Letter Sequence Supplement |
---|
CAC:MF9307, Addition of New Tech Spec on RCS Boron Limits and Revisions to Tech Spec 3.3.1 to Address Rwfs (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
|
MONTHYEARML17053B3932017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses Project stage: Request ML17054C2262017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - WCAP-18083-NP, Rev 0, Westinghouse Revised Thermal Design Procedure Uncertainty Calculations. Project stage: Request ML17054C2292017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Responses to NRC RAIs on August 2013 Methodology Transition LAR Submittal Project stage: Response to RAI ML17054C2272017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Alternative Source Term, Rev 1 Project stage: Request ML17151A9972017-03-0909 March 2017 Wolf Creek Revision 30 to Updated Final Safety Analysis Report, Chapter 3.0, Design of Structures, Components, Equipment, and Systems Project stage: Request WO 17-0026, Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses2017-03-22022 March 2017 Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Project stage: Request ML17100A2662017-04-18018 April 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Transition to Westinghouse Core Design and Safety Analyses Project stage: Acceptance Review ET 17-0011, Response to Supplemental Information Needed for Acceptance of Requested Licensing Action Transition to Westinghouse Core Design and Safety Analyses2017-05-0404 May 2017 Response to Supplemental Information Needed for Acceptance of Requested Licensing Action Transition to Westinghouse Core Design and Safety Analyses Project stage: Request ML17132A3632017-05-15015 May 2017 Acceptance of Requested Licensing Action License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses in Addition to Adopting of Alternative Source Term Project stage: Acceptance Review ML17136A3592017-05-22022 May 2017 Request for Withholding Information from Public Disclosure, 11/14/2016(CAW-16-4499), Affidavit Executed by James A. Gresham, Westinghouse Electric Company LLC Enclosure I of the Letter Dated 01/17/2017 Project stage: Withholding Request Acceptance ML17137A2862017-05-22022 May 2017 Request for Withholding Information from Public Disclosure, 11/14/16 (CAW-16-4500) Affidavit Executed by James A. Gresham, Westinghouse Electric Company LLC for Enclosure VI to the Letter Dated 1/17/17 Project stage: Withholding Request Acceptance ML17166A0382017-06-14014 June 2017 NRR E-mail Capture - Request for Additional Information - License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term Project stage: RAI ET 17-0016, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses2017-07-13013 July 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Project stage: Response to RAI ML17265A0142017-09-21021 September 2017 NRR E-mail Capture - Request for Additional Information - License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Project stage: RAI ML17291A7102017-10-17017 October 2017 NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term Project stage: RAI ET 17-0024, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term2017-10-18018 October 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term Project stage: Response to RAI ML17297B7972017-10-31031 October 2017 Request for Withholding Information from Public Disclosure (CAC No. MF9307; EPID L 2017-LLA-0211) Project stage: Withholding Request Acceptance ET 17-0025, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term2017-11-14014 November 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term Project stage: Response to RAI ML17331A1782017-12-0404 December 2017 Request for Additional Information License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternate Source Term (CAC No. MF9307; EPID L-2017-LLA-0211) Project stage: RAI WO 18-0004, Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ...2018-01-15015 January 2018 Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ... Project stage: Response to RAI ET 18-0004, Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-01-29029 January 2018 Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Supplement L-2018-077, Schedule for Re-Analysis of Turkey Point Licensing Basis Analyses Affected by PAD5 Implementation2018-03-27027 March 2018 Schedule for Re-Analysis of Turkey Point Licensing Basis Analyses Affected by PAD5 Implementation Project stage: Request ML18114A1162018-04-19019 April 2018 SAP-18-34, Supplemental 30 Day Responses to NRC Request for Additional Information Regarding Wolf Creek Generating Station Transition to Westinghouse Safety Analysis and Alternate Source Term Methodologies. Project stage: Supplement ET 18-0012, Operating