Certification of Permanent Cessation of Operation and Permanent Removal of Fuel from the Reactor
ML13058A380
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/13/2013
From: Gratton C
Plant Licensing Branch II
To: Franke J
Carolina Power & Light Co
Gratton, Chris
References
Download: ML13058A380 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 13, 2013 Mr. Jon A. Franke, Vice President Crystal River Nuclear Plant (NA 1B)

ATTN: Supervisor, Licensing & Regulatory Programs 15760 W. Power Line Street Crystal River, Florida 34428-6708

SUBJECT:

CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT CERTIFICATION OF PERMANENT CESSATION OF OPERATION AND PERMANENT REMOVAL OF FUEL FROM THE REACTOR

Dear Mr. Franke:

By letter dated February 20, 2013, you provided the certification required by Title 10 of the Code of Federal Regulations (10 CFR), Section 50.82(a)(1 )(i) and (ii), that operation has been permanently ceased and that all fuel has been permanently removed from the reactor vessel at Crystal River Unit 3 Nuclear Generating Plant (CR-3). With these certifications, you acknowledge that the 10 CFR Part 50 license for CR-3 no longer authorizes operation of the reactor or emplacement or retention of fuel in the reactor vessel.

This letter acknowledges your certification of permanent cessation of power operation and permanent removal of fuel from the vessel. Therefore, pursuant to 10 CFR 50.82(a)(2), the 10 CFR Part 50 license for CR-3 no longer authorizes operation of the reactor or emplacement or retention of fuel in the reactor vessel.

If you have any questions about this matter, please contact me at (301) 415-1055.

Sincerely, Cl~~

Christopher Gratton, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-302 cc: Distribution via Listserv

March 13,2013 Mr. Jon A. Franke, Vice President Crystal River Nuclear Plant (NA 1B)

ATTN: Supervisor, licensing & Regulatory Programs 15760 W. Power Line Street Crystal River, Florida 34428-6708

SUBJECT:

CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT CERTIFICATION OF PERMANENT CESSATION OF OPERATION AND PERMANENT REMOVAL OF FUEL FROM THE REACTOR

Dear Mr. Franke:

By letter dated February 20, 2013, you provided the certification required by Title 10 of the Code of Federal Regulations (10 CFR), Section 50.82(a)(1)(i) and (ii), that operation has been permanently ceased and that all fuel has been permanently removed from the reactor vessel at Crystal River Unit 3 Nuclear Generating Plant (CR-3). With these certifications, you acknowledge that the 10 CFR Part 50 license for CR-3 no longer authorizes operation of the reactor or emplacement or retention of fuel in the reactor vessel.

This letter acknowledges your certification of permanent cessation of power operation and permanent removal of fuel from the vessel. Therefore, pursuant to 10 CFR 50.82(a)(2), the 10 CFR Part 50 license for CR-3 no longer authorizes operation of the reactor or emplacement or retention of fuel in the reactor vessel.

If you have any questions about this matter, please contact me at (301) 415-1055.

Sincerely, IRA!

Christopher Gratton, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-302 cc: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrDorlLpl2-2 RidsAcrsAcnw_MailCTR LPL2-2 R/F RidsOgcRp RidsN rrLABClayton RidsNrrDorl RidsNrrPMCrystalRiver RidsRgn2MailCenter ADAMS Accession No.: ML13058A380 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC OGC NLO DORLID LPL2-2/PM NAME CGratton BClayton JQuichocho SUttal MEvans CGratton DATE 2/27113 I 2/27113 3113/13 3/4/13 3/8/13 3/13/13 OFFICIAL RECORD COpy