MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, RT Sys Instrumentation & TS Table B 3.3.1-1, RT Sys Setpoints ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints ML20141G1941997-05-16016 May 1997 Proposed Tech Specs,Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint ML20134B9801996-09-19019 September 1996 Proposed Tech Specs Re Inverter/Battery Charger Mod ML20116F0471996-08-0202 August 1996 Proposed Tech Specs Re Increase in Allowed Outage Time for Charging Pump from 72 H to 7 Days ML20116E8651996-07-31031 July 1996 Proposed Tech Specs Modifying Inverter/Battery Chargers by Incorporating Listed Changes Into CPSES Units 1 & 2 TSs ML20116F3711996-07-31031 July 1996 Proposed Tech Specs 6.9.1.6b Including TR, SBLOCA Analysis Methodology, in List of NRC-approved Methodologies & Rev of Unit 1 Rx Trip Setpoints ML20115E8041996-07-10010 July 1996 Proposed TS 3/4.7.11,revising Lco,Actions & SRs to Take Credit for Addition of Train Oriented Fan Coil Units for Each UPS & Distribution Room ML20115C9461996-07-0909 July 1996 Proposed Tech Specs Re Steam Line pressure-low Allowable Value ML20113B5891996-06-21021 June 1996 Proposed Tech Specs,Removing Request to Relocate MSIV Full Closure Time Requirement to Program Administratively Controlled by TS & Revising Associated Bases to Include Info to Clarify Expanded Bases Specific to CPSES ML20106G8231996-03-13013 March 1996 Proposed Tech Specs,Supplementing LAR-95-007,revising TS LCO 3.9.4 to Allow Both Doors of Personnel Airlock to Remain Open as Long as One Pal Door Capable of Being Closed ML20101C5681996-03-12012 March 1996 Proposed Tech Specs 3/4.6.1 & 6.8.3g to Implement New Containment Leakage Rate Testing Program Required by 10CFR50 App J,Option B ML20100J0791996-02-22022 February 1996 Proposed Tech Specs 3/4.9.4,revising Units 1 & 2 TS Bases Allowing Both Doors of Pal to Remain Open as Long One Pal Door Is Capable of Closing ML20096B3281996-01-0505 January 1996 Proposed TS Re Wide Range RCS Temp.-Th Remote Shutdown Indication ML20095E8311995-12-15015 December 1995 Proposed TS Bases 2.2.1,deleting Unnecessary Details Re Time Delay Requirements for Undervoltage & Underfrequency RCP Trip Setpoints ML20094N6201995-11-21021 November 1995 Proposed Tech Specs,Allowing Containment Pal Doors to Remain Open During Movement of Irradiated Fuel & During Core Alterations for Plant ML20094N9011995-11-21021 November 1995 Proposed Tech Specs,Incorporating Revised Core Safety Limit Curves & Revised N-16 Overtemp Reactor Trip Setpoints, Resulting from Reload Analyses for CPSES Unit 2,Cycle 3 ML20087K1751995-08-15015 August 1995 Proposed Tech Specs,Moving Shutdown Margin Limits from TS & Providing Guidelines for Removal of cycle-specific Parameter Limits from TS 1999-09-10
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, RT Sys Instrumentation & TS Table B 3.3.1-1, RT Sys Setpoints ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20207F3511999-02-25025 February 1999 Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical Circuits ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints 1999-09-10
[Table view] |
Text
IU I
l L
4 i
ATTACHMENT 3 to TXX 99133 MARKUP OF AFFECTED TECHNICAL SPECIFICATION PAGES CTS page - 3/4.8-12 ITS page - 3.8 i f
I h
ADO p
't i
l l
4 INSERT A On a one time basis, for battery BT1ED2, this performance discharge test may be performed in lieu of the battery service test required by Specification 4.8.2.1d, twice within a 60 month interval. This one time exception expires prior to entry into MODE 4 following the next Unit 1 outage of sufficient duration to perform a service test.
.l
t SURVEILLANCE REQUIREMENTS (continued)
I SURVEILLANCE FREQUENCY SR 3.8.4.6 Verify each battery charger supplies a 300 amps at a 130 V 18 months for 2 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
S R 3. 8. 4. 7 --------.----------------------- N O T E S --------------------------------
1.
The modified performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7* crcc pc; S0 mor,ths.
2.
Verify requirement during MODES 3,4,5,6 or with core off-loaded.
Verify battery capacity is adequate to supply, and maintain 18 months in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.
(continued)
!On's one timeLbasis!.for batterp BT1ED2Ta performance ~ discharge: test inay be' performed in lieu of the: battery service test required by Specification :3.8.4.7, twice.within a;60 month interval?This,one; time exception. expires prior to. entry into MODEj4 following;the next U. nit 1 outage.of sufficient duration to. perform a. service test; i
4 l
l l
1 l
COMANCHE PEAK - UNITS 1 AND 2 3.8-26 AMENDMENT 64 j
r
~
~
D. C. SOURCES SURVEILLANCE REQUIREMENTS (Continued) b.
At least once per 92 days and within 7 days after a battery discharge with battery terminal voltage below 110 volts, or battery overcharge with battery terminal voltage above 150 volts, by verifying that:
1)
The parameters in Table 4.8-2 meet the Category B limits, 2)
There is no visible corrosion at either terminals or connectors,' or,the ' connection resistance of these items is less than 150 x 10' che, and 3)
The average electrolyte temperature of 12 connected cells is above 70*F.
a
.c.
At least once per 18 months by verifying that:
1)
The cells, cell plates, and battery racks show no visual indication of physical damage or abnormal deterioration, i
2)
The cell-to-cell and terminal connections are clean, tight, and coated with anticorrosion material, 3)
The resistance of each cell-to-cell and terminal connection is less than or equal to 150 x 10 ohm, and 4)
The battery charger will supply at least 300*~ amperes"at -
T--' ~
greater than or equal to 130 volts for at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
d.
At.least once per 18 months, during shutdown, by verifying that the battery capacity is adequate to supply and maintain in OPERABLE status all of the actual or simulated emergency loads for the design duty cycle when the battery is subjected to a battery service test; e.
. At least once per 60 months, during shutdown, by verifying that the battery capacity is at least 80% of the manufactgrsr's rating when g
subjected to a performance discharge test.
Once plir 60-month gg, cop interval this performance discharge test may be performed in lieu of the battery service test. required by Specification 4.8.2.ld.; and f.
At least once per 18 months, during shutdown, by giving performance discharge tests of battery capacity to any battery that shows signs
)
of degradation or has reached 85% of the service life expected for the application. Degradation is indicated when the battery capacity drops more than 10% of rated capacity from its average on previous performance tests, or is below 90% of the manufacturer's rating.
- 225 amperes for. Unit 2 until replacement of the battery charger during the 3rd refueling outage for Unit 2.
L^*
y4 3 ascA7" A 99-co't-COMANCHE PEAK - UNITS 1 & 2 3/4 8-12 Unit 1 - Amendment No. 53 Unit 2 - Amendment No. 39 a