IR 05000324/2018010

From kanterella
Revision as of 22:11, 14 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Brunswick Steam Electric Plant - NRC Team Inspection Report 05000325/2018010 and 05000324/2018010
ML18071A151
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/12/2018
From: Sandal S R
Reactor Projects Region 2 Branch 6
To: Gideon W R
Progress Energy Carolinas
References
IR 2018010
Download: ML18071A151 (12)


Text

March 12, 2018

William Site Vice President Brunswick Steam Electric Plant 8470 River Rd. SE (M/C BNP001) Southport, NC 28461

SUBJECT: BRUNSWICK STEAM ELECTRIC PLANT - NRC TEAM INSPECTION REPORT 05000325/2018010 AND 05000324/2018010

Dear Mr. Gideon:

On February 1, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Brunswick Steam Electric Plant, Units 1 and 2 facilities. The NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

The inspection examined activities conducted under your license as they relate to the implementation of mitigation strategies and spent fuel pool instrumentation orders (EA-12-049 and EA-12-051) and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans, your compliance with the Commission's rules and regulations, and with the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel.

The NRC inspectors did not identify any finding or violation of more than minor significance. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."

Sincerely,/RA/

Shane Sandal, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-325, 50-324 License Nos.: DPR-71, DPR-62

Enclosure:

IR 05000325, 324/2018010

cc Distribution via ListServ