ML14031A412

From kanterella
Jump to navigation Jump to search
U3 2014002 ISI RFI Final - Copy
ML14031A412
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 01/31/2014
From: Omar Lopez-Santiago
NRC/RGN-II/DRS/EB3
To: James Shea
Tennessee Valley Authority
References
Download: ML14031A412 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 31, 2014 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801

SUBJECT:

BROWNS FERRY NUCLEAR PLANT, UNIT 3 - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Shea:

From February 24 - February 28, 2014, the U.S. Nuclear Regulatory Commission (NRC) will perform the baseline inservice inspection (ISI) at the Browns Ferry Nuclear Plant, Unit 3 in accordance with NRC Inspection Procedure 71111.08. Experience has shown that this inspection is resource intensive for both the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group (Section A of the Enclosure) identifies information to be provided prior to the inspection to ensure that the inspectors are adequately prepared. The second group (Section B of the Enclosure) identifies additional information the inspectors will need upon arrival at the site. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Eric Bates of your organization. Our inspection dates are subject to change based on your updated schedule of outage activities. If there are any questions about this inspection, or the material requested, please contact the lead inspector, Michael Coursey, at 404-997-4671 (Michael.Coursey@nrc.gov).

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its Enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's

J. Shea 2 document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, RA Omar Lopez-Santiago, Acting Chief Engineering Branch 3 Division of Reactor Safety Docket No.: 50-296 License No.: DPR-68

Enclosure:

Inservice Inspection Document Request cc: Distribution via ListServ

X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS SIGNATURE RA RA RA NAME M. Coursey R. Williams J Rivera-Ortiz DATE 1/ 23/2014 1/ 23 /2014 1/ 31 /2014 E-MAIL COPY YES NO YES NO YES NO INSERVICE INSPECTION DOCUMENT REQUEST Inspection Dates: February 24 - February 28, 2014 Inspection Procedures: IP 71111.08 Inservice Inspection (ISI) Activities Inspectors: Michael Coursey, Reactor Inspector A. Information Requested for the In-Office Preparation Week The following information should be sent to the Region II office, in hard copy or electronic format, in care of Michael Coursey by February 14, 2014, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspector will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week (Section B of this Enclosure). We ask that the specific items selected from the lists be available and ready for review on the first day of inspection. *Please provide requested documentation electronically, if possible. If requested documents are large and only hard copy formats are available, please inform the inspector, and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the inspector as soon as possible.

A.1 ISI / Welding Programs and Schedule Information a) A detailed schedule (including preliminary dates) of:

i) Nondestructive examinations (NDEs) planned for Class 1 and 2 systems and containment, performed as part of your ASME Section XI, Risk Informed (if applicable), and augmented ISI Programs during the upcoming outage.

Provide a status summary of the NDE inspection activities versus the required inspection period percentages for this Interval by category per ASME Section XI, IW_-2400. (Do not provide separately if other documentation requested contains this information.)

ii) Examinations planned for Alloy 82/182/600 welds/components that are not included in the Section XI scope, if applicable.

iii) Welding activities that are scheduled to be completed during the upcoming outage (e.g., ASME Class 1, 2, or 3 systems or components.

b) A copy of ASME Section XI Code Relief Requests and associated NRC Safety Evaluations applicable to the examinations identified above.

Enclosure

2 c) A list of NDE reports (ultrasonic, radiography, magnetic particle, and dye penetrant) that have identified surface or volumetric indications that were analytically evaluated, and accepted for continued service on Code Class 1, 2, and 3 systems since the beginning of the last refueling outage. This should include the previousSection XI pressure test(s) conducted during start up and any evaluations associated with the results of the pressure tests.

d) A list with a brief description (e.g., system, material, pipe size, weld number, and NDE performed) of the welds in Code Class 1, 2, and 3 systems which have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage, or are planned to be fabricated this refueling outage. Also, please indicate which of those welds are risk significant.

e) If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the upcoming outage, provide a detailed description of the welds to be examined, and the extent of the planned examination. Please also provide reference numbers for applicable procedures that will be used to conduct these examinations.

f) Copy of any 10 CFR Part 21 reports applicable to your systems and components within the scope of Section XI of the ASME Code that have been identified since the beginning of the last refueling outage.

g) A list of any temporary non-code repairs in service (e.g., pinhole leaks).

h) Copies of the most recent self assessments for the ISI and Welding programs.

i) A list with a brief description of ISI related issues (e.g., condition reports) entered into your corrective action program since the beginning of the last refueling outage. For example, a list based upon database searches using keywords such as: ISI, ASME Code,Section XI, NDE, welding, cracks, wear, thinning, leakage, rust, corrosion, or errors in piping examinations.

j) Please provide names and phone numbers for the following program leads:

i) ISI contacts (Examination, planning) ii) Containment Exams iii) Pressure Testing iv) Boiling Water Reactors Vessel Internals Project (BWRVIP) v) Snubbers and Supports vi) Repair and Replacement Program Manager vii) Licensing Contact viii) Site Welding Engineer Enclosure

3 B. Information to be provided onsite to the inspector at the entrance meeting (February 24, 2014):

B.1 ISI / Welding Programs and Schedule Information a) Updated schedules for ISI/NDE activities, planned welding activities, and schedule showing contingency repair plans, if available.

b) For ASME Class 1, 2 and 3 welds selected by the inspector from the lists provided from Section A of this enclosure, please provide copies of the following documentation for each subject weld:

i) Weld data sheet (traveler) ii) Weld configuration and system location iii) Applicable Code Edition and Addenda for weldment iv) Applicable Code Edition and Addenda for welding procedures v) Applicable weld procedures (WPS) used to fabricate the welds vi) Copies of procedure qualification records (PQRs) supporting the WPS from B.1.b.v vii) Copies of mechanical test reports identified in the PQRs above viii) Copies of the nonconformance reports for the selected welds (If applicable) ix) Radiographs of the selected welds and access to equipment to allow viewing radiographs (If RT was performed) x) Copies of the preservice examination records for the selected welds xi) Copies of welder performance qualifications records applicable to WPS, including documentation that welder maintained proficiency in the applicable welding processes specified in the WPS (At least six months prior to date subject work) xii) Copies of NDE personnel qualifications (VT, PT, UT, RT) As applicable c) For the ISI related corrective action issues selected by the inspector from Section A of this Enclosure, provide a copy of the corrective actions and supporting documentation.

d) For the NDE reports with recordable indications on Code Class 1, 2 and 3 systems selected by the inspector from Section A above, provide a copy of the examination records, examiner qualification records, and associated corrective action documents.

Enclosure

4 e) A copy of (or ready access to) the most current revision of the ISI Program Manual and Plan for the current Interval.

f) For the NDEs selected by the inspector from Section A of this Enclosure, provide copy of the NDE procedures used to perform the examinations (including calibration and flaw characterization/sizing procedures). For ultrasonic examination procedures qualified in accordance with ASME Code,Section XI, Appendix VIII, provide documentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets). Also, include documentation of the specific equipment to be used (e.g., ultrasonic unit, cables, and transducers including serial numbers), and NDE personnel qualification records.

g) Ready access to (i.e., copies provided to the inspector for use during the onsite inspection, or room number and location where available) applicable editions of the ASME Code (Sections V, IX, and XI) for the inservice inspection, repair/replacement programs, and BWRVIP documents.

Inspector Contact Information: Mailing Address:

Michael Coursey US NRC Region 2 Reactor Inspector Attn: Michael Coursey 404-997-4671 245 Peachtree Center Ave, NE Michael.Coursey@nrc.gov Suite 1200, Atlanta, GA 30303 Enclosure