Letter Sequence Request |
---|
CAC:MF9307, Addition of New Tech Spec on RCS Boron Limits and Revisions to Tech Spec 3.3.1 to Address Rwfs (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
|
MONTHYEARML17053B3932017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses Project stage: Request ML17054C2262017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - WCAP-18083-NP, Rev 0, Westinghouse Revised Thermal Design Procedure Uncertainty Calculations. Project stage: Request ML17054C2292017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Responses to NRC RAIs on August 2013 Methodology Transition LAR Submittal Project stage: Response to RAI ML17054C2272017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Alternative Source Term, Rev 1 Project stage: Request ML17151A9972017-03-0909 March 2017 Wolf Creek Revision 30 to Updated Final Safety Analysis Report, Chapter 3.0, Design of Structures, Components, Equipment, and Systems Project stage: Request WO 17-0026, Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses2017-03-22022 March 2017 Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Project stage: Request ML17100A2662017-04-18018 April 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Transition to Westinghouse Core Design and Safety Analyses Project stage: Acceptance Review ET 17-0011, Response to Supplemental Information Needed for Acceptance of Requested Licensing Action Transition to Westinghouse Core Design and Safety Analyses2017-05-0404 May 2017 Response to Supplemental Information Needed for Acceptance of Requested Licensing Action Transition to Westinghouse Core Design and Safety Analyses Project stage: Request ML17132A3632017-05-15015 May 2017 Acceptance of Requested Licensing Action License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses in Addition to Adopting of Alternative Source Term Project stage: Acceptance Review ML17136A3592017-05-22022 May 2017 Request for Withholding Information from Public Disclosure, 11/14/2016(CAW-16-4499), Affidavit Executed by James A. Gresham, Westinghouse Electric Company LLC Enclosure I of the Letter Dated 01/17/2017 Project stage: Withholding Request Acceptance ML17137A2862017-05-22022 May 2017 Request for Withholding Information from Public Disclosure, 11/14/16 (CAW-16-4500) Affidavit Executed by James A. Gresham, Westinghouse Electric Company LLC for Enclosure VI to the Letter Dated 1/17/17 Project stage: Withholding Request Acceptance ML17166A0382017-06-14014 June 2017 NRR E-mail Capture - Request for Additional Information - License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term Project stage: RAI ET 17-0016, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses2017-07-13013 July 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Project stage: Response to RAI ML17265A0142017-09-21021 September 2017 NRR E-mail Capture - Request for Additional Information - License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Project stage: RAI ML17291A7102017-10-17017 October 2017 NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term Project stage: RAI ET 17-0024, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term2017-10-18018 October 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term Project stage: Response to RAI ML17297B7972017-10-31031 October 2017 Request for Withholding Information from Public Disclosure (CAC No. MF9307; EPID L 2017-LLA-0211) Project stage: Withholding Request Acceptance ET 17-0025, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term2017-11-14014 November 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term Project stage: Response to RAI ML17331A1782017-12-0404 December 2017 Request for Additional Information License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternate Source Term (CAC No. MF9307; EPID L-2017-LLA-0211) Project stage: RAI WO 18-0004, Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ...2018-01-15015 January 2018 Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ... Project stage: Response to RAI ET 18-0004, Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-01-29029 January 2018 Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Supplement L-2018-077, Schedule for Re-Analysis of Turkey Point Licensing Basis Analyses Affected by PAD5 Implementation2018-03-27027 March 2018 Schedule for Re-Analysis of Turkey Point Licensing Basis Analyses Affected by PAD5 Implementation Project stage: Request ML18114A1162018-04-19019 April 2018 SAP-18-34, Supplemental 30 Day Responses to NRC Request for Additional Information Regarding Wolf Creek Generating Station Transition to Westinghouse Safety Analysis and