Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24022A259 | 22 January 2024 | NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Revise TS LCO 3.8.2 to Remove Note C-S Diesel Generator | |
ML24016A076 | 16 January 2024 | NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Request to Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications | |
ML23347A064 | 13 December 2023 | 12-13-23 Email from Kimberly Green to Wells, Russell, Subject: Results of NRC SUNSI Review of Watts Bar Nuclear Plant Dual-Unit UFSAR, Amendment 5 | |
ML23334A093 | 28 November 2023 | NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate During Mode 6 | |
ML23319A166 | 2 November 2023 | NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) | Exemption Request |
ML23254A287 | 11 September 2023 | NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Table 1.1-1 Re Number of Required Rvh Closure Bolts | |
ML23236A256 | 24 August 2023 | NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) | |
ML23191A867 | 10 July 2023 | NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control | |
ML23166A114 | 15 June 2023 | Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 | Offsite Dose Calculation Manual |
ML23150A247 | 25 May 2023 | NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods | Pressure and Temperature Limits Report |
ML23116A149 | 21 April 2023 | NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods | Pressure and Temperature Limits Report |
ML23075A003 | 13 March 2023 | NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1, 2, and 3, License Amendment Request to Revise TS 3.7.11, Required Actions A.1 and E.1 Footnotes Re Date for the Modification | |
ML23072A072 | 10 March 2023 | NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) | |
ML23067A237 | 8 March 2023 | WB_2023-02_RP_inspection_doc_request | Offsite Dose Calculation Manual |
ML23013A038 | 12 January 2023 | NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) | |
ML23013A036 | 12 January 2023 | NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) | Pressure Boundary Leakage |
ML22356A298 | 22 December 2022 | Email Response to Letter, Dated November 22, 2022 Regarding Watts Bar Integrated Inspection Report | |
ML22353A081 | 15 December 2022 | NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Alternative Request WBN-2-ISI-01 Regarding Examination of Upper Head Injection Nozzle Dissimilar Metal Piping Butt Welds | |
ML22348A097 | 14 December 2022 | NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) | |
ML22348A044 | 13 December 2022 | NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) | Pressure Boundary Leakage |
ML22343A069 | 8 December 2022 | NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) | Anticipated operational occurrence |
ML22227A071 | 15 August 2022 | NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 (EPID L-2022-LLA-0103) - Corrected | |
ML22227A026 | 12 August 2022 | NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 | |
ML22227A027 | 11 August 2022 | NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 | |
ML22215A275 | 3 August 2022 | NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 | Pressure Boundary Leakage |
ML22194A876 | 13 July 2022 | NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-529 | |
ML22166A429 | 6 June 2022 | NRR E-mail Capture - LAR to Adopt TSTF-577 | |
ML22146A334 | 25 May 2022 | NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Relief Requests (EPID L-2022-LLR-0045 - 0047) | |
ML22136A018 | 16 May 2022 | NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, Alternative Request RP-11 and Watts Bar Nuclear Plant, Units 1 and 2, Alternative Request IST-RR-9 | |
ML22144A100 | 12 May 2022 | NRR E-mail Capture - Request for Additional Information Related to Tva'S Request to Revised the TVA Plants' Radiological Emergency Plans | Operating Basis Earthquake |
ML22123A181 | 3 May 2022 | NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-577 | |
ML22115A140 | 25 April 2022 | NRR E-mail Capture - Requests for Confirmation of Information and Additional Information Regarding Watts Bar Nuclear Plant, Unit 2 Exemption Request Re 10 CFR Part 26 (L-2022-LLE-0017) | Exemption Request |
ML22083A237 | 24 March 2022 | NRR E-mail Capture - Request for Additional Information and Confirmation of Information Related to Tva'S Request for Changes to Watts Bar Nuclear Plant, Units 1 and 2, Technical Specification 3.7.8 | Ultimate heat sink |
ML22081A222 | 22 March 2022 | NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 1, License Amendment Request to Revise Allowable Value for TS Table 3.3.2-1, Function 6.e(1) | |
ML22056A380 | 25 February 2022 | Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2022-02 | Process Control Program |
ML22131A190 | 23 February 2022 | NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Request to Revise the Reactor Vessel Surveillance Capsule Withdrawal Schedule | |
ML22046A039 | 15 February 2022 | NRR E-mail Capture - Request for Confirmation of Information Regarding the Watts Bar Nuclear Plant, Unit 2, Cycle 4 Mid-Cycle Outage Generic Letter 95-05 Final Report | |
ML22038A188 | 4 February 2022 | NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Revise the TVA Radiological Emergency Plan | |
ML22018A027 | 18 January 2022 | 2022 All RFI Responses - Exercise and Program Inspections - Revl | |
ML22011A038 | 10 January 2022 | NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-205-A, Rev. 3 and TSTF-563-A | Surveillance Frequency Control Program |
ML21306A245 | 2 November 2021 | NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.7.8, Essential Raw Cooling Water (ERCW) System | Ultimate heat sink |
ML21267A139 | 23 September 2021 | Document Request for Upcoming RP Inspection at Watts Bar | Offsite Dose Calculation Manual |
ML21252A091 | 9 September 2021 | NRR E-mail Capture - Request for Comments on Proposed Issuance of Amendments to Watts Bar Nuclear Plant, Unit 2 - Revise Steam Generator Secondary Side Water Level | High Radiation Area Post Accident Monitoring Probabilistic Risk Assessment Cyber Security Surveillance Frequency Control Program Tornado Missile Risk Evaluator Exemption Request COVID-19 |
ML21223A259 | 11 August 2021 | Affidavit - Prop Slides - Partially Closed Meeting with TVA Potential Watts Bar, Unit 2 Tube Locking LAR | |
ML21221A260 | 9 August 2021 | NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise Watts Bar, Unit 1 Tech Specs Related to Continuous Opening of the Auxiliary Building Secondary Containment Enclosure Boundary | |
ML21215A115 | 26 July 2021 | NRR E-mail Capture - (External_Sender) Correction to WBN Chiller Replacement LAR | |
ML21215A114 | 26 July 2021 | NRR E-mail Capture - (External_Sender) Correction to WBN Chiller Replacement LAR | |
ML21197A045 | 15 July 2021 | WBN U1 Isi/Sgisi Request for Information (RFI) Letter | Boric Acid Non-Destructive Examination Nondestructive Examination Incorporated by reference Liquid penetrant |
ML21193A242 | 12 July 2021 | NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise the Watts Bar Nuclear Plant, Unit 2 Technical Specifications Related to Steam Generator Inspection/Repair Program Provisions | |
ML21189A020 | 29 June 2021 | NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specifications 3.3.6 and 3.3.7 Re Radiation Monitor Redundant Unit of Measure |