Text

  • e Tennessee Valley Authority, Post Office Box 2000, Soddy uaisy, Tennessee 37379-2000 September 20,1996 TVA-SON-TS-96-09 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SON) - TECHNICAL SPECIFICATION (TS)

CHANGE 96-09,

  • CLARIFICATION OF WORK SHIFT DURATIONS FOR OVERTIME LIMITS" l in accordance with 10 CFR 50.90, we are enclosing an amendment to Licenses DPR-77 l and DPR-79 to change the TSs of SON Units 1 and 2. The proposed change clarifies 1 the types of work shifts that are acceptable when considering the requirements to  !

ensure heavy use of overtime is not used routinely by unit staff. The current "8-hour l day" criteria in Section 6.2.2.g will be expanded to include 10- and 12-hour I allowances. In addition, the "40-hour week" criteria will be changed to a " nominal 40-hour week" to provide the necessary flexibility associated with the use of the proposed shift durations.

The proposed TS change is identified in Enclosure 1. The justification for the proposed TS change is provided in Enclosure 2. A proposed determination of no significant hazards consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3.

Enclosure 4 provides the revised TS pages as illustrated in Enclosure 1.

TVA requests a 45-day implementation period for this TS change following issuance.

i 94 .270036 960920 PDd ADOCK0500g7 l

270021 NI i

l

_ ..m _. _ _ _ . __. _ _ - . _ . . . _ _ _ _ . _ . . . _ _ _ _ _ . . . _

. - U.S. Nuclear Regulatory Commission Page 2 September 20,1996 e

' Please direct questions concerning this issue to Keith Weller at (423) 843-7527.

l Sincerely, f .

R. H. Shell l Manager SON Site Licensing

,IMOd to Swern day and of subscribed before7mM IM7 W & V 1996 LDA Y Notar'y'Public dl 2)2' My Commission Expires / /

Enclosures cc: See page 3

U.S. Nuclear Regulatory Commission Page 3 September 20,1996 (Enclosures):

Mr. R. W. Hernan, Project Manager Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Mr. Michael H. Mobley, Director (w/o Enclosures)

Division of Radiological Health 3rd Floor L & C Annex 401 Church Street Nashville, Tennessee 37243-1532 NRC Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission j Region ll i 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 l

l

- -.6 O

O p.

l l

ENCLOSURE 1 . !

PROPOSED TECHNICAL SPECIFICATION (TS) CHANGE I SEQUOYAH NUCLEAR PLANT (SON) UNITS 1 AND 2 DOCKET NOS. 50-327 AND 50-328 (TVA-SON-TS-96-09) l LIST OF AFFECTED PAGES Unit 1 6-2 Unit 2 6-2 j i