Letter Sequence Request |
|---|
TAC:ME2731, Clarify Application of Setpoint Methodology for LSSS Functions (Withdrawn, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance...
- Supplement, Supplement, Supplement
Results
Other: CNL-14-077, Responses to Degraded Voltage Issue Requests for Additional Information, ML101050203, ML102240630, ML102290358, ML102290360, ML102290361, ML102290362, ML102290363, ML102290364, ML102290365, ML102290366, ML102290367, ML102290368, ML102290383, ML102290384, ML102290385, ML102290386, ML102290387, ML102290388, ML102290389, ML102290390, ML102290391, ML102290392, ML102290403, ML102290404, ML102290405, ML102290406, ML102290407, ML102290408, ML102290409, ML102290410, ML102290411, ML102290414, ML102290439, ML102290440, ML102290441, ML102290442, ML102290443, ML102290444, ML102290445, ML102290446, ML102290447, ML102290448, ML102290458, ML102290459, ML102290460, ML102290461, ML102290462, ML102290463, ML102290464... further results
|
MONTHYEARML0933702752009-11-24024 November 2009 Final Safety Analysis Report, Amendment 95, Cover Letter Project stage: Request ML12192A3682009-12-0909 December 2009 Tennessee Department of Health Public Health Assessment 2009 Project stage: Request ML1001916862010-01-11011 January 2010 Final Safety Analysis Report, Amendment 97, Section 8 - Electric Power Through 8E-12 Project stage: Request ML1001914212010-01-11011 January 2010 Final Safety Analysis Report, Amendment 97 Project stage: Request ML1002204742010-02-0505 February 2010 IP 37002, Construction Refurbishment Process - Watts Bar Unit 2 Project stage: Request ML1005500072010-03-11011 March 2010 Request for Additional Information Related to Licensees Final Safety Analysis Report Amendment 95 Related to Section 4.2.2, Reactor Vessel Internal Components Project stage: RAI ML1007100112010-03-12012 March 2010 OL - List of Documents for Docketing Referenced on Page 5 of the Site Audit Trip Report Project stage: Request ML1010502032010-04-0808 April 2010 Additional Information Regarding Final Safety Analysis Report, Chapter 7, Instrumentation and Controls Review - Requested Common Q Proprietary Documents Project stage: Other ML1010405732010-04-0909 April 2010 Response to NRC Request for Additional Information Regarding Licensees Final Safety Analysis Report (FSAR) Amendment Related to Section 4.2.2, Reactor Vessel Internal Components Project stage: Response to RAI ML1011701022010-04-27027 April 2010 Notice of Meeting with Tennessee Valley Authority to Discuss Watts Bar Nuclear Plant, Unit 2, Final Safety Analysis Report Submittals Project stage: Request ML1011303512010-05-0505 May 2010 Request for Withholding Information from Public Disclosure (Tac No. ME2731) Project stage: Withholding Request Acceptance ML1016102902010-05-27027 May 2010 Transmittal of Amendment 99 to Final Safety Analysis Report (FSAR) Project stage: Request ML1016203602010-06-17017 June 2010 Notice of Forthcoming Meeting with Tennessee Valley Authority (TVA) to Discuss the Complete Status of TVA Hydrology Issues Including the Flooding Effects on the TVA Operating Nuclear Plants Project stage: Request ML1014500842010-06-23023 June 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Reactor Systems, Nuclear Performance and Code Review, Ansd Plant Systems Project stage: RAI ML1015402502010-06-24024 June 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Nuclear Performance and Code Review, Plant Systems, and Testing (Tac Nos. ME2731 and ME3091) Project stage: RAI ML1017903992010-06-28028 June 2010 Request for Additional Information (RAI) Regarding Licensees Final Safety Analysis Report Amendment Related to Section 4.2.2, Reactor Vessel Internal Components Project stage: Request ML1016200062010-06-29029 June 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Nuclear Performance and Code Review (Tac No. ME2731) Project stage: RAI ML1015304742010-07-0202 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Mechanical and Civil Engineering Systems Project stage: RAI ML1016000262010-07-0808 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report, Amendment Related to Quality and Vendor Branch Review Project stage: RAI ML1015303542010-07-12012 