Shield Building
From kanterella
Revision as of 10:14, 29 May 2018 by
StriderTol
(
talk
|
contribs
)
(Created page with " {{system-Nav}}")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation
Jump to search
v
t
e
System
Automatic Depressurization System
Auxiliary Building Gas Treatment System
Auxiliary Feedwater
Circulating Water System
Containment Spray
Control Rod
Control Room Emergency Air Temperature Control System
Control Room Emergency Filtration System
Control Room Emergency Ventilation
Control Room Emergency Ventilation Air Supply
Control Room Envelope
Core Spray
Core Standby Cooling System
Cresent Area Ventilation and Cooling
Critical Function Monitoring System
Decay Heat Removal
Drywell Continuous Atmospheric Monitor
Electrohydraulic Control
Emergency Cooling Tower
Emergency Core Cooling System
Emergency Diesel Generator
Emergency Equipment Cooling Water
Emergency Feedwater Actuation System
Emergency Feedwater Initiation and Control
Emergency Feedwater System
Emergency Gas Treatment System
Emergency Response Data System
Extraction steam
Feedwater
Fuel Pool Cooling and Cleanup
HVAC
High Pressure Coolant Injection
High Pressure Core Spray
Intermediate Range Monitor
Low Pressure Coolant Injection
Low Pressure Cooling Injection
Main Condenser
Main Steam
Main Steam Isolation Valve
Main Steam Line
Main Steam Safety Valve
Main Transformer
Main Turbine
Main Turbine Bypass System
Mechanical Pressure Regulator
Moisture Separator Reheater
Permanent Magnet Generator
Post Accident Monitoring
Primary Containment Isolation System
Primary containment
[ENS]
|
[LER]
|
[Findings]
Site
Start date
Title
Description
ML25268A141
99900003
26 September 2025
Public - Final Safety Evaluation for GE-Hitachi Licensing Topical Report NEDC-33926P, Revision 3 BWRX-300 Steel-Plate Composite Containment Vessel and Reactor Building Structural Design
ML25258A011
18 September 2025
AP1000 White Paper for September 18, 2025 ROP Public Meeting
ML25118A330
Technical Specifications Task Force
15 September 2025
Draft Traveler SE of TSTF-602, Revise the Ventilation Filter Testing Program to Permit Alternate Challenge Agents
ML25247A259
Technical Specifications Task Force
8 September 2025
Final Traveler SE of TSTF-601 (ML25247A259)
ML25247A258
Technical Specifications Task Force
8 September 2025
TSTF-601 Cover Letter for Final Traveler SE (ML25247A258)
ML25261A269
3 September 2025
Transcript of the Advisory Committee on Reactor Safeguards 728th Full Committee Meeting, September 3, 2025 Pages 1-157 (Open)
ML25225A243
Prairie Island
25 August 2025
Amendment to Adopt TSTF-541
IR 05000390/2025002
Watts Bar
13 August 2025
Integrated Inspection Report 05000390/2025002 and 05000391/2025002
... further results
Category
:
System
Navigation menu
Personal tools
Create account
Log in
Namespaces
Page
Discussion
English
Views
Read
View source
View history
More
Search
Navigation
Main page
Recent changes
Random page
Community
Help
Patreon
Databases
ENS
LER
Findings
Inspections
TSTF
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
Browse properties