Alternate Source Term Methodologies. Project stage: Supplement ET 18-0012, Operating Corp., Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-04-19019 April 2018 Operating Corp., Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Supplement ML18115A3522018-05-0303 May 2018 Request for Withholding Information from Public Disclosure, Affidavit Dated April 16, 2018 Supplemental 30 Day Responses to NRC RAI WCGS Transition to Westinghouse Safety AST Methodolgies Project stage: RAI ML18107A7562018-05-0303 May 2018 Regulatory Audit Summary License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term (CAC MF9307; EPID L-2017-LLA-0211) Project stage: Other ET 18-0018, Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-06-19019 June 2018 Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Supplement ML18183A5832018-07-23023 July 2018 Request for Withholding Information from Public Disclosure - 6/18/18 Affidavit Executed by Edmond J. Mercier, Westinghouse Electric Company Adoption of AST Amendment Request(Cac No. MF9307; EPID L-2017-LLA-0211) Project stage: Withholding Request Acceptance WO 18-0034, Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-08-0909 August 2018 Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Supplement ML18270A0942018-10-0404 October 2018 Request for Additional Information License Amendment Request for Transition to Westinghouse Methodology for Selected Accident and Transient Analyses Project stage: RAI ML18332A1772018-10-25025 October 2018 Email Slides for 10/30 Public Meeting Project stage: Request ML18313A2252018-10-25025 October 2018 Westinghouse Affidavit CAW-18-4828 - Application for Withholding Proprietary Information from Public Disclosure Project stage: Request ML18299A0492018-10-30030 October 2018 Accident Analyses Methodology Transition LAR Public Meeting Project stage: Meeting ML18304A1052018-11-0505 November 2018 Request for Additional Information License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses and Alternative Source Term (CAC No. MF9307; EPID L-2017-LLA-0211) Project stage: RAI WO 18-0047, Timeline for Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-11-15015 November 2018 Timeline for Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Response to RAI WO 18-0044, Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-11-15015 November 2018 Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Request ML18313A2542018-11-16016 November 2018 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation Regarding License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses for Wolf Creek Generating Station Project stage: Meeting ML18327A1342018-11-30030 November 2018 Request for Withholding Information from Public Disclosure, Affidavit Dated October 25, 2018, Executed by Mr. Paul A. Russ, Westinghouse (CAC No. MF9307; EPID L-2017-LLA-0211) Project stage: Withholding Request Acceptance ET 18-0035, Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-12-0606 December 2018 Operating Corp., Supplemental Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term Project stage: Supplement ML18360A0342018-12-21021 December 2018 NRR E-mail Capture - Review Schedule for Wolf Creek Generating Station License Amend Request (LAR) for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term Project stage: Other ML19070A1162019-03-0505 March 2019 Westinghouse, Responses to NRC Request for Additional Information Documented in ADAMS Accession No. ML 18270A094 on the Core Design and Safety Analyses Methodology Transition Program Project stage: Response to RAI ML19070A1392019-03-0505 March 2019 Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption. Project stage: Request ET 19-0008, Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption.2019-03-0505 March 2019 Response to Request for Additional Information Related to Thermal Conductivity Degradation for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption. Project stage: Response to RAI ML19099A1772019-04-16016 April 2019 Request for Withholding Information from Public Disclosure, 2/13/19 Affidavit Executed by Stephen Rigby, Westinghouse Electric Company LLC RAI Response Related to Adoption of Alternative Source Term (CAC MF9307; EPID L-2017-LLA-0211) Project stage: RAI ML19100A1222019-05-31031 May 2019 Issuance of Amendment No. 221 License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses Including Adoption of Alternative Source Term Project stage: Approval 2018-10-25
[Table View] |
|
---|
Category:Letter
