Category:OPERATING LICENSES & AMENDMENTS
MONTHYEARML20217D2641999-10-12012 October 1999 Amends 248 & 239 to Licenses DPR-77 & DPR-79,respectively, Deleting License Condition 2.C(22).A from License DPR-77 & License Condition 2.C.(16).b from License DPR-79 ML20217B3581999-10-0606 October 1999 Amends 247 & 238 to Licenses DPR-77 & DPR-79,respectively, Request Approval to Remove TS 3.7.6, Flood Protection Plan & Associated Bases from TS for Sequoyah Nuclear Power Plant, Units 1 & 2 ML20212F4601999-09-23023 September 1999 Amends 246 & 237 to Licenses DPR-77 & DPR-79,respectively, Approving Request to Revise TSs to Allow Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20211N8811999-09-0707 September 1999 Amends 245 & 236 to Licenses DPR-77 & DPR-79,respectively, Requesting Approval to Remove Seismic Instrumentation Requirements & Associated Bases from SQN TSs for Units 1 & 2 ML20207A5781999-05-20020 May 1999 Errata to Amend 163 to OL DPR-79 on 931126.SR 4.1.1.1.1.d Was Inadvertently Omitted from Pp 3/4 1-1 of Unit 2 TS ML20206G3691999-05-0404 May 1999 Amends 244 & 235 to Licenses DPR-77 & DPR-79,respectively, Adding New Action Statement to TS 3.1.3.2 That Eliminates Need to Enter TS 3.0.3 Whenever Two or More IRP Indicators Per Bank May Be Inoperable as Listed ML20205N0291999-04-12012 April 1999 Amend 234 to License DPR-79,revising Plant,Unit 2 TSs for Reactor Core by Adding Sentence at End of TS Section 5.3 Authorizing Installation of Limited Number of LTAs Containing Downblended U IAW TR BAW-2328 ML20204E8051999-03-16016 March 1999 Amends 243 & 233 to Licenses DPR-77 & DPR-79,respectively, Revising SQN Licenses by Deleting License Conditions 2.C.(23)F for Unit 1 & 2.C.(16)g for Unit 2 Which Authorizes TVA to Operate ML20206U4191999-02-0909 February 1999 Amends 242 & 232 to Licenses DPR-77 & DPR-79,respectively, Revising SQN TSs for EDG by Adding Note to SR 4.8.1.1.2.d.10 & Deleting SR 4.8.1.1.2.d.11 ML20198C0051998-12-16016 December 1998 Amends 241 & 231 to Licenses DPR-77 & DPR-79,respectively, Revising Sequoyah Nuclear Plant TSs by Extending AOT for Plant EDGs from 72 Hours to 7 Days ML20196B0171998-11-19019 November 1998 Amends 239 & 229 to Licenses DPR-77 & DPR-79,respectively, Revising Plant,Units 1 & 2 TS SR 4.4.3.2.1 by Changing Mode Requirement to Allow power-operated Relief Valve Stroke Testing in Modes 3,4 & 5 with Steam Bubble in Pressurizer ML20196C3721998-11-19019 November 1998 Amends 238 & 228 to Licenses DPR-77 & DPR-79,respectively, Revising TS 3.7.1.3 to Extend Limiting Condition for Operation of Condensate Storage Tanks to Mode 4 When SG Relied Upon for Heat Removal ML20195G3101998-11-17017 November 1998 Amends 237 & 227 to Licenses DPR-77 & DPR-79,respectively, Revising Plant TSs by Lowering Specific Activity Limit of Primary Coolant from 1.0 Uci/Gram Dose Equivalent iodine-131 to 0.35 Uci/Gram Dose Equivalent iodine-131 ML20238F2911998-08-28028 August 1998 Amends 235 & 225 to Licenses DPR-77 & DPR-79,respectively, Revising SQN TSs by Relocating Snubber Requirements from Section 3.7.9 of TS & Bases,To SQN Technical Requirements Manual ML20236S3301998-07-0101 July 1998 Amends 233 & 223 to Licenses DPR-77 & DPR-79,respectively, Revise Section 6, Administrative Controls, Snp TS by Relocating Certain QA Provisions from TS to TVA Nuclear Quality Assurance Plan ML20248L1911998-06-0808 June 1998 Amends 232 & 222 to Licenses DPR-77 & DPR-79,respectively,to Revise SQN TS by Adding New Limiting Condition for Operation 3.7.1.6 That Addresses Requirements