ML17236A197

From kanterella
Jump to navigation Jump to search
Updated Inspection Plan
ML17236A197
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/24/2017
From: Alan Blamey
Reactor Projects Region 2 Branch 6
To: James Shea
Tennessee Valley Authority
References
Download: ML17236A197 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 August 24, 2017 Mr. Joseph W. Shea Site Vice President, Nuclear Regulatory Affairs and Support Services Tennessee Valley Authority 1101 Market Street, LP 3R-C Chattanooga, TN 37402-2801

SUBJECT:

UPDATED INSPECTION PLAN FOR BROWNS FERRY NUCLEAR PLANT UNITS 1, 2 AND 3 (REPORTS 05000259, 05000260, 05000296/2017005)

Dear Mr. Shea:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for the Browns Ferry Nuclear Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

J. Shea 2 Please contact me at (404) 997-4415 with any questions you have regarding this letter.

Sincerely,

/RA/

Alan Blamey, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-259, 50-260, 50-296 License Nos.: DPR-33, DPR-52, DPR-68

Enclosure:

Browns Ferry Inspection/Activity Plan (09/01/2017- 06/30/2019) cc Distribution via ListServ

J. Shea 3

SUBJECT:

UPDATED INSPECTION PLAN FOR BROWNS FERRY NUCLEAR PLANT UNITS 1, 2 AND 3 (REPORTS 05000259, 05000260, 05000296/2017005)

August 24, 2017 DISTRIBUTION:

M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrownsFerryResource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

ADAMS Accession Number: ML17236A197 OFFICE RII:DRP NAME ABlamey DATE 8/24/2017 OFFICIAL AGENCY RECORD

Page 1 of 2 Browns Ferry 08/17/2017 10:12:40 Inspection / Activity Plan Report 22 09/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site MODS - PLANT MODIFICATIONS INSPECTION 4 1, 2, 3 12/04/2017 12/08/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments EPU - EROSION AND FLOW ACC COROSION PROGRAMS 1 1, 2, 3 01/22/2018 01/26/2018 IP 49001 Inspection Of Erosion-Corrosion/Flow-Accelerated-Corrosion Monitoring Programs 1, 2, 3 01/22/2018 01/26/2018 IP 71004 Power Uprate ISI - UNIT 3 IN-SERVICE INSPECTION 1 3 02/26/2018 03/02/2018 IP 7111108G Inservice Inspection Activities - BWR RP - RAD HAZARDS AND TRANSPORTATION 2 1, 2, 3 03/05/2018 03/09/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2, 3 03/05/2018 03/09/2018 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation DBAI - DESIGN BASES ASSURANCE INSPECTION (TEAM) 6 1, 2, 3 04/09/2018 04/13/2018 IP 7111121M Design Bases Assurance Inspection (Teams) 1, 2, 3 04/30/2018 05/04/2018 IP 7111121M Design Bases Assurance Inspection (Teams) 1, 2, 3 05/14/2018 05/18/2018 IP 7111121M Design Bases Assurance Inspection (Teams)

EP - EP PROGRAM INSPECTION 3 1, 2, 3 04/16/2018 04/20/2018 IP 7111402 Alert and Notification System Testing 1, 2, 3 04/16/2018 04/20/2018 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2, 3 04/16/2018 04/20/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2, 3 04/16/2018 04/20/2018 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2, 3 04/16/2018 04/20/2018 IP 71151 Performance Indicator Verification OL EXAM - INITIAL LICENSE EXAM PREP 3 1 06/18/2018 06/22/2018 V23515 BROWNS FERRY / JULY 2018 INITIAL EXAM AT POWER FACILITES RP - RP PUBLIC INSPECTION 2 1, 2, 3 06/18/2018 06/22/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2, 3 06/18/2018 06/22/2018 IP 71124.07 Radiological Environmental Monitoring Program 1, 2, 3 06/18/2018 06/22/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2, 3 06/18/2018 06/22/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences OL EXAM - INITIAL LICENSE EXAM 3 1 07/16/2018 08/03/2018 V23515 BROWNS FERRY / JULY 2018 INITIAL EXAM AT POWER FACILITES PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2, 3 08/06/2018 08/10/2018 IP 71152B Problem Identification and Resolution 1, 2, 3 08/20/2018 08/24/2018 IP 71152B Problem Identification and Resolution This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 Browns Ferry 08/17/2017 10:12:40 Inspection / Activity Plan Report 22 09/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL RQ - REQUAL INSPECTION 2 1, 2, 3 09/10/2018 09/14/2018 IP 7111111B Licensed Operator Requalification Program ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 10/22/2018 10/26/2018 IP 7111108G Inservice Inspection Activities - BWR TFPI - BROWNS FERRY NFPA 805 3 1, 2, 3 02/11/2019 02/15/2019 IP 7111105X Fire Protection - NFPA 805 (Triennial) 1, 2, 3 03/04/2019 03/08/2019 IP 7111105X Fire Protection - NFPA 805 (Triennial)

ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 03/11/2019 03/15/2019 IP 7111108G Inservice Inspection Activities - BWR RP - RP OCCUPATIONAL WEEK 1 3 1, 2, 3 03/11/2019 03/15/2019 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2, 3 03/11/2019 03/15/2019 IP 71124.02 Occupational ALARA Planning and Controls 1, 2, 3 03/11/2019 03/15/2019 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2, 3 03/11/2019 03/15/2019 IP 71124.04 Occupational Dose Assessment 1, 2, 3 03/11/2019 03/15/2019 IP 71124.05 Radiation Monitoring Instrumentation 1, 2, 3 03/11/2019 03/15/2019 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2, 3 03/11/2019 03/15/2019 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences RP - RP OCCUPATIONAL WEEK 2 2 1, 2, 3 03/25/2019 03/29/2019 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2, 3 03/25/2019 03/29/2019 IP 71124.02 Occupational ALARA Planning and Controls 1, 2, 3 03/25/2019 03/29/2019 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2, 3 03/25/2019 03/29/2019 IP 71124.04 Occupational Dose Assessment 1, 2, 3 03/25/2019 03/29/2019 IP 71124.05 Radiation Monitoring Instrumentation 1, 2, 3 03/25/2019 03/29/2019 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2, 3 03/25/2019 03/29/2019 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences EP - EP EXERCISE INSPECTION 6 1, 2, 3 06/24/2019 06/28/2019 IP 7111401 Exercise Evaluation 1, 2, 3 06/24/2019 06/28/2019 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2, 3 06/24/2019 06/28/2019 IP 7111408 Exercise Evaluation - Scenario Review 1, 2, 3 06/24/2019 06/28/2019 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.