MONTHYEARML24025A0992024-01-25025 January 2024 Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML24018A0792024-01-22022 January 2024 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd and Opportunity for a Hearing (EPID L-2024-LLA-0007) (Letter) ML24018A1382024-01-18018 January 2024 Inservice Inspection Request for Information ML24018A2482024-01-18018 January 2024 License Amendment Request to Modify the Implementation Date of License Amendment No. 238 IR 05000482/20230042024-01-11011 January 2024 Integrated Inspection Report 05000482/2023004 ML23356A0722024-01-0404 January 2024 Supplemental Information Needed for Acceptance of Requested Licensing Actions Exemption from Specific 10 CFR Part 73N Requirements (EPID L-2023-LLE-0048) (Redacted Version) WO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082023-12-26026 December 2023 Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 ML23348A3662023-12-18018 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000482 2024012) and Request for Information ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23299A2662023-11-29029 November 2023 Issuance of Amendment No. 238 Modified Implementation Date of License Amendment No. 237 ML23331A4972023-11-27027 November 2023 Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23325A2112023-11-20020 November 2023 Submittal of Request for Exemption from Specific Provisions in 10 CFR 73.55 ML23320A2772023-11-16016 November 2023 License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML23292A3592023-10-19019 October 2023 License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23292A3572023-10-19019 October 2023 Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation ML23277A2772023-10-11011 October 2023 Regulatory Audit Summary Concerning Review of Request Number CI3R-01 for Proposed Alternative Inspection Frequency for Containment Unbonded Post Tensioning System Components ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23276B4552023-10-0303 October 2023 Technical Specification 5.6.8 Post Accident Monitoring (PAM) Report ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L ML23256A2062023-09-14014 September 2023 Withdrawal of Requested Licensing Action Exemption from Specific 10 CFR Part 73 Requirements ML23165A2502023-08-31031 August 2023 Issuance of Amendment No. 237 Request for Deviation from Fire Protection Requirements ML23243A0002023-08-31031 August 2023 Wolf Generating Station - Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 ML23221A3932023-08-0909 August 2023 Submittal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML23220A4222023-08-0808 August 2023 Supplement to License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ML23201A1212023-08-0707 August 2023 Issuance of Amendment No. 236 Revision to Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML23130A2902023-07-26026 July 2023 Issuance of Amendment No. 235 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000482/20230022023-07-11011 July 2023 Integrated Inspection Report 05000482/2023002 ML23167A0042023-06-26026 June 2023 Audit Plan to Support Review of Request for Alternative Containment Inservice Inspection Frequency IR 05000482/20234012023-06-21021 June 2023 Security Baseline Inspection Report 05000482/2023401 ML23171B1312023-06-20020 June 2023 Additional Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) ML23135A1172023-05-0808 May 2023 Redacted Version of Revision 36 to Updated Safety Analysis Report ML23117A2112023-04-27027 April 2023 Annual Exposure Report (2022) ML23117A1342023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report Report 46 2024-01-04
[Table view] |
Text
wtl.FCREEK NUCLEAR OPERATING CORPORATION Jaime H. McCoy January 17, 2017 Vice President Engineering ET 17-0001 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555
Subject:
Docket No. 50-482: License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses Gentlemen:
Pursuant to 10 Code of Federal Regulations* (CFR) 50.90, "Application for amendment of license, construction permit, or early site permit," Wolf Creek Nuclear Operating Corporation (WCNOC) hereby requests an amendment to Renewed Facility Operating License No. NPF-42 for the Wolf Creek Generating Station (WCGS).
WCNOC originally submitted the License Amendment Request (LAR) for the Transition to Westinghouse Core Design and Safety Analysis (CDSA) on August 13, 2013. On June 18, 2014, the LAR for the transition to Westinghouse CDSA was withdrawn. The Nuclear Regulatory Commission (NRC) issued four Requests for Additional Information (RAI) during the December 2013 to April 2014 timeframe. WCNOC has previously responded to two of the four RAls. A response to all applicable RAls has been included in the revised LAR and integrated into the text, where appropriate.
