Advises That Listed Actions Required by Util to Resolve Issues Raised in 840427 Meeting to Review Tech Specs.Util Will Modify FSAR & Tech Specs to Reflect Load Values & Justify Value
ML20132C065
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/03/1984
From: Srinivasan M
Office of Nuclear Reactor Regulation
To: Adensam E
Office of Nuclear Reactor Regulation
Shared Package
ML19276B572 List: ... further results
References
FOIA-84-459 NUDOCS 8405170243
Download: ML20132C065 (2)


Text

- - -.....

i g

UNITED STATES

-[

e, 3 g NUCLEAR REGULATORY COMMISSION

' 'i/. - E WASHINGTON,0. C. 20555 8

asg. v j May 3,1984 s

MEMORANDUM FOR:

E. Adensam, Chief Licensing Branch No. 4, DL FROM:

M. Srinivasan, Chief Power Systems Branch, DSI

SUBJECT:

STATUS OF PSB ITEMS - GRAND GULF TECHNICAL SPECIFICATIONS REVIEW MEETING APRIL 27, 1984

REFERENCE:

T. Novak's memo of April 25,1984 to L. Rubenstein, et al In response to the above referred memo, it is PSB's assessment that the following actions are required by MP&L to resolve the issues raised by PSB from the review of Grand Gulf technical specifications as stated in the meeting with MP&L held on April 27, 1984 Problem 1 Tech. Spec. Table 3.3.3-1 The FSAR gave two levels of voltage protection for HPCS diesel generator bus one for loss of power and the other for degraded voltage; MP&L hac since changed the design.

Licensee Action (MP&L will assign a problem sheet for resolving this issue)

Problem 2 Tech. Spec. 3/4 8-4 Load rejection values for diesel generator deviate from FSAR values (LPCS pump is the largest load to be rejected)

Licensee Action (MP&L will modify the FSAR and the technical specification to reflect the actual load values and justify the value)

Problem 3 Tech. Spec. 3/4 8-6 Diesel generator bypass of trips on LOCA - overcurrent is not bypassed nor does it have coincident logic Licensee Action (MP&L have a problem sheet #808 for resolving this item) p

Contact:

S. Rhow i

4 x28698 l

. p May 3,1984 E. Adensam,

hroblem 4 Tech. Spec. 3/4 8-6 FSAR st'ated override of the design was such that if the diesel generator #3 was in the test mode and a LOCA signal occurred, the diesel generator would revert to standby mode (the tech spec. indicates this design feature is not included).

Licensee Action (MP&L have assigned problem sheet 333 for resolution of this item)

.)

Problem 5 Tech. Spec. 3/4 8-11 Testing of the battery charger is not in accordance with the Standard Technical Specification and adequate justification has not been provided.

Licensee Action (MP&L have assigned problem sheet 227 for resolution of this item) t/

r, cvw<tw M. Srinivasan, Chief Power Systems Branch Division of Systems Integration cc:

R. Mattson L. Rubenstein T. Novak L. Kintner D. Houston J. E. Knight A. Ungaro S. Rhow a