Corp., Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-04-19019 April 2018 Operating Corp., Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Supplement ML18115A3522018-05-0303 May 2018 Request for Withholding Information from Public Disclosure, Affidavit Dated April 16, 2018 Supplemental 30 Day Responses to NRC RAI WCGS Transition to Westinghouse Safety AST Methodolgies Project stage: RAI ML18107A7562018-05-0303 May 2018 Regulatory Audit Summary License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term (CAC MF9307; EPID L-2017-LLA-0211) Project stage: Other ET 18-0018, Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-06-19019 June 2018 Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Supplement ML18183A5832018-07-23023 July 2018 Request for Withholding Information from Public Disclosure - 6/18/18 Affidavit Executed by Edmond J. Mercier, Westinghouse Electric Company Adoption of AST Amendment Request(Cac No. MF9307; EPID L-2017-LLA-0211) Project stage: Withholding Request Acceptance WO 18-0034, Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-08-0909 August 2018 Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Supplement ML18270A0942018-10-0404 October 2018 Request for Additional Information License Amendment Request for Transition to Westinghouse Methodology for Selected Accident and Transient Analyses Project stage: RAI ML18332A1772018-10-25025 October 2018 Email Slides for 10/30 Public Meeting Project stage: Request ML18313A2252018-10-25025 October 2018 Westinghouse Affidavit CAW-18-4828 - Application for Withholding Proprietary Information from Public Disclosure Project stage: Request ML18299A0492018-10-30030 October 2018 Accident Analyses Methodology Transition LAR Public Meeting Project stage: Meeting ML18304A1052018-11-0505 November 2018 Request for Additional Information License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses and Alternative Source Term (CAC No. MF9307; EPID L-2017-LLA-0211) Project stage: RAI WO 18-0047, Timeline for Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-11-15015 November 2018 Timeline for Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Response to RAI WO 18-0044, Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-11-15015 November 2018 Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Request ML18313A2542018-11-16016 November 2018 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation Regarding License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses for Wolf Creek Generating Station Project stage: Meeting ML18327A1342018-11-30030 November 2018 Request for Withholding Information from Public Disclosure, Affidavit Dated October 25, 2018, Executed by Mr. Paul A. Russ, Westinghouse (CAC No. MF9307; EPID L-2017-LLA-0211) Project stage: Withholding Request Acceptance ET 18-0035, Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-12-0606 December 2018 Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Supplement ML18360A0342018-12-21021 December 2018 NRR E-mail Capture - Review Schedule for Wolf Creek Generating Station License Amend Request (LAR) for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term Project stage: Other ML19070A1162019-03-0505 March 2019 Westinghouse, Responses to NRC Request for Additional Information Documented in ADAMS Accession No. ML 18270A094 on the Core Design and Safety Analyses Methodology Transition Program Project stage: Response to RAI ML19070A1392019-03-0505 March 2019 Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption. Project stage: Request ET 19-0008, Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption.2019-03-0505 March 2019 Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption. Project stage: Response to RAI ML19099A1772019-04-16016 April 2019 Request for Withholding Information from Public Disclosure, 2/13/19 Affidavit Executed by Stephen Rigby, Westinghouse Electric Company LLC RAI Response Related to Adoption of Alternative Source Term (CAC MF9307; EPID L-2017-LLA-0211) Project stage: RAI ML19100A1222019-05-31031 May 2019 Issuance of Amendment No. 221 License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term Project stage: Approval 2018-10-25
[Table View] |
|
---|
Category:Legal-Affidavit
