IR 05000259/2014001

From kanterella
Revision as of 13:54, 14 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Annual Assessment Letter for Browns Ferry Nuclear Plant Units 1, 2 and 3 - NRC Inspection Reports 05000259/2014001, 05000260/2014001 and 05000296/2014001
ML15063A420
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 03/04/2015
From: McCree V M
Region 2 Administrator
To: Shea J W
Tennessee Valley Authority
References
IR 2014001
Download: ML15063A420 (6)


Text

March 4, 2015

Mr. Joseph Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801

SUBJECT: ANNUAL ASSESSMENT LETTER FOR BROWNS FERRY NUCLEAR PLANT UNITS 1, 2 AND 3 - NRC INSPECTION REPORTS 05000259/2014001, 05000260/2014001 AND 05000296/2014001

Dear Mr. Shea:

On February 10, 2015, the NRC completed its end-of-cycle performance review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014, through December 31, 2014. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined the performance at Browns Ferry Units 1, 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. In our mid-cycle assessment letter dated September 2, 2014, (ADAMS Accession No. ML14245A557) we informed you that on July 1, 2014, Browns Ferry Unit 1 transitioned from the Multiple/Repetitive Degraded Cornerstone Column to the Regulatory Response Column, Unit 2 transitioned from the Degraded Cornerstone Column to the Regulatory Response Column, and Unit 3 remained in the Regulatory Response Column of the Action Matrix. On September 5, 2014, the NRC completed a supplemental inspection using Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," for Units 1, 2, and 3. Based on the results of this inspection, as documented in inspection report 05000259/2014012; 05000260/2014012; 05000296/2014012 and assessment follow-up letter (ADAMS Accession No. ML14289A458), the NRC assessed Browns Ferry Units 1, 2, and 3 in the Licensee Response Column beginning October 1, 2014. Since the last performance assessment, all performance indicators have remained within the nominal, expected range (i.e., green) based on your fourth quarter 2014 performance indicator data submission. The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In addition to the ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include: Inspection Procedure (IP) 43004, "Inspection of Commercial-Grade Dedication Programs," IP 71003, "Post-Approval Site Inspection for License Renewal" (Phase 1), and an initial operator license examination. In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact Michael King at (404) 997-4511 with any questions you may have regarding this letter.

Sincerely,/RA/ Victor M. McCree Regional Administrator Docket Nos.: 50-259, 50-260, 50-296 License Nos.: DPR-33, DPR-52, DPR-68

Enclosure:

Browns Ferry Inspection/Activity Plan (03/01/2015 - 06/30/2016) cc Distribution via ListServ

________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE /RA By SRS5/ /RA By MFK1/ /RA By JTM/ /RA By LXW1/ /RA By VMM/ NAME SSandal MKing JMunday LWert VMcCree DATE 2/19/2015 2/19/2015 2/20/2015 2/25/2015 2/25/2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO Letter to Joseph from Victor M. McCree dated March 4, 2015

SUBJECT: ANNUAL ASSESSMENT LETTER FOR BROWNS FERRY NUCLEAR PLANT UNITS 1, 2 AND 3 - NRC INSPECTION REPORTS 05000259/2014001, 05000260/2014001 AND 05000296/2014001 Distribution w/encl: D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrownsFerry Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 203/04/201509:02:29Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteBrowns FerryInspection / Activity Plan03/01/2015-06/30/2016ISI-UNIT 2 IN-SERVICE INSPECTION1 2 IPInservice Inspection Activities - BWR7111108G03/23/201503/27/2015RP-RP OCCUPATIONAL BASELINE WEEK 131,2,3 IPRadiological Hazard Assessment and Exposure Controls71124.0103/23/201503/27/20151,2,3 IPOccupational ALARA Planning and Controls71124.0203/23/201503/27/20151,2,3 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0303/23/201503/27/20151,2,3 IPOccupational Dose Assessment71124.0403/23/201503/27/20151,2,3 IPRadiation Monitoring Instrumentation71124.0503/23/201503/27/20151,2,3 IPPerformance Indicator Verification7115103/23/201503/27/2015RP-RP OCCUPATIONAL BASELINE WEEK 231,2,3 IPRadiological Hazard Assessment and Exposure Controls71124.0104/06/201504/10/20151,2,3 IPOccupational ALARA Planning and Controls71124.0204/06/201504/10/20151,2,3 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0304/06/201504/10/20151,2,3 IPOccupational Dose Assessment71124.0404/06/201504/10/20151,2,3 IPRadiation Monitoring Instrumentation71124.0504/06/201504/10/20151,2,3 IPPerformance Indicator Verification7115104/06/201504/10/2015OL EXAM-INITIAL LICENSE EXAM PREP31 BROWNS FERRY NOVEMBER 2015 INITIAL EXAM AT POWER FACILITIESV2346310/19/201510/23/2015CDBI-COMPONENT DESIGN BASES INSPECTION71,2,3 IPComponent Design Bases Inspection711112110/26/201510/30/20151,2,3 IPComponent Design Bases Inspection711112111/16/201511/20/20151,2,3 IPComponent Design Bases Inspection711112111/30/201512/04/20151,2,3 IPComponent Design Bases Inspection711112112/14/201512/18/2015EP-EP EXERCISE61,2,3 IPEmergency Action Level and Emergency Plan Changes711140411/02/201511/06/20151,2,3 IPExercise Evaluation - Hostile Action (HA) Event711140711/02/201511/06/20151,2,3 IPPerformance Indicator Verification7115111/02/201511/06/2015OL EXAM-INITIAL LICENSE EXAM31 BROWNS FERRY NOVEMBER 2015 INITIAL EXAM AT POWER FACILITIESV2346311/16/201512/04/2015PI&R-PROBLEM IDENTIFICATION AND RESOLUTION41,2,3 IPProblem Identification and Resolution71152B02/08/201602/12/20161,2,3 IPProblem Identification and Resolution71152B02/22/201602/26/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 203/04/201509:02:29Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteBrowns FerryInspection / Activity Plan03/01/2015-06/30/2016RP-RAD HAZARDS ANALYSIS AND TRANSPORTATION21,2,3 IPRadiological Hazard Assessment and Exposure Controls71124.0102/29/201603/04/20161,2,3 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0802/29/201603/04/2016ISI-UNIT 3 IN-SERVICE INSPECTION1 3 IPInservice Inspection Activities - BWR7111108G03/07/201603/11/2016LR-UNIT 3 POST APPROVAL LR PHASE 12 3 IPPost-Approval Site Inspection for License Renewal7100303/07/201603/11/2016TFPI-TRIENNIEL FIRE PROTECTION INSPECTION41,2,3 IPFire Protection [Triennial]7111105T05/02/201605/06/20161,2,3 IPFire Protection [Triennial]7111105T05/16/201605/20/2016EP-EP PROGRAM INSPECTION21,2,3 IPExercise Evaluation711140106/06/201606/10/20161,2,3 IPAlert and Notification System Testing711140206/06/201606/10/20161,2,3 IPEmergency Preparedness Organization Staffing and Augmentation System711140306/06/201606/10/20161,2,3 IPEmergency Action Level and Emergency Plan Changes711140406/06/201606/10/20161,2,3 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140506/06/201606/10/2016RP-RP PUBLIC RAD SAFETY BASELINE21,2,3 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0606/13/201606/17/20161,2,3 IPRadiological Environmental Monitoring Program71124.0706/13/201606/17/20161,2,3 IPPerformance Indicator Verification7115106/13/201606/17/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.