ML20132C056

From kanterella
Revision as of 10:17, 12 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Prioritizes Problem Sheets for Full Power Operation Problem Sheets 805,821 & 826 & 39.Problem Sheets Identified in 840409 Memo Should Be Resolved as Approved Tech Spec Changes Prior to Issuance of Full Power OL
ML20132C056
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/01/1984
From: Rubenstein L
Office of Nuclear Reactor Regulation
To: Novak T
Office of Nuclear Reactor Regulation
Shared Package
ML19276B572 List: ... further results
References
FOIA-84-459 TAC-54808, NUDOCS 8405160348
Download: ML20132C056 (1)


Text

-

+

L ug'%

.' f C7 UNITED STATES

' - ~

8" 7 T, NUCLEAR REGULATORY COMMISSION WASHING TON, D. C. 20555 MAY 01 M

,/

s ME!40RANDUM FOR: Thomas M. Novak, Assistant Director for Licensing, Division of Licensing FROM:

L. S. Rubenstein, Assistant Director for Core and Plant Systems, Division of Systems Integration

SUBJECT:

PRIORITIZATION OF PROBLEM SHEETS FOR FULL POWER OPERATION OF GRAND GULF - AUXILIARY SYSTEMS BRANCH - TAC NO. 54808 The Auxiliary Systems Branch has reviewed the problem sheets which were pro-vided by the subject TAC. Of these new problem sheets only numbers 805, 821 and 826 appearto be within the responsibility of the Auxiliary Systems Branch.

It is our position that these three problem sheets and the 39 problem sheets identified in our April 9,1984 memorandum (Enclosure 1) should be resolved, as approved technical specification changes, prior to issuance of a full l

power license to Grand Gulf. This completes our work on TAC NO. 54808.

L~*>(\\.)q

(.

'I

w. : m--n.r---

L. S. h benstein, Assistant Director for Co're and Plant Systems Division of Systems Integration

Enclosure:

Re-Prioritization of Changes to Grand Gulf Technical Specifications -

1 TAC 54458 cc w/ enclosure:

R. Mattson L. Kintner

0. Parr E. Adensam J. Wilson D. Hoffman J. Ridgely D. Brinkman

Contact:

J. Ridgely X29566 A

Y P

vf

  1. b4 wen o

UNITED STATES

~g NUCLEAR REGULATORY COMMISSION n

Y WASHINGTON, D. C. 20555

+, * * * * * #

APR 9 1994 HEMORANDUM FOR: Thomas M. Novak, Assistant Director for Licensing, Division of Licensing FROM:

L. S. Rubenstein Assistant Director for Core and Plant Systens, Division of Systems Integration

SUBJECT:

RE-PRIORITIZATION OF CHANGES TO GRAND GULF TECHNICAL SPECIFICATIONS - AUXILIARY SYSTEMS BRANCH - TAC NO. 54458 1

Per the revised DL work request sheet associated with the subject TAC and clarified by Les kintner, the Auxiliary Systems Branch has reviewed the 341 changes to the Grand Gulf Technical Specifications and has identified 39 changes which are in the Auxiliary Systems Branch primary area of respon-sibility. These 39 changes identified in the submitted problem sheets have been prioritized into the following two categories.

Category 1 ftens should be resolved prior to criticality and Category 2 itens should be resolved prior to exceeding 5% power.

As stated in our me:norandum of March 21, 1984, it should be noted that the intent of the changes is not always clear. Therefore, we may not have selected all of the appropriate items.

He request that the applicant pro-vide clear descriptions when the technical specifications are submitted for review and we will verify that all of the changes which are the responsibility of the Auxiliary Systems Branch have been identified.

The selection of a orfority for a given change was based on the anticipated risk to the health and safety of the public with respect to the probability of an event, the potential hazard represented by the technical specification change, and the significance of the change. Based upon the above considera-tions, we have identified 23 Category 1 items (Nos. 17, 32, 82, 94, 100, 129, 132, 156, 159, 165, 173, 188, 195, 199, 208, 210, 214, 221, 222, 229, 250, 287, and 305) and 16 Category 2 itens (Nos. 2, 35, 46, 58, 99, 176, 187, 255, 256, 258, 261, 267, 276, 312,'313 and 326).

This completes our work on TAC No. 54458. Since we are not providing a safety evaluation report, we are not enclosing a SALP report.

I

\\

cfi M DA.,T.

L. S.

u enstein, Assistant Director for Core and Plant Systems Division of Systems Integration cc:

R. Mattson F. Clemenson O. Parr E. Adensam J. Wilson L. Xintner J. Ridgely

Contact:

J. Ridgely X29566 w,,w mw 1

(. U P ' ~ r 'V_P_

^'

_ _ _ _