/20210012021-08-12012 August 2021 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report Nos. 05000302/2021001 and 05000302/2021002 ML21182A1032021-07-0606 July 2021 Request for Additional Information (RAI) Related to the ISFSI-Only Emergency Plan ML21159A0422021-06-28028 June 2021 VY and CR Indirect License Transfer Package ML21060B4142021-04-12012 April 2021 U.S. Nuclear Regulatory Commission Analysis of Duke Energy Florida, Llc'S Initial Decommissioning Funding Plan for the Crystal River Independent Spent Fuel Storage Installation ML21028A5912021-03-0202 March 2021 Letter to Reid Forwarding Exemption from 10 CFR Part 20, Appendix G, Section Iii.E ML21055A7832021-02-25025 February 2021 Letter to Reid, Change in NRC Staff Project Management for Crystal River Unit 3 Nuclear Generating Plant ML21012A3142021-01-13013 January 2021 Independent Spent Fuel Storage Installation Security Inspection Plan IR 05000302/20200012020-11-19019 November 2020 NRC Inspection Report No. 05000302/2020001, Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3, Crystal River, Florida ML20269A2922020-10-0707 October 2020 NRC Form 311 QA Program Approval Revision 10 Related to Crystal River 3 ML20101G5822020-04-10010 April 2020 CR-3 License Transfer SE Corrected Cover Letter ML20069A0232020-04-0101 April 2020 Order Approving Transfer of Licensed Authority from Duke Energy Florida, LLC, to ADP CR3, LLC, and Draft Conforming Administrative License Amendment ML20050D0142020-02-19019 February 2020 NRC Independent Spent Fuel Storage Installation Inspection Report No. 07201035/2020001, Duke Energy Florida, LLC, Crystal River Unit 3, Crystal River, Florida ML20050F7702020-02-14014 February 2020 30-Day Notice of Payment from the City of Tallahassee Trust Fund Non-Qualified Nuclear Decommissioning Trust Fund for Crystal River Unit 3 ML20015A5672020-01-15015 January 2020 Independent Spent Fuel Storage Installation Security Inspection Plan ML20009D0432020-01-10010 January 2020 Letter to Hobbs, Crystal River Unit 3 Nuclear Generating Plant - Corrected Safety Evaluation for Approval of Partial Site Release for Facility Operating License No. DPR-72 ML19339G5092020-01-0202 January 2020 Letter to Hobbs, Crystal River Unit 3 Nuclear Generating Plant - Approval of Partial Site Release for Facility Operating License No. DPR-72 ML19343A8252019-12-0606 December 2019 Letter from Erika Bailey, Oak Ridge Institute for Science and Education, to John Hickman, NRC, Forwarding Independent Confirmatory Survey Summary and Results for the 3,854-Acre Area Partial Site Release at the Crystal River Energy Complex IR 05000302/20190022019-11-20020 November 2019 NRC Inspection Report No. 05000302/2019002 and Independent Spent Fuel Storage Installation Inspection Report No. 07201035/2019002, Duke Energy Florida, LLC, Crystal River Unit 3, Crystal River, Florida ML19317D0932019-10-25025 October 2019 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing ML19261A0702019-09-19019 September 2019 VEGP U3 Proficiency Watches Prior to Fuel Load ML19177A0802019-06-26026 June 2019 Nuclear Generating Plant (CR-3) - Notification of Revised Post-Shutdown Decommissioning Activities Report (Revised PSDAR) ML19170A1942019-06-14014 June 2019 Application for Order Consenting to Direct Transfer of Control of Licenses and Approving Conforming License Amendment ML19129A1402019-05-15015 May 2019 Letter to Hobbs, Correction to Amendment No. 257 Approving Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, Revision 1 2024-01-09
[Table view] |
Text
ENERGY. Crystal River Nudear Plant 15760 W. Power Line Street Crystal River. FL 34428 Docket 50-302 Operating License No. DPR-72 10CFR50.12 10 CFR 50.54(w)(1) December 17. 2015 3F1215-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 -Request for Exemption From 10 CFR 50.54(w)(1)
Regarding Onsite Insurance Coverage
References:
- 1. CR-3 to NRC letter, "Crystal River Unit 3 -Certification of Permanent Cessation of Power Operations and that Fuel Has Been Permanently Removed from the Reactor,"
dated February 20, 2013. (ADAMS Accession No. ML 13056A005)
Dear Sir:
- 2. NRC to CR-3 letter, "Crystal River Unit 3 Nuclear Generating Plant Certification of Permanent Cessation of Operation and Permanent Removal of Fuel from the Reactor,"
dated March 13, 2013. (ADAMS Accession No. ML 13058A380)
- 3. NRC to CR-3 letter dated March 31, 2015, "Crystal River Unit 3 -Issuance of Amendment Regarding Changes to the Emergency Plan and Emergency Action Levels (TAC No. MF3415)"
(ADAMS Accession No. ML 15027 A209) 4. NRC to CR-3 letter dated March 30, 2015, "Crystal River Unit 3 -Exemptions From Certain Emergency Planning Requirements and Related Safety Evaluation (TAC No. MF2981 )" (ADAMS Accession No. ML 15058A906)
In accordance with 10 CFR 50.12, "Specific Exemptions,"
Duke Energy Florida, LLC, formerly known as Duke Energy Florida Inc. (DEF) hereby requests a permanent exemption from 10 CFR 50.54(w)(1) for Crystal River Unit 3 (CR-3). 10 CFR 50.54(w)(1) requires individual power reactor licensees to obtain insurance coverage from private sources to provide protection covering the licensee's obligation, in the unlikely event of an accident, to stabilize and decontaminate the reactor and the reactor site. Specifically, licensees must obtain insurance having a minimum coverage limit for each reactor station site of either $1.06 billion or whatever amount of insurance is generally available from private sources, whichever is less. This insurance coverage is referred to as "onsite coverage" or "onsite insurance coverage."