for Main FW Isolation Valve Functions Required by SQN Accident Analysis ML20198P9051998-01-13013 January 1998 Amend 230 to License DPR-77,revising TS SR 4.4.3.2.1.b for Remainder of Cycle 9 to Perform Stroke Testing of power-operated Relief Valves in Mode 5 Rather than Mode 4 ML20217D7791997-09-29029 September 1997 Amends 229 & 220 to Licenses DPR-77 & DPR-79,respectively, Revises as-found Setpoint Tolerance Band for Pressurizer Code Safety Relief Valves & Ms Code Safety Relief Valves from 1% to 3% ML20211G1981997-09-23023 September 1997 Amends 228 & 219 to Licenses DPR-77 & DPR-79,respectively, Deleting TS Surveillance Requirement 4.8.1.1.1.b ML20210J5841997-08-12012 August 1997 Amends 227 & 218 to Licenses DPR-77 & DPR-79,respectively, Revising TS 3/4.3.3, Monitoring Instrumentation, TS 3/4.7.11, Fire Detection Sys, TS 3/4.7.12, Fire Barrier Penetrations & TS 6.2.2, Facility Staff ML20151L7911997-07-14014 July 1997 Amends 226 & 217 to Licenses DPR-77 & DPR-79,respectively, Change TS by Eliminating EDG Accelerated Testing & Special Reporting Requirements of TS 4.8.1.1.2.a ML20148S0491997-07-0101 July 1997 Amends 225 & 216 to Licenses DPR-77 & DPR-79,respectively, Revised TSs by Raising Allowable U-235 Enrichment Specified in Section 5.6.1.2 of Fuel Stored in New Fuel Pit Storage Racks from 4.5 to 5.0 Weight Percent ML20137Y8831997-04-21021 April 1997 Amends 223 & 214 to Licenses DPR-77 & DPR-79,respectively, Revising Certain TS & Bases to Allow for Conversion of W Fuel to Framatome Cogema Fuel & Incorporating New License Conditions 2.C.(25) & 2.C.(18) ML20137R5941997-04-0909 April 1997 Amends 222 & 213 to Licenses DPR-77 & DPR-79,respectively, Revising TS 3.4.6.2,4.4.5.4 & 4.4.5.5 & Associated Bases to Permanently Incorporate Requirements Associated W/Sg Tube Inspections & Repair in Sequoyah Nuclear Plant,Units 1 & 2 IA-97-261, Amend 220 to License DPR-77,authorizing Operation at Reactor Core Power Levels Not in Excess of 3,411 Megawatts Thermal1997-03-0404 March 1997 Amend 220 to License DPR-77,authorizing Operation at Reactor Core Power Levels Not in Excess of 3,411 Megawatts Thermal ML20211K5631997-03-0404 March 1997 Amend 220 to License DPR-77,authorizing Operation at Reactor Core Power Levels Not in Excess of 3,411 Megawatts Thermal ML20107N1091996-04-26026 April 1996 Amends 221 & 212 to Licenses DPR-77 & DPR-79 Revising Allowable Value for RCS Loss of Flow Reactor Trip Setpoint from Greater than or Equal to 89.4% to Greater than or Equal to 89.6% ML20101M5471996-04-0303 April 1996 Amend 211 to License DPR-79,revising TS Re Surveillance Requirements & Bases to Incorporate Alternate S/G Tube Plugging Criteria at TSP Intersections ML20100N5651996-03-0404 March 1996 Amends 220 & 210 to Licenses DPR-77 & DPR-79,respectively, Changing Surveillance Test Frequency Specified for Functional Tests of Containment,Fuel Storage Pool & Control Room Radiation Monitors from Monthly to Quarterly ML20100N1931996-03-0101 March 1996 Amends 219 & 209 to Licenses DPR-77 & DPR-79,respectively, Revising Setpoints & Time Delays for Auxiliary Feedwater loss-of-power & 6.9-kilovolt Shutdown Board loss-of-voltage & Degraded Voltage Instruments ML20097D4081996-02-0707 February 1996 Amends 218 & 208 to Licenses NPF-77 & NPF-79,respectively, Revising Frequency of CS Sys & RHR Sys Header Air or Smoke Surveillance Requirements ML20095F9831995-12-11011 December 1995 Amends 216 & 206 to Licenses DPR-77 & DPR-79,respectively, Relocating Heat Flux Hot Channel Factor Penalty from Surveillance Requirement 4.2.2.2.e.1 to Core Operating Limits Repts ML20094N5251995-11-21021 November 1995 Amends 215 & 205 to Licenses DPR-77 & DPR-79,respectively. Amends Address Operation W/Rod Urgent Failure Condition, Including Limited Operation W/One Control or Shutdown Bank Inserted 18 Steps Below Insertion Point ML20094D2231995-10-30030 October 1995 Amend 204 to License DPR-79.Amend Modifies License Condition 2.C.