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Electrical Engineering Systems Project stage: RAI ML1018001562010-07-15015 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Chapter 8, Electric Power Project stage: RAI ML1020202812010-07-30030 July 2010 Request for Additional Information Regarding Licensees Final Safety Analysis Report Amendment Related to Chapter 3.11 Project stage: RAI ML1023003322010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-9 (Dwg No. 1-47W611-67-5, R10) Project stage: Other ML1022904662010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-3 (Dwg No. 1-47W845-3, R23) Project stage: Other ML1023003332010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-10 (Dwg No. 1-47W610-67-1, R27) Project stage: Other ML1023003342010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-10 Sh a (Dwg No. 1-47W610-67-1A, R16) Project stage: Other ML1023003352010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-11 (Dwg No. 1-47W610-67-2, R15) Project stage: Other ML1023003432010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-12 Sh a (Dwg No. 1-47W610-67-3A, R7) Project stage: Other ML1023003442010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-13 (Dwg No. 1-47W610-67-4, R17) Project stage: Other ML1023003452010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-11 Sh a (Dwg No. 1-47W610-67-2A, R8) Project stage: Other ML1023003462010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-12 (Dwg No. 1-47W610-67-3, R12) Project stage: Other ML1023003472010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-14 (Dwg No. 1-47W610-67-5, R14) Project stage: Other ML1023003482010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-14 (Dwg No. 1-47W610-67-5A, R2) Project stage: Other ML1023003492010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-16 (Dwg No. 1-47W859-4, R23) Project stage: Other ML1023003502010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-17 (Dwg No. 1-47W859-3, R18) Project stage: Other ML1023003512010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-18 (Dwg No. 1-47W859-2, R36) Project stage: Other ML1023003522010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-19 (Dwg No. 1-47W859-1, R47) Project stage: Other ML1023003602010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-23 (Dwg No. 1-47W611-70-1, R9) Project stage: Other ML1023003612010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-20 (Dwg No. 1-47W610-70-1, R23) Project stage: Other ML1023003622010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-21 (Dwg No. 1-47W610-70-2, R29) Project stage: Other ML1023003632010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-21A (Dwg No. 1-47W610-70-2A, R15) Project stage: Other ML1023003642010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-22 (Dwg No. 1-47W610-70-3, R17) Project stage: Other ML1023003652010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-24 (Dwg No. 1-47W611-70-2, R11) Project stage: Other ML1023003672010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-25 (Dwg No. 1-47W611-70-3, R4) Project stage: Other ML1023003682010-08-0505 August 2010 Final Safety Analysis Report Figure 9.2-25A (Dwg No. 1-47W611-70-4, R4) Project stage: Other ML1023003692010-08-0505 August 2010 Final Safety Analysis Report Figure 9.3-1 (Dwg No. 1-47W610-32-1, R15) Project stage: Other ML1023003702010-08-0505 August 2010 Final Safety Analysis Report Figure 9.3-2 (Dwg No. 1-47W610-32-2, R19) Project stage: Other ML1023003732010-08-0505 August 2010 Final Safety Analysis Report Figure 9.3-6 (Dwg No. 1-47W848-1, R24) Project stage: Other ML1022903682010-08-0505 August 2010 Final Safety Analysis Report Figure 8.3-14B (Dwg No. 1-45W760-82-1, R17) Project stage: Other ML1022903652010-08-0505 August 2010 Final Safety Analysis Report Figure 8.3-7 (Dwg No. 1-45W760-211-9, R16) Project stage: Other 2010-05-05
[Table View] |
Text
1 WBN2Public Resource From:
Boyd, Desiree L [dlboyd@tva.gov]
Sent:
Monday, October 03, 2011 9:40 AM To:
Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc:
Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Boyd, Desiree L
Subject:
NRC PM Open Items List 10-4-11.docx Attachments:
NRC PM Open Items List 10-4-11.docx For next phone call.