DEF is requesting an exemption to 10 CFR 50.54(w)(1) to reduce the CR-3 minimum onsite insurance coverage to $50 million.
The underlying purpose of 10 CFR 50.54(w)(1) is to require sufficient property damage insurance to ensure adequate funding of onsite post-accident recovery, stabilization and decontamination costs following an accident at an operating nuclear power plant. However, the regulation does not take into consideration the reduced potential for, and consequences of, such nuclear incidents at permanently shutdown facilities.
The CR-3 facility is a single reactor site and the reactor is permanently shut down and defueled (References 1 and 2). The U.S. Nuclear Regulatory Commission 3F1215-01 Page 2 of 3 proposed exemption would allow a reduction in the level of onsite insurance coverage to a level that is commensurate with the permanently defueled status of the CR-3 facility and the underlying purpose of the rule. The exemption request is provided in the attachment to this letter. DEF requests approval of this proposed exemption by March 31, 2017. The CR-3 reactor was last critical on September 26, 2009. All significant radioactive sources are in the spent fuel pools, and decay heat and source term continue to significantly diminish.
CR-3 determined that the only remaining postulated accident in the permanently defueled condition is the fuel handling accident (FHA). The Radioactive Waste Decay Tank Rupture Accident previously described in the Final Safety Analysis Report is no longer credible as all waste gas has been released and the tank relief valves have been removed. Accident source terms no longer contain particulates (alkali metals),
halogens (iodines),
or noble gases that contribute to dose consequences.
DEF evaluated the consequences of an FHA. The calculation assumed that when the fuel assemblies are damaged underwater, alkali metals (e.g., cesium) remain trapped in the pools, and halogens (iodine's) are decayed.
As a result of decay time and diminishing decay heat during the past 6 years, a release from an FHA would only consist of the noble gas Kr-85. The FHA analysis shows that the dose consequences at the site boundary are well below the 10 CFR 50.67 dose limits without relying upon any systems, structures, or components (SSCs) to remain functional during and following the event. Additionally, DEF evaluated the effects of a beyond design basis accident where the spent fuel assemblies in the spent fuel pool (SFP) are uncovered following a drain down event. The beyond design basis accident SFP drain down event is calculated for the hypothetical situation where the pool is completely dry, with and without ventilation running.
The calculation demonstrates that for spent fuel in the pool with decay times much longer than one year, which is the case for the current condition of CR-3, a zirconium fire cannot occur. A fire would be necessary to create a significant airborne release.
Due to the significant decay time, an airborne release from the spent fuel assemblies in the SFP's is not expected in the event of a loss of water inventory.
The NRC concurred with these conclusions in References 3 and 4 where CR-3 received exemptions for emergency planning in accordance with the planning standards of 1 O CFR 50.47, and emergency planning requirements of 1 O CFR 50, Appendix E. There are no new regulatory commitments made within this submittal.
If you have any questions regarding this submittal, please contact Mr. Phil Rose, Lead Engineer, Nuclear Regulatory
- Affairs, at (352) 563-4883. I declare under penalty of perjury that the foregoing is true and correct.
Executed on December 17, 2015. Ronald R. Reising, Senior Vice President Operations Support RRR/par U. S. Nuclear Regulatory Commission 3F1215-01 Attachments:
A. Request for Exemption from 10 CFR 50.54(w)(1)
Page 3 of 3 B. No Significant Hazards Consideration, Environmental Assessment and Conclusions cc: NRR Project Manager Regional Administrator, Region I