(17) by Extending Required Surveillance Interval to 960518 for Surveillance Requirement 4.3.2.1.3 for Certain Specified ESF Response Time Tests ML20092G6971995-09-13013 September 1995 Amends 210 & 200 to Licenses DPR-77 & DPR-79,changing TS 3.7.5.c to Allow Increase in Average Essential Rcw Supply Header Temp from 84.5 to 87 F Until 950930 ML20087L4631995-08-22022 August 1995 Amends 207 & 197 to Licenses DPR-77 & DPR-79,respectively, Delaying Implementation of Amends 182 & 174 Until Implementation Problems Addressed ML20085G4921995-06-13013 June 1995 Amends 202 & 192 to Licenses DPR-77 & DPR-79,respectively, Adds Limiting Condition for Operation That Allows Equipment to Be Returned to Svc Under Administrative Control to Perform Operability Testing & Establishes Time Interval ML20085J1721995-06-0606 June 1995 Corrected TS Page 6-11 to Amends 198 & 189 to Licenses DPR-77 & DPR-79,respectively,correcting Audit 6.5.2.8.i ML20084R5931995-06-0101 June 1995 Amends 201 & 191 to Licenses DPR-77 & DPR-79,respectively. Amends Revises Definition of Core Alteration & Quadrant Power Tilt Ratio of TS ML20084R6701995-05-30030 May 1995 Amends 199 & 190 to Licenses DPR-77 & DPR-79,respectively, Re Changes to TS to Revise SR for Power Range Neutron Flux Channel Calibration Frequency ML20084M9791995-05-30030 May 1995 Amend 200 to License DPR-77,modifying OL Condition 2.C Re Ice Condenser Surveillance Test Interval ML20083L1771995-05-10010 May 1995 Amends 198 & 189 to Licenses DPR-77 & DPR-79,respectively, Removing Frequencies Specified in TSs for Performing Audits & Deleting Requirements to Perform Rep,Psp & Safeguards Contingency Plan Reviews ML20087J3231995-04-28028 April 1995 Amends 197 & 188 to Licenses DPR-77 & DPR-79,respectively, Clarifying LCO Applicable to Dual Function of Containment Vacuum Relief Isolation Lines ML20082E4211995-04-0404 April 1995 Amends 196 & 187 to Licenses DPR-77 & DPR-79,respectively. Amends Revise TSs to Reduce High Reactor Power Level Setpoints When One or More Main Steam Safety Valves Inoperable & Incorporate Related Charges ML20078D7081995-01-24024 January 1995 Amends 194 & 185 to Licenses DPR-77 & DPR-79,respectively, Adding Permissive Statement to Surveillance Requirement 4.9.7.1 ML20077L1831995-01-0303 January 1995 Amend 193 to License DPR-77,extending Surveillance Interval Requirements to Coincide W/Cycle 7 Refueling Outage ML20077L2191994-12-27027 December 1994 Amends 192 & 184 to Licenses DPR-77 & DPR-79,respectively, Revising TS Re Cold Leg Injection Accumulators ML20076M6411994-11-0202 November 1994 Corrected TS Pp B 3/4 4-3 to Amend 189 to License DPR-77, Adding Info Inadvertenly Deleted ML20078B6391994-10-20020 October 1994 Amends 189 & 181 to Licenses DPR-77 & DPR-79 Respectively, Incorporating Clarifications Re Evaluation of SG Tube Defects ML20076K2181994-10-17017 October 1994 Amends 188 & 180 to Licenses DPR-77 & DPR-79,respectively, Delaying Implementation of Amends 182 & 174 from Unit 2 Cycle 6 Refueling Outage of FY95 1999-09-07
