ML20117F935

From kanterella
Revision as of 21:48, 12 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Application for Amend to Licenses DPR-77 & DPR-79,revising Tech Specs to Require That Acoustic Monitoring Sys Be Considered as One of Two Required Valve Position Indication Channels for Pressurizer PORVs & Safety Valves.Fee Paid
ML20117F935
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/06/1985
From: Damer J
TENNESSEE VALLEY AUTHORITY
To: Adensam E
Office of Nuclear Reactor Regulation
Shared Package
ML20117F939 List:
References
NUDOCS 8505130364
Download: ML20117F935 (4)


Text

(- -

-- a

. TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 374ot 400 C.nestnut Street Tower II May 6,'1985 TVA SQN TS 63 Director of Nuclear Reacts > Regulation Attention:

Ms. E. Adensam, Chief Licensing Branch No. 4 Division of Licensing U.S. Nuclear Regulatory Commission

-Washington, D.C.

20555

Dear Ms. Adensam:

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 In accordance with 10 CFR Part 50.90, we are enclosing 40 copies of a requested amendment to licenses DPR-77 and DPR-79, to change the technical specifications of Sequoyah Nuclear Plant units 1 and 2.

The proposed changes are provided in enclosure 1.

This proposed change requires the acoustic monitoring system to be considered one of the two required valve position indication channels for the pressurizer power operated relief valves and the safety valves. The justification for the proposed technical specification changes is provided in enclosure 2.

Enclosed is a check for the $150 amendment application fee required by 10 CFR 170.12.

This requested amendment has been evaluated pursuant to 10 CFR 50.92 and no significant hazards considerations are involved.

If you have any questions concerning this matter, please get in touch with Jerry Wills at FTS 858-2683 Very truly yours, j.4.LVALLEYAUTHORITY TENNESSE a

. A. Domer, Chief Nuclear Licensing Branch this(()gandsubsc,rf d before me Sworn t t

day of W 1985 Notary Public f

b My Commission Expires "8/

0\\

A Enclosures 0

h cc: See page 2 g

N 8505130364 850506 PDR ADOCK 05000327 P

PDR An Equal Opportunity Employer

m q

N t

4 '

I Director of Nuclear Reactor Regulation May 6, 1985 cc:

U.S. Nuclear Regulatory Commission (Enclosures)

Region II Attn:

Dr. J. Nelson Grace, Regional Administrator 101 Marietta Street, NW, Suite _2900 Atlanta, Georgia 30323

-Mr. Michael H. Mobley, Director-Division of Radiological Health T.E.R.R.A. Building 150 9th Avenue North Nashville, Tennessee 37203 l

L:

P e

ENCLOSURE 1 PROPOSED TECHNICAL SPECIFICATIONS SEQUOYAH NUCLEAR PLANT (TVA SQN TS 63) l l

l L

g..

a e

PROPOSED CHANGES UNIT 1

.