October 2, 2018
SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT - CYBER SECURITY INSPECTION REPORT 05000325/2018411 and 05000324/2018411
Dear Mr. Gideon:
On August 23, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Brunswick Steam Electric Plant, Units 1 and 2. The NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report
NRC inspectors documented 1 finding of very low safety significance (Green) in this report.
This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; and the NRC Resident Inspector at Brunswick Steam Electric Plant.
(In addition, if you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report), you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC, 20555-0001; with copies to the Regional Administrator, Region II, and the NRC Resident Inspector at Brunswick Steam Electric Plant.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding. However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA/
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety
Docket Nos.: 50-325 and 50-324 License Nos.: DPR-71, DPR-62
Enclosure:
Inspection Report 05000325/2018411 and 05000324/2018411
cc: See page 3 cc Lee Grzeck Manager, Nuclear Regulatory Affairs Brunswick Steam Electric Plant P.O. Box 10429 (M/C BNP04)
Southport, NC 28461-0429
Scott D. West Director-Nuclear Plant Security Brunswick Steam Electric Plant P.O. Box 10429 Southport, NC 28461
Mr. Edward T. ONeil General Manager, Nuclear Protective Services Duke Energy Corporation 526 South Church Street (M/C EC5ZD)
Charlotte, NC 28202
________________
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS
SIGNATURE PJB4 EMAIL DWS5 EMAIL SMS
NAME BRAATEN STRICKLAND SHAEFFER
DATE 10/2/2018 10/2/2018 10/2/2018
E-MAIL COPY?
YES NO YES NO
YES NO YES NO YES NO YES NO YES