ML16256A128

From kanterella
Revision as of 05:03, 19 May 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.6
ML16256A128
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/25/2016
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16256A115 List: ... further results
References
W3F1-2016-0053
Download: ML16256A128 (6)


Text

WSES-FSAR-UNIT-31.6-11.6MATERIAL INCORPORATED BY REFERENCEThe following topical reports are incorporated by reference.ReportFSARNumberAuthor and TitleDate to NRCSectionCENPD-26Combustion Engineering, Inc.August 19713.6, 6.2(with Suppl."Description of Combustion 1 through 5)Engineering Loss of CoolantCalculational Procedures"CENPD-42Combustion Engineering, Inc.August 19723.6"Dynamic Analysis of Reactor Vessel Internals Under Loss of Coolant Accident Conditions with Application to C-E 800 Mwe Class Reactors"CENPD-67Combustion Engineering, Inc.September 197310.3(with Suppl."Iodine Decontamination 1 and 2 andFactors During PWR Steam Addenda 1Generation and Steam Venting" and 2)CENPD-87"Safety Related Research Development1.5for CE PWRs, Program Summaries"CENPD-98Combustion Engineering, Inc.July 19734.4, 15.0"Coast Code Description"CENPD-105Combustion Engineering, Inc.June 19734.3"Fast Neutron Attenuation by the ANISN-SHADRAC AnalyticalMethod"CENPD-107Combustion Engineering, Inc.August 197415.0(with Suppl."CESEC" 1 through 4)CENPD-118Combustion Engineering, Inc.September 19744.3"Densification of CombustionEngineering Fuel"CENPD-132Combustion Engineering, Inc.September 19746.2, 15.6(with Suppl."Calculative Methods for the6.3 1 and 2)C-E Large Break LOCAEvaluation Model" WSES-FSAR-UNIT-31.6-2Revision 11-A (02/02)ReportFSARNumberAuthor and TitleDate to NRCSectionCENPD-133Combustion Engineering, Inc.September 19746.2, 15.6(with"CEFLASH-4A Fortran IV6.3Suppl. 2)Digital Computer Programfor Reactor Blowdown Analysis"CENPD-134Combustion Engineering, Inc.September 19746.2, 15.6(with"COMPERC-II A Program for6.3Suppl. 1)Emergency Refill-Reflood ofthe Core"CENPD-135Combustion Engineering, Inc.September 19744.2, 6.3,(with"STRIKIN-II A Cylindrical15.6Suppl.Geometry Fuel Rod Heat2 and 4)Transfer Program"CENPD-136Combustion Engineering, Inc.September 19744.2, 15.6"High Temperature Properties of Zircaloy and UO2, for usein LOCA Evaluation Model"CENPD-137Combustion Engineering, Inc.September 19746.3, 15.6(with"Calculative Methods for theSuppl. 1)C-E Small Break LOCAEvaluation Model"(DRN 01-758)CENPD-138"PARCH, A FORTAN IV Digital ProgramFebruary 197515.6to Evaluate Pool Boiling, Axial Rod andCoolant Heatup" (with Supplement 1)(DRN 01-758)CENPD-139Combustion Engineering, Inc.September 19744.1, 4.2,(with"C-E Fuel Evaluation Model"4.3, 6.3Suppl. 1)CENPD-145Combustion Engineering, Inc.April 19754.3, 7.7"A Method of Analyzing In-Core Detector Data inPower Reactors"CENPD-148Combustion Engineering, Inc.November 19744.6"Review of Reactor Shutdown System (PPS Design) forCommon Mode FailureSusceptibility"CENPD-153Combustion Engineering, Inc.August 19744.3"Evaluation Uncertainty in the Nuclear Form Factor WSES-FSAR-UNIT-3ReportFSARNumberAuthor and TitleDate to NRCSection1.6-3CENPD-153Measured by Self Powered(cont)Fixed In-Core DetectorSystems"CENPD-155Combustion Engineering, Inc.October 19745.3"C-E Procedure for Design, Fabrication, Installation and Inspection of Surveillance Specimen Brackets Attached toReactor Vessel Beltline Region"CENPD-161Combustion Engineering, Inc,June 19754.1, 4.2,"TORC - A Computer Code for4.4, 15.0 Determining the Thermal Marginof a Reactor Core"CENPD-162Combustion Engineering, Inc.May 19754.4(with"CHF Correlation for C-E FuelSuppl. 1)Assemblies with StandardSpacer Grids - Part 1; Uniform Axial Power Distribution"CENPD-168Combustion Engineering, Inc.September 19763.6, 6.2Rev. 1"Design Basis Pipe Breaksfor the Combustion Engineering Two Loop Reactor Coolant System"CENPD-169Combustion Engineering, Inc.August 19754.3, 7.2"Assessment of the Accuracy7.7 of PWR Operating Limits as Determined by Core Operating Limit SupervisorySystem"CENPD-170Combustion Engineering, Inc.August 19757.2"Assessment of the Accuracy of the PWR Safety System Actuation as Performed by the Core Protection Calculators"CENPD-178PCombustion Engineering, Inc.October 19763.9, 4.2and 178"Structural Analysis of the16 x 16 Fuel Assembly for Combined Seismic and Loss-of-Coolant-Accident Loadings" WSES-FSAR-UNIT-3ReportFSARNumberAuthor and TitleDate to NRCSection1.6-4CENPD-179Combustion Engineering, Inc.April 19764.2"C-E Thermo-Structural Fuel Evaluation Method"CENPD-183Combustion Engineering, Inc.August 197515.0"C-E Methods for Loss of15.3 Flow Analysis"CENPD-187Combustion Engineering, Inc.October 19754.2(with"Method of Analyzing CreepSuppl. 1)Collapse of Oval Cladding"CENPD-190Combustion Engineering, Inc.January 197615.4"C-E Method for Control Element Assembly Ejection Analysis"CENPD-198PCombustion Engineering, Inc.December 19754.2and 198"Zircaloy Growth-In-ReactorDimensional Changes in Zircaloy-4 Fuel Assemblies"CENPD-206Combustion Engineering, Inc.December 19764.4"Comparison of TORC Code Predictions with Experimental Data"CENPD-207Combustion Engineering, Inc.June 19764.4"Critical Heat Flux Corre-lation for C-E Fuel Assemblies with Standard Spacer Grids, Part 2, Non-Uniform Axial PowerDistributions"CENPD-213Combustion Engineering, Inc.February 19766.3, 15.6"Application of FLECHT Reflood Heat Transfer Coefficients to Combustion Engineering 16 x 16 Fuel Bundles"CENPD-225PCombustion Engineering, Inc.October 19764.2, 4.4and 225"Fuel and Poison Rod Bowing"CENPD-252"Method for the Analysis of BlowdownJuly 19793.9E WSES-FSAR-UNIT-3 1.6-5 Revision 304 (06/10) Report Number Author and Title Date to NRC FSAR Section WCAP 7709-L Electric Hydrogen Recombiners for PWR Containments April 1972 6.2.5 (DRN 03-2054, R14) CEN-367-A Combustion Engineering, Inc. Leak-Before-Break of Primary Coolant Loop Piping in Combustion Engineering Designed Nuclear Steam Supply System February 1991 3.6 (DRN 03-2054, R14) (EC-13881, R304) WCAP-11596-P-A Westinghouse Electric Company, Qualification of the PHOENIX -