The proposed amendment request would add new Technical Specification (TS) Limiting Condition for Operation (LCO) 3.1.9, "RCS Boron Limitations < 500°F," and revise Safety Limits 2.1.1, "Reactor Core SLs," TS 3.3.1, "Reactor Trip System (RTS) Instrumentation," TS 3.4.1, "RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits," TS 3.7.1, "Main Steam Safety Valves (MSSVs)," and Specification 5.6.5, "CORE OPERATING LIMITS REPORT (COLR)" to replace the existing WCNOC methodology for performing core design, non-loss-of-coolant-accident (non-LOCA) and LOCA safety analyses (for Post-LOCA Subcriticality and Cooling only) with standard Westinghouse developed and Nuclear Regulatory Commission (NRC) approved analysis methodologies.
In addition, the proposed amendment request revises the TS definitions of DOSE EQUIVALENT 1-131, and DOSE EQUIVALENT XE-133, Specification 5.5.12, "Explosive Gas and Storage Tank Radioactivity Monitoring Program," and Specification 5.5.18, "Control Room Envelope Habitability Program," to revise the WCGS licensing basis by adopting the Alternative Source Term (AST) radiological analysis methodology in accordance with 10 CFR 50.67, "Accident source term." This amendment request represents a full scope implementation of the AST as described in NRC Regulatory Guide 1.183, "Alternative Radiological Source Terms~for Evaluating Design Basis Accidents at Nuclear Power Reactors," Revision 0.
P.o. Box 411 I Burlington, KS 66839 I Phone: (620) 364-8831 tk Cl() 1-(/
~D An Equal Opportunity Employer M/F/HCNET
. . - µ (<..r--
'.,._ ET 17-0001
,> Page 2 of 5 The proposed change for full scope implementation of the AST is fully discussed, including the associated TS, TS Bases, and Updated Safety Analysis Report (USAR) markups, in Enclosure IV of this amendment request. These proposed changes are provided in a separate enclosure to allow the implementation of the AST to be reviewed separately from the other changes proposed in this amendment request. Enclosure V is a CD-ROM containing meteorological data used to determine offsite, control room, and technical support center atmospheric dispersion factors.
The transition to Westinghouse Core Design and Safety Analysis methodologies was performed to utilize current methodologies and provide more consistent alignment with the Westinghouse fleet of plants. Additionally, the reanalyzed USAR Chapter 15 accidents affected the associated radioactive steam releases which required the radiological consequence analyses to be updated. The radiological consequence analyses were performed using the updated accident source term consistent with 10 CFR 50.67. Therefore, the interdependent relationships between the reanalyzed USAR Chapter 15 accidents and transients, and radiological consequence analyses, necessitates combining these analyses and calculations into a single license amendment request.
The proposed changes for transitioning to Westinghouse Core Design and Safety Analysis are provided on CD-ROM in Attachments I through V. Attachments I through V provide the Evaluation, proposed TS changes, retyped TS pages, proposed TS Bases changes, and proposed COLR changes, respectively, in support of this amendment request. Attachments IV and V are provided for information only .. Final TS Bases changes will be implemented pursuant to TS 5.5.14, "Technical Specification (TS) Bases Control Program," at the time the amendment is implemented.
Enclosure I is on CD-ROM containing WCAP-17658-NP, Revision 1, "Wolf Creek Generating Station Transition of Methods for Core Design and Safety Analyses - Licensing Report" (Non-Proprietary) to support the proposed changes documented in Attachments I - V described above. Enclosure II is on CD-ROM containing WCAP-18083-P, Revision 0, "Westinghouse Revised Thermal Design Procedure Uncertainty Calculations for the Wolf Creek Generating Station" (Proprietary}, while Enclosure Ill is on CD-ROM containing WCAP-18083-NP, Revision 0, the non-proprietary version of the same report. Enclosure IV, as described above, is on CD-ROM containing a separate section for the proposed AST full scope implementation, including the associated TS, TS Bases, and USAR markups. Enclosure V is a CD-ROM containing meteorological data used to determine offsite, Control Room, and Technical Support Center atmospheric dispersion factors that supports the proposed changes documented in Enclosure IV. Enclosure VI is on CD-ROM containing the Proprietary responses to the NRC's request for additional information (RAI) for the August 2013 submittal, WCNOC Letter ET 13-0023, "License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis." Enclosure VII is on CD-ROM containing the Non-Proprietary responses to the NRC's RAI for the August 2013 submittal, WCNOC Letter ET 13-0023, "License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis." Enclosure VIII is on CD-ROM containing supplemental documents to support the NRC RAI responses in Enclosures VI and VII. Enclosure IX is on CD-ROM containing the Westinghouse Application for Withholding Proprietary Information from Public Disclosure, accompanying Affidavit, Proprietary Information Notice, and Copyright Notice for the information contained in Enclosure II. Likewise, Enclosure X is on CD-ROM containing the Westinghouse Application for Withholding Proprietary Information from Public Disclosure, accompanying Affidavit, Proprietary Information Notice, and Copyright Notice for the information contained in Enclosure VI.
