ML17254A717

From kanterella
Revision as of 14:03, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Revised Proposed Tech Specs Reinstating Senior Reactor Operator Requirement for Operations Manager & Deleting Addition of Operations Supervisor to Plant Operations Review Committee
ML17254A717
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/06/1986
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17254A716 List:
References
NUDOCS 8601130381
Download: ML17254A717 (20)


Text

6.0ADMINISTRATIVE CONTROLS6.16.1.1RESPONSIBILITY ITheSuperintendent-Ginna Production shallberesponsible IIforoverallon-siteGinnaStationoperation andshalldelegateinwritingthesuccession tothisresponsibility duringhisabsence.l860iiCW0500030381860iOb~OR>>'0V9~4i~P6.1-1Proposed

,0.0F1'll LNtSOSSUtNVlQON AttOADMNIStAATIOtt Uttt$0$COMMIIMKAttatt CHAIRMANOFTHEBOARDR.E.GINNANUCLEARPOWERPLANTMANAGEMENTORGANIZATION CHARTPRESIDENT tOICO000SENIORVICEPRESIDENT GENERALSERVICES MANAGERMATERIALS MANAGEMENT DIV.SUPT.ELECT.TRANS.,DIST.BUTILPURCHASING AGENTSUPT.ELECTRICMETERBLABPURCHASING ELECTRICMETER 8LABSTAFFIIIIIIIILIIIIIIIILVICEPRESIDENT V.P.ELECTRICPUBUCAFFAIRS, TRANSMISSION, PURCHASING DISTRIBUTION ANDDISTRICTS 8UTILIZATION VICEPRESIDENT ENGINEERING BCONSTRUCTION CHIEFENGINEERDIRKTOROFENGINEERING SERVICESASSISTANT CHIEFENGINEERMANAGERSDESIGNBCONSTRUCTION SUPERINTENDENT GENERALMAINTENANCE DESIGNANDCONSTRUCTION ENGINEERS ANDFUELMANAGEMENT IIILGENERALMAINTENANCE STAFFQUALITYCONTROLFIGURE6.2-1RKORDS.DOCUMENT CONTROL,DRAFTINGANDTRAININGIIIIIIII-IIIIIIIIIIIIIIMANAGERQUALITYASSURANCE QUALITYASSURANCE STAFFIIIIIIILEXECUTIVE VICEPRESIDVICEPRESIDENT ELECTRICBSTEAMPRODUCTION NSARBVICEPRESIDENT RATESSUPERINTENDENT NUCLEARPRODUCTION TRAININGMANAGERSKURITY,CLAIMS, INSURANCE EMERGENCY PLANNERPORCDIRECTOROFSECURITYSUPERINTENDENT GINNASUPPORTSERVICESNUCLEARASSURANCE IISUPERINTENDENT GINNAPRODUCTION IILPLANTOPERATIONS SUPERVISOR OFNUCLEARSECURITYGINNASTATIONSECURITYORGANIZATION QUALITYCONTROLENGINEERIIIIIIREV.4 4

ROCHESTER GASANDELECTRICCORPORATION GINNASTATIONORGANIZATION SUPERINTENDENT GINNASUPPORTSERVICESSUPERINTENDENT GINNAPRODUCTION TECHNICAL MANAGER-IVIATERIALS SUPERVISOR HEALTHPHYSICSANDCHEMISTRY MANAGERIVIAINTENANCE MANAGEROPERATIONS MANAGERFigure6.2-2 jR.E.GINNASTATIONADMINISTRATIVE ANDHEALTHPHYSICS&CHEMISTRY SECTIONGROUPORGANIZATIONS HEALTHPHYSICSANDCHEMISTRY MANAGERCHEMISTHEALTHPHYSICISTS RADIOCHEMIST CHEMISTRY TECHNICIANS RADIATION PROTECTION FOREMANCHEMISTRY TECHNICIANS RADIATION PROTECTION.