P/ANC Nuclear Design System for Pressurized Water Reactor Cores June 1988 4.2, 4.3A, 15.1 WCAP-10965-P-A Westinghouse Electric Company, ANC: A Westinghouse Advanced Nodal Computer Code September 1986 4.2, 4.3A, 15.1 WCAP-10965-P-A Addendum 1 Westinghouse Electric Company, ANC: A Westinghouse Advanced Nodal Computer Code:

Enhancements to ANC Rod Power Recovery April 1989 4.2, 4.3A, 15.1 WCAP-16045-P-A Westinghouse Electric Company, Qualification of the Two-Dimensional Transport Code PARAGON, August 2004 4.3A WCAP-16072-P-A Westinghouse Electric Company, Implementation of Zirconium Diboride Burnable Absorber Coatings in CE Nuclear Power Fuel Assembly Designs August 2004 4.2, 4.3A CENPD-404-P-A Combustion Engineering, Inc., Implementation of ZIRLO Material Cladding in CE Nuclear Power Fuel Assembly Designs, November 2001 4.2, 4.3A, 15.0 WCAP-16500-P-A Westinghouse Electric Company, CE 16 x 16 Next Generation Fuel Core Reference Report, August 2007 4.2, 4.3A WCAP-12610-P-A and CENPD-404-P-A Addendum 1-A Westinghouse Electric Company, Optimized ZIRLOTM, July 2006 4.2, 4.3A, 15.0 EC-13881, R304)

WSES-FSAR-UNIT-3 1.6-6 Revision 305 (11/11) (EC-13881, R304) Report Number Author and Title Date to NRC FSAR Section WCAP-16523-P-A Westinghouse Electric Company, "Westinghouse Correlations WSSV and WSSV-T for Predicting Critical Heat Flux in Rod Bundles with Side-Supported Mixing Vanes,"

August 2007 4.4, 15.0, 15.1, 15.2, 15.3, 15.4 CENPD-387-P-A Combustion Engineering, Inc., "ABB Critical Heat Flux Correlations for PWR Fuel,"

May 2000 4.3A, 15.0 WCAP-15996-P-A, Rev. 1 Westinghouse Electric Company, "Technical Manual for the CENTS Code,"

March 2005 15.0, 15.1, 15.2, 15.3, 15.4 CEN-356(V)-P-A, Revision 01-P-A Combustion Engineering, Inc.,

"Modified Statistical Combination of Uncertainties, May 1988 4.2, 4.3A (EC-13881, R304) (EC-19087, R305) WCAP-17817-P Technical Justification for Eliminating Pressurizer Surge Line Rupture as the Structural Design Basis for Waterford Steam Electric Station, Unit 3 Using Leak-Before-Break Methdology February 2010 3.6.3 (EC-19087, R305)