Thank You,
~*~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764
Hearing Identifier:
Watts_Bar_2_Operating_LA_Public Email Number:
533 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF23B39AC1)
Subject:
NRC PM Open Items List 10-4-11.docx Sent Date:
10/3/2011 9:40:26 AM Received Date:
10/3/2011 9:40:30 AM From:
Boyd, Desiree L Created By:
dlboyd@tva.gov Recipients:
"Arent, Gordon" <garent@tva.gov>
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>
Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>
Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>
Tracking Status: None Post Office:
TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 264 10/3/2011 9:40:30 AM NRC PM Open Items List 10-4-11.docx 33217 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
Page 1 of 4 NRC PM Open Items List 10/4/11 (423) 751-7777 ID 4233652004#
No.
Description Status Additional Comments Resp Org/Person
- 1.
Cyber Security Plan/Controls and Implementation NRC TI issued TBD NRC Table Top/Pilot Nov. 2011 Procedures complete 9/30/11 Pre-inspection TBD Inspection Dec 2011 NRC Inspection in 2011 To be discussed at the next ACRS meeting (October 5th - closed portion).
Heinrich/Snyder (Bryan)
Page 2 of 4 No.
Description Status Additional Comments Resp Org/Person
- 2.
Instrumentation RAI List (Knuettel)
- 1. GA/ESI is preparing a report to document the conformance of their CGD program to NRC requirements based on NRC telecom on 8/30/11.
Draft scheduled for 9/9 is now TBD.
- 2. Updates based on schedule received from GA on 09/07/11 following conference call on document schedule.
- 3. Revise GA-ESI procedure for CGI dedication to address NRC comments.
- 4. Draft received for review 9/20/11.
- 5. Non-props & affidavits
- 6. WEC to provide demarcated proprietary, non-proprietary and affidavits for withholding for each item.
- 7. WEC to revise figure to remove connection from OM to printer to complete commitment.
- 8. WEC to agreed to produce a test report for the incore IITA.
- 9. WEC has the necessary documentation. WEC to produce a non-proprietary summary report and place the test reports in the WEC Rockville office for NRC audit.
- 10. Submit I&C update letter
- 1. 9/29/11
- 2. Various -
see status
- 3. 9/26/11A
- 4. 10/4/11
- 5. 11/18/11
- 6. Various -
see status
- 7. 10/24/11
- 8. TBD
- 9. 10/10/11
- 10. 10/14/11
- 1. Draft response received and comments sent to GA.
- 2. 04038903-1SP: 9/30/11 04038903-2SP: 10/6/11 04038903-4SP: 10/21/11 04038903-QSR: 9/30/11 Non-props and affidavits due 11/18/11
- 3. OP-7.3-240: Complete
- 4. Create new bridge document 04038800-1SP:
10/4/11
- 5. Provide NRC non-prop and affidavit for all remaining documents
- 6. WEC to provide the following documents:
CN-EQT-10-44: 11/9/11 DAR-ME-09-10: 10/11/11 EQ-EV-62-WBT: 11/16/11 EQLR-171: 11/30/11 EQ-QR-33-WBT: 11/9/11 EQ-QR-64-GEN: 11/16/11 WNA-SD-00250-WBT: 11/2/11 WNA-SD-00248-WBT: 11/2/11 WNA-TP-02988-WBT: 10/26/11 WNA-VR-00279-WBT: 10/26/11 WNA-PT-00138-WBT: Complete
- 7. WNA-AR-00189-WBT:10/24/11
- 8. IITA In-core EQ report
- 9. MI cable 600V test report Produce non-prop summary document
- 10. Next I&C submittal update Eng/Hilmes (Smith)
- 3.
Exemption to 10CFR50.49 for some Category II cables?
10/31/11 Determine if exemption required. Check SSER 24.
NRC may need to establish a license condition.
Hilmes (Stockton)
Page 3 of 4 No.
Description Status Additional Comments Resp Org/Person
- 4.
Complete Implementation (Hemmer)
Pump Relocation 5/30/12 Bldg Plan 10/31/11 Inspection -
June 2012 Phase I commitments 10/7/11 Additional clarification to Phase I actions will be needed. Fleet wide issue.
