Letter Sequence Request | |
---|---|
TAC:MF4332, (Approved, Closed) | |
Initiation Administration | |
MONTHYEARML14183B3182014-06-30030 June 2014
[Table View]Proposed License Amendment Request Permanent Fifteen-Year Type a Test Interval Project stage: Request ML14203A3122014-07-22022 July 2014 NRR E-mail Capture - Acceptance REVIEW-(LAR)-NORTH Anna Power Station, Units 1 and 2, Lar,Permanent FIFTEEN-YEAR Type a Test Interval (TAC MF4332 and MF4333) Project stage: Acceptance Review ML15034A3532015-01-28028 January 2015 Response to Request for Additional Information Proposed License Amendment Request Permanent Fifteen-Year Type a Test Interval Project stage: Response to RAI ML15068A0902015-03-0909 March 2015 NRR E-mail Capture - North Anna Units 1 and 2, Request for Information: Technical Specification Change Proposing Permanent FIFTEEN-YEAR Type a Test Interval Project stage: RAI ML15133A3812015-06-16016 June 2015 Issuance of Amendments to Extended Type a Test Frequency to 15 Years Project stage: Approval 2015-01-28 |
ML14183B318 | |
Person / Time | |
---|---|
Site: | North Anna |
Issue date: | 06/30/2014 |
From: | Sartain M D Virginia Electric & Power Co (VEPCO) |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
14-272 | |
Download: ML14183B318 (93) | |
Similar Documents at North Anna | |
---|---|
Category:Letter
MONTHYEARIR 05000338/20240032024-10-28028 October 2024
[Table view]– Integrated Inspection Report 05000338-2024003 and 05000339-2024003 ML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML24281A1372024-10-0707 October 2024 ISFSI - Submittal of Cask Registration for Spent Fuel Storage 05000338/LER-2024-001-01, Automatic Reactor Trip Due to Prni High Negative Rate2024-09-24024 September 2024 Automatic Reactor Trip Due to Prni High Negative Rate IR 05000338/20244202024-09-23023 September 2024 Security Baseline Inspection Report 05000338/2024420 and 05000339/2024420, Cover Letter ML24243A0872024-09-20020 September 2024 Response to EPA Comments Regarding the Final Site Specific Supplement to the Generic Eist for License Renewal North Anna Power Station, Units 1 and 2 IR 05000338/20244022024-09-17017 September 2024 Security Baseline Inspection Report 05000338/2024402 and 05000339/2024402 ML24215A2622024-08-28028 August 2024 Transmittal Letter for Subsequent Renewed License IR 05000338/20240052024-08-27027 August 2024 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2024005 and 05000339/2024005) 05000339/LER-2024-001-01, Loss of Generator Field for 2J Eog During 2-PT-82.282024-08-20020 August 2024 Loss of Generator Field for 2J Eog During 2-PT-82.28 ML24234A0742024-08-15015 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-23-63, NEI 03-08 Needed Guidance: PWR Thermal Shield Flexure Inspection Requirements ML24221A1932024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Upper Mattaponi Tribe ML24206A0052024-08-0808 August 2024 SLR Final EIS Letter to Achp ML24221A1882024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Monacan Indian Nation ML24221A1842024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Nation, Oklahoma ML24221A1922024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Tuscarora Nation of New York ML24221A1912024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Rappahannock Tribe, Inc ML24221A1942024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-United Keetoowah Band of Cherokee Indians in Oklahoma ML24221A1852024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Tribe of Indians ML24221A1832024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Chickahominy Indian Tribe-Eastern Division ML24206A0062024-08-0808 August 2024 Notice of Availability of the Final Environmental Impact Statement for the North Anna Nuclear Power Station Unit Numbers 1 and 2 Subsequent License Renewal (Docket Numbers: 50-338 and 50-339) ML24163A3002024-08-0808 August 2024 Request for Relief Request N1-I5-NDE-007 Inservice Inspection Alternative ML24208A0142024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-Absentee-Shawnee Tribe of Indians of Oklahoma ML24221A1872024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Shawnee Tribe of Oklahoma ML24221A1862024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Band of Cherokee Indians