Application for Amend to Licenses DPR-77 & DPR-79,revising TSs to Implement Recent Rule Change to 10CFR50,App J
ML20095D581
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 12/08/1995
From: Shell R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20095D582 List:
References
TVA-SQN-TS-95-2, NUDOCS 9512130163
Download: ML20095D581 (2)


Text

. i e l IUA i

Tennessee Valley Authority. Post Othce Box 2000. Soddy-Daisy Tennessee 37379

)

l December 8,1995  ;

l TVA-SON-TS-95-24 10 CFR 50.90 l l

U.S. Nuclear Regulatory Commission i ATTN: Document Control Desk l Washington, D.C. 20555 .

I Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SON) - TECHNICAL SPECIFICATION (TS)

CHANGE 95-24," UNITS 1 AND 2 -IMPLEMENTATION OF 10 CFR 50, APPENDIX J, OPTION B, PERFORMANCE BASED TESTING" in accordance with the provisions of 10 CFR 50.4 and 50.90, TVA is submitting an amendment to Licenses DPR-77 and DPR-79 to change the TSs of SON Units 1 and 2.

The proposed change revises TSs to implement the recent rule change to 10 CFR Part 50, Appendix J. NRC revised 10 CFR Part 50, Appendix J to incorporate Option B for containment leakage rate testing. Option B is a voluntary performance-base i option. j Option B allows licensees to extend the integrated leakage rate test (Type A test) frequency based on an acceptable past performance history. For Type B and Type C local leak-rate tests, Option B allows licensees to extend the testing frequency based on the plant-specific experience history of each component and established controls to ensure continued performance during the extended testing interval.

The proposed TS change is identified in Enclosure 1. The justification for the l proposed TS change is provided in Encicsure 2. A proposed determination of no l significant hazards consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3. j TVA has determined that this amendment will provide significant cost savings during the upcoming Unit 2 Cycle 7 refueling outage. TVA requests approval of the enclosed amendment on a schedule to support the Unit 2 Cycle 7 refueling outage, which is currently scheduled to begin in April 1996. TVA requests a 45-day implementation period for this TS change following issuance.  !

l 4

\

~ 130LG7 \'

9512130163 951208 PDR ADDCK 05000327 ~ k1 i P.. ..- _PDR , , g

J ,

U.S. Nuclear Regulatory Commission Page 2 i December 8,1995 ,

I Please direct questions concerning this issue to D. V. Goodin at (423) 843-7734. ,

Sincerely, kn Y, R. H. Shell Manager SON Site Licensing i d beforejne i Sworgg and subscrihN

  • day of / l1995 //DM/tt/L/ i 100'/ '

i />l

'lYD 4 Notary Public My Commissic: Exoires M e-)/ /gh 7 Enclosures cc (Enclosures): )

Mr. D. E. LaBarge, Project Manager l Nuclear Regulatory Commission j One White Flint, North  ;

11555 Rockville Pike Rockville, Maryland 20852-2739 i

Mr. Michael H. Mobley, Director (w/o Enclosures) ,

Division of Radiological Health 3rd Floor L & C Annex 401 Church Street Nashville, Tennessee 372431532 NRC Resident inspector Sequoyah Nuclear Plant 2600lgou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator i U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 i