MONTHYEARWO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082023-12-26026 December 2023 Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 WO 22-0056, Operating Corporations Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082022-12-19019 December 2022 Operating Corporations Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 ML22353A5552022-12-15015 December 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements ET 21-0017, Response to Request for Additional Information Regarding License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2021-12-22022 December 2021 Response to Request for Additional Information Regarding License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ET 21-0012, Supplement to License Amendment Request for a Risk-Informed Resolution to GSI-1912021-10-11011 October 2021 Supplement to License Amendment Request for a Risk-Informed Resolution to GSI-191 ET 19-0008, Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption.2019-03-0505 March 2019 Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption. ML18313A2252018-10-25025 October 2018 Westinghouse Affidavit CAW-18-4828 - Application for Withholding Proprietary Information from Public Disclosure ET 18-0016, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Request for Supplemental Information2018-05-29029 May 2018 Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Request for Supplemental Information ET 18-0012, Operating Corp., Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-04-19019 April 2018 Operating Corp., Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term ET 15-0002, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.6.5, for Large Break Loss-of-Coolant (LOCA) Analysis Methodology2015-01-21021 January 2015 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.6.5, for Large Break Loss-of-Coolant (LOCA) Analysis Methodology ET 14-0009, Response to Request for Additional Information Regarding License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis2014-02-25025 February 2014 Response to Request for Additional Information Regarding License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis ML12298A0302012-10-22022 October 2012 Transmittal of Pci Proprietary Document No. PCI-2012.10.22-1 Rev 0; Responses to Staff Comments Dated July 11, 2012 ET 08-0017, Additional-Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification2008-03-14014 March 2008 Additional-Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification ET 07-0050, Response to Request for Additional Information Relating to Replacement of the Main Steam and Feedwater Isolation Valves and Controls2007-10-16016 October 2007 Response to Request for Additional Information Relating to Replacement of the Main Steam and Feedwater Isolation Valves and Controls ET 07-0022, Supplemental Information on Main Steam and Feedwater Isolation System Controls Modification2007-06-15015 June 2007 Supplemental Information on Main Steam and Feedwater Isolation System Controls Modification ML0715502252007-05-25025 May 2007 PWR Owners Group - Draft Revisions to Topical Report WCAP-15791 Revision 1, Risk-Informed Evaluation of Extensions to Containment Isolation Valve Completion Times, and the Final Safety Evaluation, MUHP-3010/LSC-0029/LSC-0135 ML0701702062006-11-0202 November 2006 Request for Withholding Proprietary Documentation of Material: White Paper: MRP Review of Implications of Wolf Creek Pressurizer Indications 2023-12-26
[Table view] Category:Letter
MONTHYEAR05000482/LER-2024-001-01, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-10-22022 October 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing ML24296B1902024-10-22022 October 2024 10 CFR 50.55a Requests for the Fifth Ten-Year Interval Inservice Testing Program 05000482/LER-2024-002, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-10-21021 October 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24283A0752024-10-0909 October 2024 Notification of Commercial Grade Dedication Inspection (05000482/2025012) and Request for Information ML24199A1712024-09-17017 September 2024 Issuance of Amendment No. 241 Revise Ventilation Filter Testing Program Criteria and Administrative Correction of Absorber in Technical Specification 5.5.11 ML24260A0712024-09-12012 September 2024 License Amendment Request for a Risk-Informed Resolution to GSI-191 IR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML24248A2492024-09-0404 September 2024 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 26 Owner’S Activity Report ML24241A2212024-08-29029 August 2024 Notice of Enforcement Discretion for Wolf Creek Generating Station ML24240A2642024-08-27027 August 2024 Corporation - Request for Notice of Enforcement Discretion Regarding Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 05000482/LER-2024-001, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-07-0202 July 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) ML24150A0562024-05-29029 May 2024 Foreign Ownership, Control or Influence (FOCI) Information – Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML23345A1602024-05-0909 May 2024 Revision of Safety Evaluation for Amendment No. 237 Request for Deviation from Fire Protection Requirements ML24089A2622024-04-29029 April 2024 Financial Protection Levels ML24118A0022024-04-27027 