Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy Tennessee 37379-2000 August 21,1996 TVA-SON-TS-96-06 10 CFR 50.90 i
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SON) - TECHNICAL SPECIFICATION (TS)
CHANGE 96-06," DELETION OF SURVEILLANCE REQUIREMENT 4.8.1.1.1.b" In accordance with 10 CFR 50.90, we are enclosing an amendment to Licenses DPR-77 and DPR-79 to change the TSs of SON Units 1 and 2. The proposed change removes the Surveillance Requirement 4.8.1.1.1.b that verifies the ability to transfer the unit power supply from the unit generator supported circuit to the preferred power circuit. The current SON design and operating configurations do not require the use of this transfer feature making this surveil!ance unnecessary.
I The proposed TS change is identified in Enclosure 1. The justification for the proposed TS change is provided in Enclosure 2. A proposed determination of no significant hazards consideration performed pursuant to 10 CFR 50.92 is provided in
,. Enclosure 4 provides the revised TS pages as illustrated in Enclosure 1.
j l
To maximize the outage related benefits associated with the proposed TS change, TVA requests approval of this change prior to the Unit 1 Cycle 8 refueling outage scheduled for March 1997. TVA requests a 45-day implementation period for this TS change following issuance.
TVA also requests that the proposed TS change be considered as a CBLA (Cost Beneficial Licensee Action) item. It is estimated that approximately 100 manhours are kf expended each refueling outage to perform the subject surveillance. Based on this
/
estimate, the proposed change is expected to save TVA over $140,000 over the life M.y of the plant.
i 9608290252 960821 PDR ADOCK 05000's27 -
p PDR
F.
l t
U.S. Nuclear Regulatory Commission Page 2 August 21,1996 i
i Please direct questions concerning this issue to Keith Weller at (423) 843-7527.
Sincerely, l
A 4
)
J. D. Smith Acting Manager SON Site Licensing Sworn to and subscribed before me this J/ # day of A d
1996
.h N $ W
/
N tary Public My Commission Expires h J/./99#
Enclosures cc: See page 3 I
c i
U.S. Nuclear Regulatory Commission Page 3 August 21,1996
)
(Enclosures):
l Mr. R. W. Hernan, Project Manager Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Mr. Michael H. Mobley, Director (w/o Enclosures)
Division of Radiological Health 3rd Floor L & C Annex 401 Church Street Nashville, Tennessee 37243-1532 NRC Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 l
<