TECHNICIANS 1/SHIFT00Figure6.2-3

R.E.GINNASTATIONMAINTENANCE ANDNUCLEARASSURANCE SECTIONGROUPORGANIZATIONS MAINTENANCE MANAGERNUCLEARASSURANCE MANAGERSGMAINTENANCE MAINTENANCE SUPERVISOR I&CSUPERVISOR QUALITYCONTROLENGINEER.,FIREPROTECTION

&SAFETYCOORDINATOR CENTRALRECORDSFOREMENMAINTENANCE FOREMENI&CANDELECTRICFOREMENQUALITYCONTROLINSPECTION SUPERVISOR FITTERS,MECHANICS HANDYMENTECHNICIANS, REPAIRMEN

&ELECTRICIANS TECHNICIANS Figure6.2-4 Vfj R.E.GINNASTATIONOPERATIONS ANDTECHNICAL SECTIONGROUPORGANIZATIONS OPERATIONS MANAGER(SRO)TECHNICAL MANAGEROPERATIONS SUPERVISOR (SRO)RESULTSANDTESTSUPERVISOR REACTORENGINEERTECHNICAL COMPUTERSYSTEMANALYSTOPERATIONAL ASSESSMENT ENGINEERGINNAMODIFICATION SUPPORTSHIFTSUPERVISOR 1/SHIFT(SRO)RESULTSANDTESTFORMANCOMPUTERTECHNICIANS SHIFTTECHNICAL ADVISOR1/SHIFT*0000CO!TlUAHEADCONTROLOPERATOR1/SHIFT(RO)CONTROLOPERATOR1/SHIFT(RO)AUXILIARY OPERATORS 2/SHIFTTECHNICIAN

&PERFORMANCE TESTERFigure6.2-5*WHENRCSAVERAGETEMPERATURE

)200'F**ASECONDSROWILLBEONSHIFTASREQUIREDBY10CFR50.54WHENRCSAVERAGETEMPERATURE

)200'F 6.5REVIEWANDAUDIT6.5.1Threeseparateorganizational unitsshallbeestablished forthepurposeofreviewandauditofplantoperations andsafetyrelatedmatters.Oneofthesewillbeanonsiteoperations reviewgroup,thePlantOperations ReviewCommittee (PORC).AsecondistheQualityAssurance (Q.A.)group,responsible fortheauditofsafetyrelatedactivities associated withplantoperations.

Athirdistheindependent audit.andreviewgroup,theNuclearSafetyAuditandReviewBoard(NSARB).Thisgroupresponsible fortheperiodicreviewoftheactivities ofthePlantOperations ReviewCommittee, fordirecting auditsandevaluating theirresults,andforthemanagement evaluation ofthestatusandadequacyofthequalityassurance program.PLANTOPERATIONS REVIEWCOMMITTEE (PORC)FUNCTION6.5.1.1ThePlantOperations ReviewCommittee shallfunctiontoadvisetheSuperintendent

-GinnaProduction relatedtonuclearsafetyandforreferralofappropriate matterstotheNuclearSafetyAuditandReviewBoard.6.5-1Proposed 11dll'l1JI"V Thisreorganization willprovidegreatermanagement attention toNuclearAssurance andlongtermplanninganddirection forthestation.Day-to-day operation ofthestationwillbemademoreeffective bycreatingaproduction grouptoconcentrate onoperations, maintenance, andhealthphysicsandchemistry.

TheSupportGroupwillthenbeabletoconcentrate onnon-day-to-day issues.Theremovalofthecommunications pathfromtheQualityControlEngineertotheSuperintendent, NuclearProduction andGinnaStationSuperintendent coincides withelevating theleadqualityresponsibility fromtheQualityControlEngineertotheManager,NuclearAssurance.

ThischangeisintendedtoenhancetheGinnaqualityprogramthroughreestablishing thedirectreporting linktotheresponsible superintendent andthroughreassignment ofaformerexperienced leadQualityControlEngineerasManager,NuclearAssurance.

Thechangeswillnotreducemanagement attention totheoperation ofGinna,willnotreducetheeffectiveness oftheGinnaStaff,isintendedtoimprovetheeffectiveness oftheQualityAssurance organization, andwillnotaffect.thehealthandsafetyofthepublic.ThePurchasing Department willberenamedMaterials Management tobetterreflecttheactivities ofthatdepartment including purchasing throughthePurchasing Agent.Theexistingcommunication betweentheMaterials Management department andotherswithin,theRGEorganization willremainunchanged.

Inpromulgating itsinterimfinalruletocomplywithPublicLaw97-415,theCommission published asguidelines aseriesofexamplesofamendments thatarenotlikelytoinvolvesignificant hazardsconsiderations.

48Fed.Rg.14864,14870.TheCommission's example(i)relatestopurelyadmini'strative changestothetechnical specifications.

Thischangecomeswithinexample(i).Anosignificant hazardsfindingiswarranted.

Theproposedchangedoesnotinvolveasignificant'increase intheprobability orconsequences ofanaccidentpreviously evalu'ated; orcreatethepossibility ofanewordifferent kindofaccidentfromanyaccidentpreviously evaluated; orinvolveasignificant reduction inamarginofsafety.

