Inspection/Activity Plan, 30/01/2012 - 06/01/2013, RPT 22
ML12066A060
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 03/05/2012
From:
NRC/RGN-II
To:
Tennessee Valley Authority
References
IR-11-007
Download: ML12066A060 (2)


Text

Page 1 of 2 Browns Ferry 03/05/2012 08:56:17 Inspection I Activity Plan Report 22 03/0112012 - 0610112013 Unit Planned Dates fff*

Number Start End ir Inspection Aivity onSite PSBI-RP - RP RAD HAZARD ASSESSMENT I 1,2,3 04/09/2012 04/13/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls EB3 IS! - UNIT 3 INSERVICE INSPECTION I 3 04/16/2012 04/20/2012 IP 7111108G Inservice Inspection Activities - BWR OL EXAM - INITIAL EXAM PREP 3 1 04/16/2012 04/20/2012 V23370 BROWNS FERRY / MAY 2012 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM WEEK I 3

1 05/07/2012 05/11/2012 V23370 BROWNS FERRY / MAY 2012 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM WEEK 2 3

1 05/14/2012 05/19/2012 V23370 BROWNS FERRY / MAY 2012 EXAM AT POWER FACILITIES PSBIEP - EMERGENCY PREPAREDNESS INSPECTION 2 1,2,3 06/25/2012 06/29/2012 IP 7111402 Alert and Notification System Testing 1,2,3 06/25(2012 06/29/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1,2,3 06/25/2012 06/29/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1,2,3 06/25/2012 06/29/2012 P 71151 Performance Indicator Verification PSBI-RP - PUBLIC RADIATION PROTECTION BASELINE 4 1,2,3 06)18)2012 06)22/2012 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1,2,3 06/18/20 12 06/22/2012 IP 71124.07 Radiological Environmental Monitoring Program 1,2,3 06/18/2012 06/22/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1,2,3 06/1 8/2012 06/22/2012 IP 71151 Performance Indicator Verification OL RQ - REQUAL INSPECTION 2 1,2,3 10/08/2012 10/12/2012 IP 7111111B Licensed OperatorRequalification Program EB3 ISI - UNIT I INSERVICE INSPECTION 1 10/29/2012 11/02/2012 IP 7111108G Inservice Inspection Activities - BWR EB3 LR - UNIT I POST APPROVAL LR - PHASE I 2 1 10/29/2012 11/02(2012 IP 71003 Post-Approval Site Inspection for License Renewal CDBI - COMPONENT DESIGN BASES INSPECTION 5 1,2,3 01(28(2013 02/01/2013 IP 7111121 Component Design Bases Inspection 1,2,3 02/11/2013 02/15/2013 IP 7111121 Component Design Bases Inspection 1,2,3 02/25/2013 03/01/2013 IP 7111121 Component Design Bases Inspection IS - UNIT 2 INSERVICE INSPECTION I 2 03/25/2013 03/29/2013 IP 7111108G Inservice Inspection Activities - BWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

1

Page 2 of 2 Browns Ferry 03105/2012 08:56:17 Inspection I Activity Plan Report 22 0310112012 - 0610112013 Unit Planned Dates 1 No. of Staff Number Start End inspeiion Title -

on Site LR7I 003 UNIT 2 POST APPROVAL LIC RENEWAL-PHASE I 2

2 04/01/2013 04/05/2013 IP 71003 Post-Approval Site Inspection for License Renewal PSBI -RP - RP OCCUPATIONAL BASELINE 3 12,3 04/01/2013 04/05/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1,2,3 04/01/2013 04/05/2013 IP 71124.02 Occupational ALARA Planning and Controls 1,2,3 04/01/2013 04/05/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1,2,3 04/01/2013 04105/2013 IP 71124.04 Occupational Dose Assessment 1,2,3 04/01/2013 04/05/2013 IP 71124.05 Radiation Monitoring Instrumentation 1,2,3 04/01/2013 04/05/2013 IP 71151 Performance Indicator Verification PSBI -RP - RP OCCUPATIONAL BASELINE WEEK 2 4 1,2,3 04/15/2013 04/19/2013 P 71124.01 Radiological Hazard Assessment and Exposure Controls 1,2,3 04/15/2013 04/19/2013 IP 71124.02 Occupational ALARA Planning and Controls 1,2,3 04/15/2013 04/19/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1,2,3 04)15/2013 04/19/2013 IP 71124.04 Occupational Dose Assessment 1,2,3 04/15/2013 04/19/2013 IP 71124.05 Radiation Monitoring Instrumentation 1,2,3 04/15/2013 04/19/2013 IP 71151 Performance Indicator Verification LR7I 003 UNIT I POST APPROVAL LIC RENEWAL-PHASE 2 5

1 05/06/2013 05/10/2013 IP 71003 Post-Approval Site Inspection for License Renewal 1 05/20/2013 05/24/2013 IP 71003 Post-Approval Site Inspection for License Renewal OL EXAM - INITIAL EXAM PREP 3 1 05/13/2013 05/17/2013 V23394 BROWNS FERRY/JUNE 2013 INITIAL EXAM AT POWER FACILITIES TI-I 82 - TI-I 82 BURIED PIPING/TANK PHASE I -

I 1,2,3 05/13/2013 05/17/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

I