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217F9551999-10-14014 October 1999 Application for Amends to Licenses DPR-77 & DPR-79,proposing Change to TS SRs & Bases to Incorporate ARC for Axial Primary Water Stress Corrosion Cracking at Dented Tube Support Plant Intersections ML20217D2641999-10-12012 October 1999 Amends 248 & 239 to Licenses DPR-77 & DPR-79,respectively, Deleting License Condition 2.C(22).A from License DPR-77 & License Condition 2.C.(16).b from License DPR-79 ML20217E4211999-10-12012 October 1999 TS Change 99-15 to Licenses DPR-77 & DPR-79,providing Unisolation of Containment Penetrations Under Administrative Controls ML20217B3581999-10-0606 October 1999 Amends 247 & 238 to Licenses DPR-77 & DPR-79,respectively, Request Approval to Remove TS 3.7.6, Flood Protection Plan & Associated Bases from TS for Sequoyah Nuclear Power Plant, Units 1 & 2 ML20212F4601999-09-23023 September 1999 Amends 246 & 237 to Licenses DPR-77 & DPR-79,respectively, Approving Request to Revise TSs to Allow Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20211N8811999-09-0707 September 1999 Amends 245 & 236 to Licenses DPR-77 & DPR-79,respectively, Requesting Approval to Remove Seismic Instrumentation Requirements & Associated Bases from SQN TSs for Units 1 & 2 ML20211K1521999-08-30030 August 1999 TS Change 99-10 to Licenses DPR-77 & DPR-79,providing Clarification to Current TS Requirements for Containment Isolation Valves ML20211M7261999-08-30030 August 1999 TS Change 99-08,for Amends to Licenses DPR-77 & DPR-79 to Provide Alternative to Requirement of Actually Measuring Response times.Marked-up & Revised TS Pages,Encl ML20209B7661999-06-30030 June 1999 Application for Amends to Licenses DPR-77 & DPR-79,updating Current TS Requirements for RCS Leakage Detection & RCS Operational Leakage Specifications to Be Consistent with NUREG-1431 ML20196F2121999-06-24024 June 1999 Application for Amends to Licenses DPR-77 & DPR-79,to Change TS Allowing Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20196G4441999-06-24024 June 1999 Application for Amends to Licenses DPR-77 & DPR-79,to Revise TS to Be Consistent with Rev to ISTS Presently Submitted to NEI TSTF for Submittal as Rev to NUREG-1431 ML20195E9661999-06-0707 June 1999 Application for Amend to License DPR-79,increasing Max Allowed Specific Activity of Primary Coolant from 0.35 Microcuries/Gram Dose Equivalent I-131 to 1.0 Microcuries/ Gram Dose Equivalent I-131 for Plant Cycle 10 (U2C10) Core ML20207A5781999-05-20020 May 1999 Errata to Amend 163 to OL DPR-79 on 931126.SR 4.1.1.1.1.d Was Inadvertently Omitted from Pp 3/4 1-1 of Unit 2 TS ML20206G3691999-05-0404 May 1999 Amends 244 & 235 to Licenses DPR-77 & DPR-79,respectively, Adding New Action Statement to TS 3.1.3.2 That Eliminates Need to Enter TS 3.0.3 Whenever Two or More IRP Indicators Per Bank May Be Inoperable as Listed ML20206E1551999-04-29029 April 1999 Application for Amends to Licenses DPR-77 & DPR-79, Consisting of TS Change 99-04, Auxiliary Feedwater Suction Pressure Low Surveillance Frequency Rev. Change Deletes Surveillance ML20206E1341999-04-29029 April 1999 Application for Amends to Licenses DPR-77 & DPR-79, Consisting of TS Change Request 99-03, Main Control Room Emergency Ventilation Sys Verses Radiation Monitors. Change Adds LCOs 3.3.3.1 & 3.7.7 & NUREG-1431 Changes ML20205N0291999-04-12012 April 1999 Amend 234 to License DPR-79,revising Plant,Unit 2 TSs for Reactor Core by Adding Sentence at End of TS Section 5.3 Authorizing Installation of Limited Number of LTAs Containing Downblended U IAW TR BAW-2328 ML20204H3991999-03-19019 March 1999 TS Change 99-01 to Licenses DPR-77 & DPR-79,relocating TS Associated with Electrical Equipment Protective Devices to Technical Requirements Manual ML20204E8051999-03-16016 March 1999 Amends 243 & 233 to Licenses DPR-77 & DPR-79,respectively, Revising SQN Licenses by Deleting License Conditions 2.C.