Ik

~~COMPOSITION 6.5.1.2ThePORCshallbecomposedofthe;Chairman:

Superintendent

-GinnaProduction ViceChairman/Member:

Superintendent

-GinnaSupportServicesViceChairman/Member:

Operations ManagerMember:Member:Member:Member:Member:Member:Member:Member:ALTERNATES Maintenance ManagerInstrument 8ControlSupervisor Technical ManagerResultsandTest,Supervisor ReactorEngineerHealthPhysicsandChemistry ManagerNuclearAssurance ManagerQualityControlEngineer6.5.1.3Alternate membersshallbedesignated byname,inwritingbytheChairman.

MEETINGFREUENCY6.5.1.4ThePORCshallmeetatleastoncepercalendarmonth\andasconvenedbythePORCChairman.

QUORUM6.5.1.5AquorumofthePORCshallconsist.oftheChairmanorViceChairmanandfourmembersincluding alternates.

Nomorethantwoshallbealternates.

6.5-2Proposed I'K AUTHORITY 6.5.2.9a.b.ThechairmanoftheNuclearSafetyAuditandReviewBoardisresponsible tothePresident onVallactivities forwhichthereviewboardisresponsible.

TheNSARBshallreporttoandadvisetheVicePresident, ElectricandSteamProduction, onthoseareasofresponsibility specified inSections6.5.2.7and6.5.2.8.RECORDS6.5.2.10RecordsofNSARBactivities shallbeprepared,

approved, anddistributed asindicated below:a.MinutesshallberecordedofallmeetingsofthisBoard.Copiesoftheminutesshallbeforwarded within14daysfollowing eachmeetingtotheCorporate ChairmanoftheBoard,VicePresident,

,Electric andSteamProduction" andsuchothersas1theChairmanoftheNSARBmaydesignate.

b.C.Reportsofreviewsencompassed bySection6.5.2.7e,f,g,andhabove,shallbeprepared, approvedandforwarded totheVicePresident-Electric andSteamProduction within14daysfollowing completion ofthereview.Auditreportsencompassed bySection6.5.2.8above,shallbeforwarded totheVicePresident, ElectricandSteamProduction andtothemanagement positions responsible fortheareasauditedwithin30daysaftercompletion of,theaudit.6.5-11Proposed hII~1tI1'It Attachment BTheproposedTechnical Specification changereflectschangesintheRG6Emanagement organization andchangesintheGinnaorganization.

Following thesuddendeathoftheSeniorVicePresident, Operations, RG&EManagement, withtheconcurrence oftheBoardofDirectors, hasdecidednottofillthisposition.

Undertheneworganization thevicepresidents whohadreportedtotheSeniorVicePresident, Operations, willnowreportdirectlytothePresident andChiefOperating Officer.ThePresident oftheCompanyhashadanextensive involvement withtheGinnaplantinvariouscapacities sincethetimeofconstruction.

lekArealignment

'of.responsibilities intheEngineering organi-zationhasresultedinachangeintitlewherebytheEngineering Department nowreportstotheVicePresident, Engineering andConstruction, andapositionofChiefEngineerhasbeenreinstated.

ThepositionofAssistant ChiefEngineer, Engineering andConstruction/

hasbeenreplacedbythepositionofDirectorofEngineering Services.

lnordertomaintainindependence oftheQualityAssurance organization fromthedesign,construction andotherengineering functions, theExecutive VicePresident willhaveoverallresponsibility andauthority todirectQualityAssurance, however,theday-to-day direction willcomefromtheChiefEngineer.

TheGinnaorganization changesconsistofthefollowing:

ThepositionofSuperintendent, NuclearProduction andSuperintendent ofGinnaStationhasbeenchangedtothepositionofSuperintendent, NuclearProduction.

ThepositionofSuperintendent ofGinnaStationhasbeendividedintoSuperintendent-Ginna Production andSuperintendent-Ginna SupportServices.

TheSuperintendent Ginna-Production isresponsible foroverallon-siteGinnaStationoperation.

ThepositionofAssistant Superintendent hasbeeneliminated.

NuclearAssurance willreporttotheSuperintendent, NuclearProduction.

CentralRecordswillreporttotheNuclearAssurance Manager.TheHealthPhysicsandChemistry Manager,theMaintenance Manager,andtheOperation ManagerwillreporttotheSuperintendent-Ginna Production.

TheTechnical ManagerandtheMaterials Supervisor willreport.totheSuperintendent-Ginna SupportServices.

Minorchangeshavealsobeenmadeunderthevariousmanagerswhichisreflected inthefigures.

,~a.,1Qf*$hh