April 2024 Wolf Generating Nuclear Station - 2023 Annual Radiological Environmental Operating Report ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24113A1882024-04-19019 April 2024 Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML24109A1212024-04-18018 April 2024 (WCGS) Form 5 Exposure Report for Calendar Year 2023 ML24109A1842024-04-18018 April 2024 Cycle 27 Core Operating Limits Report IR 05000482/20240012024-04-17017 April 2024 Integrated Inspection Report 05000482/2024001 ML24114A1442024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37 ML24106A1482024-04-15015 April 2024 Notification of Inspection (NRC Inspection Report 05000482/2024003) and Request for Information ML24098A0052024-04-0707 April 2024 2023 Annual Environmental Operating Report ML24089A1352024-03-29029 March 2024 10 CFR 50.46 Annual Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes ML24089A0972024-03-29029 March 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24074A3312024-03-14014 March 2024 Missed Quarterly Inspection Per 40 CFR 266 Subpart N ML24080A3452024-03-11011 March 2024 7 of the Wolf Creek Generating Station Updated Safety Analysis Report IR 05000482/20240122024-03-11011 March 2024 Fire Protection Team Inspection Report 05000482/2024012 ML24016A0702024-03-0808 March 2024 Issuance of Amendment No. 240 Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ML24068A1992024-03-0707 March 2024 Changes to Technical Specification Bases - Revisions 93 and 94 ML24066A0672024-03-0505 March 2024 4-2022-024 Letter - OI Closure to Licensee ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners ML24059A1702024-02-28028 February 2024 Annual Fitness for Duty Program Performance Report, and Annual Fatigue Report for 2023 IR 05000482/20230062024-02-28028 February 2024 Annual Assessment Letter for Wolf Creek Generating Station Report 05000482/2023006 ML24026A0212024-02-27027 February 2024 Issuance of Amendment No. 239 Modified Implementation Date of License Amendment No. 238 ML24050A0012024-02-19019 February 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24036A0092024-02-14014 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0075 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 2024-09-06
[Table view] |
Text
M~,LFCREEK
'NUCLEAR OPERATING CORPORATION April 19, 2018 Jaime H. McCoy Vice President Engineering ET 18-0012 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555
References:
- 1) Letter ET 17-0001, dated January 17, 2017, from J. H. McCoy, WCNOC, to USNRC
Subject:
- 2) Letter dated December 4, 2017, from B. K. Singal, USNRC, to A. C. Heflin, WCNOC, "Wolf Creek Generating Station -Request for Additional Information Re: License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term (CAC No. MF9307; EPID L-2017-LLA-0211)
- 3) Letter WO 18-0004, dated January 15, 2018, from C. 0. Reasoner, WCNOC, to USNRC 4) Letter ET 18-0004, dated January 29, 2018, from J. H. McCoy, WCNOC, to USNRC Docket No. 50-482: Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term To Whom It May Concern:
Reference 1 provided the Wolf Creek Nuclear Operating Corporation (WCNOC) application to revise the Wolf Creek Generating Station (WCGS) Technical Specifications (TS). The proposed amendment would support transition to the Westinghouse Core Design and Safety Analysis methodologies.
In addition, the amendment request included revising the WCGS licensing basis by adopting the Alternative Source Term radiological analysis methodology in accordance with 10 CFR 50.67, "Accident Source Term." Reference 2 provided a request for additional information related to the application.
References 3 and 4 provided responses to requests for additional information (RAI) related to the application.
P.O. Box 411 / Burlington, KS 66839 / Phone: {620) 364-8831 An Equal Opportunity Employer M/F/HCNET ET 18-0012 Page 2 of 3 On March 19-20, 2018, Westinghouse and WCNOC participated in a technical audit requested by the Nuclear Regulatory Commission (NRG) to resolve questions over the responses provided in References 3 and 4. The audit resolved a portion of the RAI responses, but others required supplemental responses be provided.
This letter contains supplemental responses for the following RAI questions found in Reference 2: ARCB1-FHA-2, ARCB1-SGTR-2, ARCB1-MSLB-2, and ARCB1-WT-3.
The remaining RAI responses will be provided in a separate letter at a later date. The additional information does not expand the scope of the application and does not impact the no significant hazards consideration determination presented in Reference
- 1. In accordance with 1 O CFR 50.91, "Notice for public comment; State consultation,"
a copy of this submittal is being provided to the designated Kansas State official.
