UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 22, 2013 Mr. J. W. Shea Manager, Corporate Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 4B-C Chattanooga, TN 37402-
SUBJECT:
BROWNS FERRY NUCLEAR PLANT - EMERGENCY PREPAREDNESS INSPECTION NOTIFICATION AND REQUEST FOR INFORMATION
Dear Mr. Shea:
During the week of June 3-7, 2013, the U.S. Nuclear Regulatory Commission (NRC) will perform a baseline Emergency Preparedness Inspection at the Browns Ferry Nuclear Plant, (NRC Inspection Procedures 71114.01 and 71151). In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this activity. Prior to the on-site inspection period, inspectors will review the proposed exercise scenario using IP 71114.08.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Steve Austin of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Mark Speck at (404) 997-4759 (Mark.Speck@nrc.gov) or the Chief of Plant Support Branch 1, Brian Bonser at (404) 997-4653.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers 3150-0044, 3150-0014, 3150-0011, and 3150-0008. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its Enclosure will be available electronically for public inspection in the NRC Public Document
J. Shea 2
Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-259, 50-260, and 50-296 License No.: DPR-33, DPR-52, and DPR-68
Enclosure:
Pre-Inspection Document List cc: (See page 3)
ML13084A005 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII: DRS RII: DRS SIGNATURE
/RA by ANielsen for/
/RA by ANielsen for/
NAME MSPECK BBONSER DATE 3/22/2013 3/22/2013 3/ /2013 3/ /2013 3/ /2013 3/ /2013 3/ /2013 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
J. Shea 3
cc:
K. J. Polson Site Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution S. M. Bono Plant Manager Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution James E. Emens Manager, Licensing Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution E. W. Cobey Manager, Corporate Licensing Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution T. A. Hess Program Manager Corporate Licensing Tennessee Valley Authority Electronic Mail Distribution Edward J. Vigluicci Associate General Counsel, Nuclear Tennessee Valley Authority Electronic Mail Distribution Chairman Limestone County Commission 310 West Washington Street Athens, AL 35611 State Health Officer Alabama Dept. of Public Health P.O. Box 303017 Montgomery, AL 36130-3017 Senior Resident Inspector U.S. Nuclear Regulatory Commission Browns Ferry Nuclear Plant 10833 Shaw Road Athens, AL 35611-6970
Enclosure Pre-Inspection Document List Inspection Dates:
June 3-7, 2013 Inspection Procedures:
71114.01 Exercise Evaluation 71151 Performance Indicator Verification Drill/Exercise Performance ERO Drill Participation Alert and Notification System Reliability Note: This is a list of the documents to be delivered to the NRC Region II Office (Attention:
Mark Speck, 245 Peachtree Center Avenue, NE, Suite 1200, Atlanta, GA 30303-1257) and provided to the inspection team upon arrival. The first three items under EP1 are requested as early as practical to support the pre-exercise scenario review. The current version of these documents is expected unless specified otherwise. Electronic media is preferred if readily available (The preferred file format is Word, or searchable.pdf files on CDROM). Note that the inspectors cannot accept data provided on USB or flash drives due to NRC IT security policies. Please organize the information as it is arranged below to the extent possible. If there are questions regarding the documents requested, please do not hesitate to contact the lead inspector.
EP1 Exercise Evaluation Current exercise package: scenario timeline, expected Drill and Exercise Performance opportunities, exercise objectives, radiological assumptions, and scope of play and participation Completed IP 71114.08 Scenario Review Checklist, if performed Previous two exercise packages: scenario timelines, drill reports or assessments, and respective Final FEMA/ DHS exercise reports Drill and exercise related procedures Core damage assessment procedure Dose assessment procedure Special/emergency exposure procedure Potassium Iodide distribution procedure Assembly/accountability procedure Emergency Facility Activation procedures All drill reports within inspection period Corrective action program entries related to the exercises and drills for the two year inspection period EP01/EP02/EP03 Performance Indicators (PI) Verification Governing document for the performance indicator process Drill and Exercise Performance (DEP), Emergency Response Organization (ERO), and Alert and Notification System (ANS) PI data submitted for the two year inspection period DEP documentation and evaluations for the two year inspection period Current ERO roster Corrective action program entries related to performance indicators (i.e DEP, ERO training and participation, and ANS) for the two year inspection period
2 Miscellaneous Procedures Current Emergency Plan and Emergency Action Levels Safety Evaluation Report approved Emergency Plan and Emergency Action Levels Current Emergency Plan implementing procedures Corrective Action Program procedures