(23)F for Unit 1 & 2.C.(16)g for Unit 2 Which Authorizes TVA to Operate ML20207D5941999-02-26026 February 1999 Application for Amend to Licenses DPR-77 & DPR-79,relocating TS 3.7.6, Flood Protection Plan & Associated Bases from TS to Plant TRM ML20207D6251999-02-26026 February 1999 Application for Amends to Licenses DPR-77 & DPR-79,revising TS to Provide for Consistency When Exiting Action Statements Associated with EDG Sets ML20206U4191999-02-0909 February 1999 Amends 242 & 232 to Licenses DPR-77 & DPR-79,respectively, Revising SQN TSs for EDG by Adding Note to SR 4.8.1.1.2.d.10 & Deleting SR 4.8.1.1.2.d.11 ML20199K5841999-01-15015 January 1999 Application for Amends to Licenses DPR-77 & DPR-79,adding New Action Statement to TS 3.1.3.2 That Would Eliminate Need to Enter TS 3.0.3 Whenever Two or More Individual RPIs Per Bank May Be Inoperable,While Maintaining Protection ML20206S0061999-01-15015 January 1999 TS Change 98-09 for Licenses DPR-77 & DPR-79,relocating TS 3.3.3.3, Seismic Instrumentation & Associated Bases from TS to Plant Technical Requirements Manual ML20198C0051998-12-16016 December 1998 Amends 241 & 231 to Licenses DPR-77 & DPR-79,respectively, Revising Sequoyah Nuclear Plant TSs by Extending AOT for Plant EDGs from 72 Hours to 7 Days ML20196C3721998-11-19019 November 1998 Amends 238 & 228 to Licenses DPR-77 & DPR-79,respectively, Revising TS 3.7.1.3 to Extend Limiting Condition for Operation of Condensate Storage Tanks to Mode 4 When SG Relied Upon for Heat Removal ML20196B0171998-11-19019 November 1998 Amends 239 & 229 to Licenses DPR-77 & DPR-79,respectively, Revising Plant,Units 1 & 2 TS SR 4.4.3.2.1 by Changing Mode Requirement to Allow power-operated Relief Valve Stroke Testing in Modes 3,4 & 5 with Steam Bubble in Pressurizer ML20195G3101998-11-17017 November 1998 Amends 237 & 227 to Licenses DPR-77 & DPR-79,respectively, Revising Plant TSs by Lowering Specific Activity Limit of Primary Coolant from 1.0 Uci/Gram Dose Equivalent iodine-131 to 0.35 Uci/Gram Dose Equivalent iodine-131 ML20195H6041998-11-16016 November 1998 Application for Amends to Licenses DPR-77 & DPR-79,revising EDG SRs by Adding Note to Allow SR to Be Performed in Modes 1,2,3 or 4 If Associated Components Are Already OOS for Testing or Maint & Removing SR Verifying Lockout Features ML20154H7201998-10-0808 October 1998 Supplemental Application for Amends to Licenses DPR-77 & DPR-79,changing TS to Add CRMP to Administrative Controls Section & Bases of TS ML20238F2911998-08-28028 August 1998 Amends 235 & 225 to Licenses DPR-77 & DPR-79,respectively, Revising SQN TSs by Relocating Snubber Requirements from Section 3.7.9 of TS & Bases,To SQN Technical Requirements Manual ML20238F2981998-08-27027 August 1998 Revised Applications for Amends to Licenses DPR-77 & DPR-79, Replacing 72 H AOT of TS 3.8.1.1,Action b,w/7 Day AOT Requirement for Inoperability of One EDG or One Train of Edg.Response to RAI Included in Encl ML20238F1051998-08-27027 August 1998 Application for Amend to License DPR-79,revising TS to Provide for Insertion of Limited Number of Lead Test Assemblies,Beginning W/Unit 2 Operating Cycle 10 Core ML20236S3301998-07-0101 July 1998 Amends 233 & 223 to Licenses