This letter contains no commitments.
If you have any questions concerning this matter, please contact me at (620) 364-4156, or Cynthia R. Hafenstine at (620) 364-4204.
Sincerely, 9~~W'7/ Jaime H. McCoy JHM/rlt
Enclosures:
Attachment 1 to SAP-18-34, "Supplemental 30 Day Responses to Nuclear Regulatory Commission Request for Additional Information Regarding Wolf Creek Generating Station Transition to Westinghouse Safety Analysis and Alternate Source Term Methodologies"
-Non-Proprietary II Attachment 2 to SAP-18-34, "Supplemental 30 Day Responses to Nuclear Regulatory Commission Request for Additional Information Regarding Wolf Creek Generating Station Transition to Westinghouse Safety Analysis and Alternate Source Term Methodologies"
-Proprietary Ill CAW-18-4733, Revision 0, "Application for Withholding Proprietary Information from Public Disclosure,"
April, 2018. cc: K. M. Kennedy (NRG), w/e B. K. Singal (NRG), w/e K. S. Steves (KDHE), w/e (Non-Proprietary only) N. H. Taylor (NRG), w/e Senior Resident Inspector (NRG), w/e ET 18-0012 Page 3 of 3 STATE OF KANSAS ) ) ss COUNTY OF COFFEY ) Jaime H. McCoy, of lawful age, being first duly sworn upon oath says that he is Vice President Engineering of Wolf Creek Nuclear Operating Corporation; that he has read the foregoing document and knows the contents thereof; that he has executed the same for and on behalf of said Corporation with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief. By ___ ...,.......
_________
..,.._ __ Jaime H. cCoy Vice Pr: sident Engineering SUBSCRIBED and sworn to before me this /qt~day of ~n' ( , 2018. GAYLE SHEPHEARD My Appoinbnent Expires July 24, 2019 &µJ Expiration Date __ !_( d-._c./-~f d)_EJ_/ q~-
Enclosure Ill to ET 18-0012 CAW-18-4733, Revision 0, "Application for Withholding Proprietary Information from Public Disclosure,"
April, 2018. (9 pages including this page)
Westinghouse Non-Proprietary Class 3 @ Westinghouse U.S. Nuclear Regulatory Commission Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Westinghouse Electric Company 1000 Westinghouse Drive Cranberry
- Township, Pennsylvania 16066 USA Direct tel: (412) 374-4643 Direct fax: (724) 940-8542 e-mail: greshaja@westinghouse.com CAW-18-4733 April 16, 2018 APPLICATION FOR WITHHOLDING PROPRJETARY INFORMATION FROM PUBLIC DISCLOSURE
Subject:
SAP-18-34, P-Attachment, "Supplemental 30 Day Responses to Nuclear Regulatory Commission Request for Additional Information Regarding Wolf Creek Generating Station Transition to Westinghouse Safety Analysis and Alternate Source Term Methodologies
[Proprietary],"
April 2018 The Application for Withholding Proprietary Information from Public Disclosure is submitted by Westinghouse Electric Company llC ("Westinghouse"),
pursuant to the provisions of paragraph (b)(l) of Section 2.390 of the Nuclear Regulatory Commission's
("Commission's")
regulations.
It contains commercial strategic information proprietary to Westinghouse and customarily held in confidence.
The proprietary information for which withholding is being requested in the above-referenced report is further-identified in Affidavit CAW-18-4733 signed by the owner of the proprietary information, Westinghouse.
The Affidavit, which accompanies this letter, sets forth the basis on which the infonnation may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CPR Section 2.390 of the Commission's regulations.
Accordingly, this letter authorizes the utilization of the accompanying Affidavit by Wolf Creek Nuclear Generating Station.
