IR 05000259/2014001

From kanterella
(Redirected from IR 05000296/2014001)
Jump to navigation Jump to search
Annual Assessment Letter for Browns Ferry Nuclear Plant Units 1, 2 and 3 - NRC Inspection Reports 05000259/2014001, 05000260/2014001 and 05000296/2014001
ML15063A420
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 03/04/2015
From: Mccree V
Region 2 Administrator
To: James Shea
Tennessee Valley Authority
References
IR 2014001
Download: ML15063A420 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION rch 4, 2015

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR BROWNS FERRY NUCLEAR PLANT UNITS 1, 2 AND 3 - NRC INSPECTION REPORTS 05000259/2014001, 05000260/2014001 AND 05000296/2014001

Dear Mr. Shea:

On February 10, 2015, the NRC completed its end-of-cycle performance review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014, through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined the performance at Browns Ferry Units 1, 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

In our mid-cycle assessment letter dated September 2, 2014, (ADAMS Accession No.

ML14245A557) we informed you that on July 1, 2014, Browns Ferry Unit 1 transitioned from the Multiple/Repetitive Degraded Cornerstone Column to the Regulatory Response Column, Unit 2 transitioned from the Degraded Cornerstone Column to the Regulatory Response Column, and Unit 3 remained in the Regulatory Response Column of the Action Matrix. On September 5, 2014, the NRC completed a supplemental inspection using Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, for Units 1, 2, and 3. Based on the results of this inspection, as documented in inspection report 05000259/2014012; 05000260/2014012; 05000296/2014012 and assessment follow-up letter (ADAMS Accession No. ML14289A458), the NRC assessed Browns Ferry Units 1, 2, and 3 in the Licensee Response Column beginning October 1, 2014.

Since the last performance assessment, all performance indicators have remained within the nominal, expected range (i.e., green) based on your fourth quarter 2014 performance indicator data submission.

The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In addition to the ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include: Inspection Procedure (IP) 43004, Inspection of Commercial-Grade Dedication Programs, IP 71003, Post-Approval Site Inspection for License Renewal (Phase 1), and an initial operator license examination.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Michael King at (404) 997-4511 with any questions you may have regarding this letter.

Sincerely,

/RA/

Victor M. McCree Regional Administrator Docket Nos.: 50-259, 50-260, 50-296 License Nos.: DPR-33, DPR-52, DPR-68 Enclosure: Browns Ferry Inspection/Activity Plan (03/01/2015 - 06/30/2016)

cc Distribution via ListServ

________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE /RA By SRS5/ /RA By MFK1/ /RA By JTM/ /RA By LXW1/ /RA By VMM/

NAME SSandal MKing JMunday LWert VMcCree DATE 2/19/2015 2/19/2015 2/20/2015 2/25/2015 2/25/2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO Letter to Joseph from Victor M. McCree dated March 4, 2015 SUBJECT: ANNUAL ASSESSMENT LETTER FOR BROWNS FERRY NUCLEAR PLANT UNITS 1, 2 AND 3 - NRC INSPECTION REPORTS 05000259/2014001, 05000260/2014001 AND 05000296/2014001 Distribution w/encl:

D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrownsFerry Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 2 Browns Ferry 03/04/2015 09:02:29 Inspection / Activity Plan Report 22 03/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 03/23/2015 03/27/2015 IP 7111108G Inservice Inspection Activities - BWR RP - RP OCCUPATIONAL BASELINE WEEK 1 3 1, 2, 3 03/23/2015 03/27/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2, 3 03/23/2015 03/27/2015 IP 71124.02 Occupational ALARA Planning and Controls 1, 2, 3 03/23/2015 03/27/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2, 3 03/23/2015 03/27/2015 IP 71124.04 Occupational Dose Assessment 1, 2, 3 03/23/2015 03/27/2015 IP 71124.05 Radiation Monitoring Instrumentation 1, 2, 3 03/23/2015 03/27/2015 IP 71151 Performance Indicator Verification RP - RP OCCUPATIONAL BASELINE WEEK 2 3 1, 2, 3 04/06/2015 04/10/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2, 3 04/06/2015 04/10/2015 IP 71124.02 Occupational ALARA Planning and Controls 1, 2, 3 04/06/2015 04/10/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2, 3 04/06/2015 04/10/2015 IP 71124.04 Occupational Dose Assessment 1, 2, 3 04/06/2015 04/10/2015 IP 71124.05 Radiation Monitoring Instrumentation 1, 2, 3 04/06/2015 04/10/2015 IP 71151 Performance Indicator Verification OL EXAM - INITIAL LICENSE EXAM PREP 3 1 10/19/2015 10/23/2015 V23463 BROWNS FERRY NOVEMBER 2015 INITIAL EXAM AT POWER FACILITIES CDBI - COMPONENT DESIGN BASES INSPECTION 7 1, 2, 3 10/26/2015 10/30/2015 IP 7111121 Component Design Bases Inspection 1, 2, 3 11/16/2015 11/20/2015 IP 7111121 Component Design Bases Inspection 1, 2, 3 11/30/2015 12/04/2015 IP 7111121 Component Design Bases Inspection 1, 2, 3 12/14/2015 12/18/2015 IP 7111121 Component Design Bases Inspection EP - EP EXERCISE 6 1, 2, 3 11/02/2015 11/06/2015 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2, 3 11/02/2015 11/06/2015 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event 1, 2, 3 11/02/2015 11/06/2015 IP 71151 Performance Indicator Verification OL EXAM - INITIAL LICENSE EXAM 3 1 11/16/2015 12/04/2015 V23463 BROWNS FERRY NOVEMBER 2015 INITIAL EXAM AT POWER FACILITIES PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2, 3 02/08/2016 02/12/2016 IP 71152B Problem Identification and Resolution 1, 2, 3 02/22/2016 02/26/2016 IP 71152B Problem Identification and Resolution This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Browns Ferry 03/04/2015 09:02:29 Inspection / Activity Plan Report 22 03/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RP - RAD HAZARDS ANALYSIS AND TRANSPORTATION 2 1, 2, 3 02/29/2016 03/04/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2, 3 02/29/2016 03/04/2016 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation ISI - UNIT 3 IN-SERVICE INSPECTION 1 3 03/07/2016 03/11/2016 IP 7111108G Inservice Inspection Activities - BWR LR - UNIT 3 POST APPROVAL LR PHASE 1 2 3 03/07/2016 03/11/2016 IP 71003 Post-Approval Site Inspection for License Renewal TFPI - TRIENNIEL FIRE PROTECTION INSPECTION 4 1, 2, 3 05/02/2016 05/06/2016 IP 7111105T Fire Protection [Triennial]

1, 2, 3 05/16/2016 05/20/2016 IP 7111105T Fire Protection [Triennial]

EP - EP PROGRAM INSPECTION 2 1, 2, 3 06/06/2016 06/10/2016 IP 7111401 Exercise Evaluation 1, 2, 3 06/06/2016 06/10/2016 IP 7111402 Alert and Notification System Testing 1, 2, 3 06/06/2016 06/10/2016 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2, 3 06/06/2016 06/10/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2, 3 06/06/2016 06/10/2016 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies RP - RP PUBLIC RAD SAFETY BASELINE 2 1, 2, 3 06/13/2016 06/17/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2, 3 06/13/2016 06/17/2016 IP 71124.07 Radiological Environmental Monitoring Program 1, 2, 3 06/13/2016 06/17/2016 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.