DPR-77 & DPR-79,respectively, Revise Section 6, Administrative Controls, Snp TS by Relocating Certain QA Provisions from TS to TVA Nuclear Quality Assurance Plan ML20249C6321998-06-26026 June 1998 Application for Amends to Licenses DPR-77 & DPR-79,lowering Specific Activity of Primary Coolant from 1.0 Uci/G Dose Equivalent I-131 to 0.35 Uci/G Dose Equivalent I-131,as Provided in GL 95-05 ML20248L1911998-06-0808 June 1998 Amends 232 & 222 to Licenses DPR-77 & DPR-79,respectively,to Revise SQN TS by Adding New Limiting Condition for Operation 3.7.1.6 That Addresses Requirements for Main FW Isolation Valve Functions Required by SQN Accident Analysis ML20248E9841998-05-28028 May 1998 Suppl TS Change 95-19 to Licenses DPR-77 & DPR-79,replacing Direct Ref to Nuclear QA Plan in TS Section 6.3.1,facility Staff Qualification,W/Actual Requirements Stated in TVA-NQA-PLN89-A ML20217N3411998-04-30030 April 1998 Application for Amends to Licenses DPR-77 & DPR-79,modifying TS Surveillance Requirement 4.4.3.2.1.b to Change Mode Requirement to Allow PORV Stroke Testing in Modes 3,4 & 5 W/Steam Bubble in Pressurizer Rather than Only in Mode 4 ML20203J1511998-02-25025 February 1998 Application for Amends to Licenses DPR-77 & DPR-79 to Change TS for Units 1 & 2,revising EDG Surveillance Requirements ML20202J6601998-02-13013 February 1998 Application for Amends to Licenses DPR-77 & DPR-79, Incorporating MSIV Requirements to Be Consistent W/Std TS (NUREG-1431) ML20202J7421998-02-13013 February 1998 TS Change 97-04 to Application for Amends to Licenses DPR-77 & DPR-79,relocating Snubber Requirements from Section 3.7.9 of TS to Plant Technical Requirements Manual ML20202J7101998-02-13013 February 1998 Application for Amends to Licenses DPR-77 & DPR-79,adding New LCO That Addresses Requirements for Main Feedwater Isolation,Regulating & Bypass Valves ML20198T4211998-01-21021 January 1998 Suppl TS Change 95-19 to Licenses DPR-77 & DPR-79,revising Title for President,Tva Nuclear & Chief Nuclear Officer to Generic Title of Chief Nuclear Officer ML20198P9051998-01-13013 January 1998 Amend 230 to License DPR-77,revising TS SR 4.4.3.2.1.b for Remainder of Cycle 9 to Perform Stroke Testing of power-operated Relief Valves in Mode 5 Rather than Mode 4 ML20199K4441997-11-21021 November 1997 Application for Amend to License DPR-55,adding one-time Allowance Through Operating Cycle 9 to Surveillance Requirement 4.4.3.2.1.b to Perform Stroke Testing of PORVs in Mode 5 Rather than Mode 4,as Currently Required ML20217D7791997-09-29029 September 1997 Amends 229 & 220 to Licenses DPR-77 & DPR-79,respectively, Revises as-found Setpoint Tolerance Band for Pressurizer Code Safety Relief Valves & Ms Code Safety Relief Valves from 1% to 3% ML20211G1981997-09-23023 September 1997 Amends 228 & 219 to Licenses DPR-77 & DPR-79,respectively, Deleting TS Surveillance Requirement 4.8.1.1.1.b ML20211A3091997-09-17017 September 1997 TS Change 97-02 to Licenses DPR-77 & DPR-79,revising Pressure Differential Surveillance Requirements for Containment Spray Pumps ML20210J5841997-08-12012 August 1997 Amends 227 & 218 to Licenses DPR-77 & DPR-79,respectively, Revising TS 3/4.3.3, Monitoring Instrumentation, TS 3/4.7.11, Fire Detection Sys, TS 3/4.7.12, Fire Barrier Penetrations & TS 6.2.2, Facility Staff ML20151L7911997-07-14014 July 1997 Amends 226 & 217 to Licenses DPR-77 & DPR-79,respectively, Change TS by Eliminating EDG Accelerated Testing & Special Reporting Requirements of TS 4.8.1.1.2.a 1999-09-07
[Table view] |