Correspondence with respect to the proprietary aspects of the Application for Withholding or the Westinghouse Affidavit should reference CA W-18-4 733, and should be addressed to James A. Gresham,
- Manager, Regulatory Compliance, Westinghouse Electric
- Company, 1000 Westinghouse Drive, Building 2, Suite 259, Cranberry
- Township, Pennsylvania 16066. . ') A~,*,? t1 //[ ') ' . . "-1~.wY * *~ .. ----. If '"/ !/James A. Gresham, Manager Regulatory Compliance
© 2018 Westinghouse Electric Company LLC. All Rights Reserved.
CAW-18-4733 AFFIDAVIT COMMONWEALTH OF PENNSYLVANIA:
ss COUNTY OF BUTLER: I, James A Gresham, am authorized to execute this Affidavit on behalf of Westinghouse Electric Company LLC (Westinghouse")
and declare that the averments of fact set forth in this Affidavit are true and correct to the best of my knowledge, information, and belief. Executed on: 1--1-r~,
be....,.,
f-'-JY_*
--v James A Gresham, Manager Regulatory Compliance 3 CA W-18-4733 (1) I am Manager, Regulatory Compliance, Westinghouse Electric Company LLC ("Westinghouse"),
and as such, I have been specifically delegated the function of reviewing the proprietary information sought to be withheld from public disclosure in connection with nuclear power plant licensing and rule making proceedings, and am authorized to apply for its withholding on behalf of Westinghouse.
(2) I am making this Affidavit in conformance with the provisions of 10 CFR Section 2.390 of the ~uclear Regulatory Commission's
("Commission's")
regulations and in conjunction with the Westinghouse Application for Withholding Proprietary Information from Public Disclosure accompanying this Affidavit.
(3) I have personal knowledge of the criteria and procedures utilized by Westinghouse in designating information as. a trade secret, privileged or as confidential commercial or financial information.
( 4) Pursuant to the provisions of paragraph (b )( 4) of Section 2.390 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.
(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.
(ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence.
The application of that system and the substance of that system constitute Westinghouse policy and provide the rational basis required.
Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows:
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of 4 CAW-18-4733 Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
(b) It consists of supporting data, including test data, relative to a process ( or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage (e.g., by optimization cir improved marketability).
(c) Its use by a competitor would reduce his expenditure ofresources or improve his competitive position in the design, manufacture, shipment.
installation, assurance of quality, or licensing a similar product.
. (d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.
( e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.
(f) It contains patentable ideas, for which patent protection may be desirable.
(iii) There are sound policy reasons behind the Westinghouse system which include the following:
(a) The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors.
It is, therefore, withheld from disclosure to protect the Westinghouse competitive position.
(b) It is information that is marketable in many ways. The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information.
(c) Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense.
5 CAW-18-4733 (d) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage.
If competitors acquire components of proprietary information, any one component may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage.
(e) Unrestricted disclosure would jeopardize the position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries.
(f) The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage.
(iv) The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR Section 2.390, is to be received in confidence by the Commission.
(v) The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief. (vi) The proprietary information sought to be withheld in this submittal is that which is appropriately marked in SAP-18-34 P-Attacbment, "Supplemental 30 Day Responses to Nuclear Regulatory Commission Request for Additional Information Regarding Wolf Creek Generating Station Transition to Westinghouse Safety Analysis and Alternate Source Term Methodologies
[Proprietary],"
April 2018, for submittal to the Commission, being transmitted by Wolf Creek Nuclear Generating Station letter. The proprietary information as submitted by Westinghouse is that associated with Westinghouse Alternate Source Term analysis and Methodology Transition, and may be used only for that purpose.
(a) This information is part of that which will enable Westinghouse to support Wolf Creek for the Alternate Source Term analysis and Methodology Transition.
6 CAW-18-4733 (b) Further, this information has substantial commercial value as follows:
(i) Westinghouse plans to sell the use of similar information to its customers for the purpose of Alternate Source Term analysis and Methodology Transition.
(ii) Westinghouse can sell support and defense of industry guidelines and acceptance criteria for plant-specific applications.
