MONTHYEAR3F0805-09, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2005-08-30030 August 2005 Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0603703952006-02-0909 February 2006 Request for Additional Information, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors Project stage: RAI 3F1207-02, Request for Extension of Completion Date for Corrective Actions and Modifications Required by Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized.2007-12-10010 December 2007 Request for Extension of Completion Date for Corrective Actions and Modifications Required by Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized. Project stage: Request 3F0208-05, Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2008-02-29029 February 2008 Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Supplement 3F0808-02, Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, Revision 12008-08-0404 August 2008 Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, Revision 1 Project stage: Request ML0832904142008-12-0202 December 2008 Ria Regarding Response to GL 2004-02 Project stage: Other 3F0209-02, Response to Request for Additional Information, Regarding Response to Generic Letter 2004-022009-02-26026 February 2009 Response to Request for Additional Information, Regarding Response to Generic Letter 2004-02 Project stage: Response to RAI ML0926702612009-10-0202 October 2009 Nuclear Generating Plant - Partial Close Out and Request for Additional Information Related to Generic Letter 2004-02 Project stage: RAI 3F0310-05, Clarification to Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2010-03-22022 March 2010 Clarification to Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Supplement ML12285A3122012-10-15015 October 2012 11/1/12 Forthcoming Meeting Via Conference Call with Duke Energy, Inc. Representing Florida Power Corporate Concerning Generic Letter 2004-02 and Draft Proposed Strainer Fiber Bypass Test Plan for Crystal River ML13056A0052013-02-20020 February 2013 Certification of Permanent Cessation of Power Operations and That Fuel Has Been Permanently Removed from the Reactor Project stage: Request ML13144A7772013-06-0505 June 2013 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors, Project stage: Other 2008-08-04
[Table View] |
Text
PDuke E Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: 10 CFR50.82 10 CFR 50.4 February 20, 2013 3F0213-07 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 - Certification of Permanent Cessation of Power Operations and that Fuel Has Been Permanently Removed from the Reactor
Dear Sir:
Crystal River Unit 3 (CR-3) has been safely shutdown since September 26, 2009, when the plant entered the Cycle 16 refueling outage to replace the steam generators. Twice during the course of the extended outage, all fuel assemblies were offloaded to the spent fuel pool. The final removal of fuel from the reactor vessel was completed on May 28, 2011. As of that date, all fuel assemblies have been removed from the reactor vessel and placed in the spent fuel pool for temporary storage.
Following a comprehensive analysis, Progress Energy Florida, a subsidiary of Duke Energy, announced on February 5, 2013, that it will retire the Crystal River Nuclear Plant in Citrus County, Florida.
Pursuant to 10 CFR 50.82(a)(1)(i) and 10 CFR 50.82(a)(1)(ii), Florida Power Corporation (FPC),
the licensee, hereby certifies to the Nuclear Regulatory Commission that fuel has been permanently removed from the reactor vessel. FPC understands and acknowledges that upon docketing these certifications, the CR-3 10 CFR 50 license no longer authorizes operation of the reactor or emplacement or retention of fuel in the reactor vessel.
FPC will submit, at a later time, the Post-Shutdown Decommissioning Activities Report and the site-specific decommissioning cost estimate in accordance with 10 CFR 50.82.
If you have any questions regarding this submittal, please contact Mr. Dan Westcott, Regulatory Affairs Manager, at (352) 563-4796.
Sice~rel Jo A. Franke
,,ice President Crystal River Nuclear Plant JAF/sam xc:
NRR Project Manager Regional Administrator, Region II Senior Resident Inspector Crystal River Nuclear Plant
£\\(I 15760 W. Power Line Street Crystal River, FL 34428
U. S. Nuclear Regulatory Commission 3F0213-07 STATE OF FLORIDA COUNTY OF CITRUS Jon A. Franke states that he is the Vice President, Crystal River Nuclear Plant for Florida Power Corporation, that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information, and belief
,J'on A. Franke Vice President Crystal River Nuclear Plant The foregoing document was acknowledged before me this day of n,2013, by Jon A. Franke.
Signature of Notary Public State of Florida agfi-CRLYN E. PORTMANN l,."**Commission # DD 937553 i.jftz7 Expires March 1, 2014 (Print, type, or stamp Commissioned Name of Notary Public)
Personally
/
Produced Known L/
-OR-Identification