ML20117D293

From kanterella
Jump to navigation Jump to search
TS Change 96-03 to Licenses DPR-77 & DPR-79,revising TS 3.7.1.3, Condensate Storage Tank, to Include New Mode of Applicability to Read Mode 4 When SG Relied Upon for Heat Removal
ML20117D293
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/21/1996
From: James Smith
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20117D296 List:
References
CON-TVA-SQN-TS-96-03, CON-TVA-SQN-TS-96-3 NUDOCS 9608280238
Download: ML20117D293 (2)


Text

,

% 5

(

'.IUA Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37379-2000 i

i 1

1 1

August 21,1996 l l

I TVA-SON-TS-96-03 10 CFR 50.90 U.S. Nuclear Regulatory Commission l ATTN: Document Control Desk {

Washington, D.C. 20555  !

1 Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 l SEQUOYAH NUCLEAR PLANT (SON) - TECHNICAL SPECIFICATION (TS)

CHANGE 96-03, " CONDENSATE STORAGE TANK (CST)"

in accordance with 10 CFR 50.90, we are enclosing an amendment to Licenses DPR-77 and DPR-79 to change the TSs of SON Units 1 and 2. The proposed change revises Specification 3.7.1.3," Condensate Storage Tank," to include a new mode of applicability that reads: " Mode 4 when steam generator is relied upon for heat removal." In addition, other proposed changes to Specification 3.7.1.3 and a Bases change to Bases Sections 3/4.3.1 and 3/4.3.2," Protective and Engineered Safety Features (ESF) Instrumentation," are included to provide improvements and establish requirements that are consistent with Westinghouse Standard Technical Specifications (NUREG-1431, Revision 1).

The proposed TS change is identified in Enclosure 1. The justification for the proposed TS change is provided in Enclosure 2. A proposed determination of no significant hazards consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3. Enclosure 4 provides the retyped pages for the proposed TS change.

TVA requests a 45-day implementation period for this TS change following issuance.

\ !

070135 9608280238 960821 h

PDR ADOCK 05000327 p PDR l

)

U.S. Nuclear Regulatory Commission Page 2 August 21,1996 ,

Please direct questions concerning this issue to D. V. Goodin at (423) 843-7734. I Sincersly,

,= -

J. D. Smith Acting Manager SON Site Licensing Sworn to and subscribed before me this 4/# day of Wbod 1996 OhJUL % L Not%ry Public #

My Commission Expires ddada/4/, /fft  !

Enclosures cc (Enclosures):

Mr. R. W. Hernan, Project Manager Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Mr. Michael H. Mobley, Director (w/o Enclosures)

Division of Radiological Health 3rd Ficor L & C Annex 401 Church Street Nashville, Tennessee 37243-1532 NRC Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711