(iii) The information requested to be withheld reveals the distinguishing aspects of a methodology which was developed by Westinghouse.
Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar technical evaluation justifications and licensing defense services for commercial power reactors without commensurate expenses.
Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.
The development of the technology described in part by the information is the result of applying the results of many years of experience in. an intensive Westinghouse effort and the expenditure of a considerable sum of money. In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended.
Further the deponent sayeth not.
PROPRIETARY INFORMATION NOTICE Transmitted herewith are proprietary and non-proprietary versions of a document, furnished to the NRC in connection with requests for generic and/or plant-specific review and approval.
In order to conform to the requirements of 10 CFR 2.390 of the Commission's regulations concerning the protection of proprietary information so submitted to the NRC, the information which is proprietary in the proprietary versions is contained within brackets, and where the proprietary information has been deleted in the non-proprietary
- versions, only the brackets remain (the information that was contained within the brackets in the proprietary versions having been deleted).
The justification for claiming the information so designated as proprietary is indicated in both versions by means of lower case letters (a) through (f) located as a superscript immediately following the brackets enclosing each item of information being identified as proprietary or in the margin opposite such information.
These lower case letters refer to the types .of information Westinghouse customarily holds in confidence identified in Sections (4)(ii)(a) through (4)(ii)(f) of the Affidavit accompanying this transmittal pursuant to 10 CFR 2.390(b)(l).
COPYRIGHT NOTICE The reports transmitted herewith each bear a Westinghouse copyright notice. The NRC is permitted to make the number of copies of the information contained in these reports which are necessary for_ its internal use in connection with generic and plant-specific reviews and approvals as well as the issuance, denial, amendment,
- transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 CFR 2.390 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by Westinghouse, copyright protection notwithstanding.
With respect to the non-proprietary versions of these reports, the NRC is permitted to make the number of copies beyond those necessary for its internal use which are necessary in order to have one copy available for public viewing in the appropriate docket files in the public document room in Washington, DC and in local public document rooms as may be required by NRC regulations if the number of copies submitted is insufficient for this purpose.
Copies made by the NRC must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.
Wolf Creek Nuclear Generation Station Letter for Transmittal to the NRC The following paragraphs should be included in your letter to the NRC Document Control Desk: Enclosed are: 1. SAP-18-34 NP-Attachment, "Supplemental 30 Day Responses to Nuclear Regulatory Commission Request for Additional Information Regarding Wolf Creek Generating Station Transition to Westinghouse Safety Analysis and Alternate Source Term Methodologies
[Non-Proprietary],"
April 2018 2. SAP-18-34 P-Attachment, "Supplemental 30 Day Responses to Nuclear Regulatory Commission Request for Additional Information Regarding Wolf Creek Generating Station Transition to Westinghouse Safety Analysis and Alternate Source Term Methodologies
[Proprietary],"
April 2018 Also enclosed are the Westinghouse Application for Withholding Proprietary Information from Public Disclosure CA W-18-4733, accompanying Affidavit, Proprietary Information Notice, and Copyright Notice. As Item 1 contains information proprietary to Westinghouse Electric Company LLC ("Westinghouse"),
it is supported by an Affidavit signed by Westinghouse, the owner of the information.
The Affidavit sets forth the b'asis on which the information may be withheld from public disclosure by the Nuclear Regulatory Commission
("Commission")
and addresses with specificity the considerations listed in paragraph (b)(4) of Section 2.390 of the Commission's regulations.
Accordingly, it is respectfully requested that the information which is proprietary to Westinghouse be withheld from public disclosure in accordance with 10 CFR Section 2.390 of the Commission's regulations.
Correspondence with respect to the copyright or proprietary aspects of the items listed above or the supporting Westinghouse Affidavit should reference CAW-18-4733 and should be addressed to James A. Gresham,
- Manager, Regulatory Compliance, Westinghouse Electric
- Company, 1000 Westinghouse Drive, Building 2, Suite 259, Cranberry
- Township, Pennsylvania 16066.