Substantial building to complete and equipment in May.
Provide document of mitigating equipment and location for unit 2.
Hemmer (Smith)
- 5.
Fire Protection Report Questions regarding OMA
- 1. 10/24-28/11 2.9/30/11A 3.9/30/11A
- 4. 11/4/11
- 5. 11/30/11
- 6. 9/30/11A
- 7. TBD
- 1. Audit
- 2. Group 7 RAI response
- 3. Receive Group 8 RAIs - if needed
- 4. Response to Group 8
- 5. Submit As-designed U1/U2 FPR
- 6. Fire Protection Program Audit Frequency - add to group 7 response
- 7. Follow-up meeting ENG/Hilmes (Arent)
- 6.
Tech Spec Revisions from latest T/S markup and NRC Review comments
- 1. 10/14/11
- 2. 10/14/11
- 3. 10/21/11
- 4. 10/21/11
- 1. CSST A & B - discretionary
- 2. I-131 DEI
- 3. Diesel Generator Frequency
- 4. Unit 1 AST FHA Licensing/Elton (Bryan)
- 7.
ACRS Topics 10/5/11 Cyber, Chapter 15 except dose, Chapter 4 (Fuels),
WINCISE, Hydrology, process for FSAR drawing documentation update, Gordon
- 8.
SSER 22/23/24 Open Items Response 10/31/11 10/31 is the target date for the next SSER update.
The expanded HH list and status is covered periodically.
Licensing
- 9.
Transient Analysis issues Boron dilution RAI response 10/7/11 Question on RG revision and modes 3, 4, & 5. TVA to provide write-up explaining NRC acceptance (CLB) of unit 1 for modes 3, 4, & 5. See SSER OI 132.
ENG/Koontz WEC/Morgan
- 10.
FSAR A107 10/31/11 Current target date for A107 is 10/31/11.
Lic/Stockton
Page 4 of 4 No.
Description Status Additional Comments Resp Org/Person
- 11.
Develop list of planned License Conditions, Exemptions and Relief Requests (Arent)
- 1. 11/1/11
- 2. TBD
- 3. TBD
- 1. Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0
- 2. NRR to review current exemptions
- 3. Verify required notifications made NRR/TVA (Bryan)
- 12.
Verify Tech Spec Setpoints match calcs TS certification
- 1. 10/18/11
- 2. Feb 2012
- 1. 3 SSDs remaining to be issued. Possible submittal if any number changes.
- 2. TS certification Eng/Hilmes (Bryan)
- 13.
Issue two Unit Offsite Dose Calculation Manual (Beach) Review TS Chapter 5 programs also 3/1/12 Determine actual need date Chemistry/
Woods (Bryan)
- 14.
Issue Unit 2 Completion Letter (Arent) 8/1/12 Licensing
- 15.
Submit final as-constructed FSAR figures 7/1/12 Licensing/
Stockton
- 16.
TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.
Licensing (Gordon)
- 17.
ASME N-801 & N-802 code cases 11/30/11 NRC response to relief request submitted 9/1/11.
NRR
- 18.
ASME Section III N-3 reports 8/2012
- 19.
Provide list of community leaders for NRC to send request for environmental reviews 9/26/11A Get list from public affairs Gordon
- 0.
Discretionary Actions
- 1.
Letter to terminate Part 30/40 License after receipt of Part 50 License 4/1/12 Licensing (Arent)
- 2.
Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing
- 3.
Status of GSI 199 Eastern Seismicity (Arent)
Fall 2011 No action pending upcoming Generic Letter Related information on GSI 194 may need input TVA/NRR
- 4.
Letter to notify NRC when Vital Area Boundary returned to original location Jan. 2012 Security Plan Update - Boundary to be restored.
Lic/Arent
- 5.
IEB 88-02 SG Tube Cracking TBD Tubes are assumed locked in the WEC analysis.
Waiting for NRC concurrence. When will the WEC analysis be submitted? NRC willing to review as a contingency.
Corp SG/
Webber ISI/Tinley