ET 17-0001
. Page 3 of 5 As Enclosures II and VI contain information proprietary to Westinghouse 'Electric Company LLC, it is supported by an affidavit signed by Westinghouse, the owner of the information. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the NRC and addresses with specificity the considerations listed in paragraph (b)(4) of Section 2.390 of the NRC's regulations. Accordingly, it is respectfully requested that the information, which is proprietary to Westinghouse, be withheld from public disclosure in accordance with 10 CFR Section 2.390 of the NRC's regulations.
It has been determined that this amendment application does not involve a significant hazard consideration as determined per 10 CFR 50.92, "Issuance of amendment." Pursuant to 10 CFR 51.22, "Criterion for categorical exclusion; identification of licensing and regulatory actions eligible for categorical exclusion or otherwise not requiring environmental review,"
Section (b}, no environmental impact statement or environmental assessment needs to be prepared in connection with the issuance of this amendment.
The Plant Safety Review Committee reviewed this amendment application. In accordance with 10 CFR 50.91, "Notice for public comment; State consultation," a copy of this amendment application, with attachments, is being provided to the designated Kansas State official.
On August 25, 2016, WCNOC and Westinghouse personnel conducted a follow-up pre-submittal meeting with the NRC staff to discuss the licensee's planned submittal of a license amendment request that proposes (1) a new technical specification for reactor coolant system boron limitations, (2) a revision to the licensing basis by full scope implementation of an alternate source term (AST) in accordance with 10 CFR 50.67, "Accident Source Term," and (3) the transition to Westinghouse core design and safety analysis methodologies for Wolf Creek Generating Station (WCGS).
WCNOC is requesting approval of the proposed license amendment prior to February 23, 2018 allowing implementation during Refueling Outage 22. It is anticipated that the license amendment, as approved, will become effective upon issuance and will be implemented within 90 days of NRC issuance.
--- ---- -~ - ~--
ET 17-0001 Page 4 of 5 There are no regulatory commitments contained in this submittal. If you have any questions concerning this matter, please contact me at (620) 364-4156, or Cynthia R. Hafenstine at (620) 364-4204.
Sincerely, f7~71tr:.
JaimeH. Mei JHM/rlt Attachments: I CD-ROM containing Evaluation II CD-ROM containing Proposed Technical Specification Changes (Mark-up) 111 CD-ROM containing Revised Technical Specification Pages IV CD-ROM containing Proposed TS Bases Changes (for information only) v CD-ROM containing Proposed COLR Changes (for information only)
Enclosures:
CD-ROM containing WCAP-17658-NP, Revision 1, "Wolf Creek Generating Station Transition of Methods for Core Design and Safety Analyses - Licensing Report" (Non-Proprietary)
II CD-ROM containing WCAP-18083-P, Revision 0, "Westinghouse Revised Thermal Design Procedure Uncertainty Calculations for the Wolf Creek Generating Station" (Proprietary) 111 CD-ROM containing WCAP-18083-NP, Revision 0, "Westinghouse Revised Thermal Design Procedure Uncertainty Calculations for the Wolf Creek Generating Station" (Non-Proprietary)
IV CD-ROM containing Full Scope Implementation of Alternative Source Term, Revision 1 (Non-Proprietary) v CD-ROM containing Meteorological Data Used to Determine Offsite, Control Room and TSC Atmospheric Dispersion Factors VI CD-ROM containing Responses to NRC RAls on August 2013 Methodology Transition LAR Submittal (Proprietary)
VII CD-ROM containing Responses to NRC RAls on August 2013 Methodology Transition LAR Submittal (Non-Proprietary)
VIII CD-ROM containing Supplemental Documents to Support NRC RAI Responses IX CD-ROM containing CAW-16-4499, Application for Withholding Proprietary Information from Public Disclosure and Affidavit for Enclosure II "Westinghouse Revised Thermal Design Procedure Uncertainty Calculations for the Wolf Creek Generating Station" (Proprietary)
X CD-ROM containing CAW-16-4500, Application for Withholding Proprietary Information from Public Disclosure and Affidavit for Enclosure VI, "Responses to NRC RAls on August 2013 Methodology Transition LAR Submittal" (Proprietary) cc: K. S. Steves (KDHE), w/a, w/e (Non-Proprietary only)
K. M. Kennedy (NRC), w/a, w/e B. K. Singal (NRC}, w/a, w/e N. H. Taylor (NRC), w/a, w/e Senior Resident Inspector (NRC}, w/a, w/e
ET 17-0001
.. Page 5 of 5 STATE OF KANSAS SS COUNTY OF COFFEY Jaime H. McCoy, of lawful age, being first duly sworn upon oath says that he is Vice President Engineering of Wolf Creek Nuclear Operating Corporation; that he* has read the foregoing document and knows the contents thereof; that he has executed the same for and on behalf of said Corporation with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
H. McCoy
, President Engineering SUBSCRIBED and sworn to before me this (7 1Ji day of Ja*~
T '2017.
GAYLE SHEPHEARD My Appointment Expires July 24, 2019 Expiration Date 1/J.f/;} o /0
Enclosed are two CD-ROMs containing the C!ttachments and enclosures for the Wolf Creek Nuclear Operating Corporation Letter ET 17-0001, "License Amendment Request for the Transition to Westinghouse Core Design and Safety AnalY.sis,:..dated-Januar:y_tz., 2017(:--ln--.,
caccordanee-with-1*0-ePR2~390;-files-007;-01"0, q:Iz.__C!rn:L0-18-are--considered-proprl~!ary_-~:frid***,
~
'tperefore1 warrant wit~_!"lol_Qing_. __ _,,,., ** ---- * - ---*
't -----**-
Contact Name Nicole Good Mailing Address W.olf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 E-mail Address nilyon@wcnoc.com Phone Number 620-364-8831 Ext. 4557 Document Components:
The CD-ROM labelled "License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis" contains the following files:
001_Att 1 Evaluation 142 KB, publicly available 002_Att 2 Proposed TS Changes 3.30 MB, publicly available 003_Att 3 Revised TS Pages 96 KB, publicly available 004_Att 4 Proposed TS Bases Changes 1.63 MB, publicly available 005_Att 5 Proposed COLR Changes
- 1.87 MB, publicly available
- 011_Enc 7 RAI Responses 1.01 MB, publicly available 012_Enc 8 BNL TR A-3788 1.04 MB, publicly available 013_Enc 8 WCAP-13247 1.03 MB, publicly available 014_Enc 8 OG-92-25 477 KB, publicly available 015_Enc 8 CAW-92-287 1.05 MB, publicly available 016_Enc 8 Att to WOG-93-066 335 KB, publicly available 017_Enc 9 CAW-16-4499
- 169 KB, Proprietary 018_Enc 10 CAW-16-4500 173 KB, Proprietary The CD-ROM labelled "Enclosure V- CD-ROM containing Meteorological Data Used to Determine Offsite, Control Room, and TSC Atmospheric Dispersion Factors" contains Meteorological data files.