ML24221A1902024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Pamunkey Indian Tribe ML24221A1812024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Catawba Indian Nation ML24221A1822024-08-0808 August 2024 Tribal Section 106 Letters - North Anna - Chickahominy Indian Tribe ML24221A1892024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Nansemond Indian Nation ML24241A0692024-08-0606 August 2024 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000338/20240022024-08-0202 August 2024 Integrated Inspection Report 05000338/2024002 and 05000339/2024002 ML24206A0432024-07-26026 July 2024 Feis - Letter to the Applicant 05000338/LER-2024-001, Automatic Reactor Trip Due to Prni High Negative Rate2024-07-25025 July 2024 Automatic Reactor Trip Due to Prni High Negative Rate ML24206A0902024-07-24024 July 2024 Owners Activity Report ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code 05000339/LER-2024-001, Loss of Generator Field for 2J EDG During 2-PT-82.282024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 ML24165A1462024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 IR 05000338/20240102024-05-24024 May 2024 NRC Fire Protection Team Inspection (FPTI) Report 05000338/2024010 and 05000339/2024010 IR 05000338/20240012024-05-10010 May 2024 Integrated Inspection Report 05000338/2024001 and 05000339/2024001 IR 05000338/20244032024-04-30030 April 2024 – Security Baseline Inspection Report 05000338-2024403 and 05000339-2024403 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24110A1462024-04-18018 April 2024 Independent Spent Fuel Storage Installation (Sfsi) - Annual Radiological Environmental Operating Report ML24110A1502024-04-18018 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24110A1392024-04-18018 April 2024 Annual Environmental Operating Report ML24087A0572024-04-16016 April 2024 Correction to Issuance of Amendment Nos. 296 and 279 ML24088A2692024-03-27027 March 2024 Core Operating Limits Report Cycle 31 Pattern Sos Revision 0 ML24086A4292024-03-25025 March 2024 Response to Request for Additional Information Associated with Alternative Request N1-I5-NDE-007 Request to Deter Additional Required Reactor Coolant Pump Casing Inspection 2024-09-24 Category:License-Application for (Amend/Renewal/New) for DKT 30 MONTHYEARML20244A3362020-08-31031 August 2020
[Table view]Proposed License Amendment Request, Addition of Analytical Methodology to the Core Opera Ting Limits Report for a Full Spectrum Loss of Coolant Accident (Fsloca) Gamma Energy Redistribution Information ML14183B3182014-06-30030 June 2014 Proposed License Amendment Request Permanent Fifteen-Year Type a Test Interval ML0327904602003-09-30030 September 2003 North Anna Early Site Permit Application, Revision 0, Table of Contents, Administrative Information, Site Safety Analysis Report Through Appendix 2.5.4A. (Non-Proprietary) 2020-08-31 Category:40 MONTHYEARML23089A3642023-03-30030 March 2023
[Table view]Decommissioning Funding Status Report ML22010A0292021-12-31031 December 2021 Independent Spent Fuel Storage Installations (Isfsls) - 10 CFR 72.30 Decommissioning Funding Plan ML21354A8462021-12-14014 December 2021 North Ana Power Station Isfsls - 10 CFR 72.30 Decommissioning Funding Plan ML21091A0982021-03-26026 March 2021 Decommissioning Funding Status Report ML21085A5532021-03-25025 March 2021 Decommissioning Funding Status Report ML20244A3362020-08-31031 August 2020 Proposed License Amendment Request, Addition of Analytical Methodology to the Core Opera Ting Limits Report for a Full Spectrum Loss of Coolant Accident (Fsloca) Gamma Energy Redistribution Information ML19092A2692019-03-27027 March 2019 Decommissioning Funding Status Report ML19092A2952019-03-26026 March 2019 Decommissioning Funding Status Report ML19003A1462018-12-31031 December 2018 Independent Spent Fuel Storage Installations (Isfsis) - Submittal of 10 CFR 72.30 Decommissioning Funding Plan ML17094A5222017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17093A6692017-03-30030 March 2017 2016 Decommissioning Funding Status Report ML15099A3962015-03-30030 March 2015 Decommissioning Funding Status Report ML15092A1152015-03-30030 March 2015 Submittal of Decommissioning Funding Status Report ML15093A1042015-03-26026 March 2015 Decommissioning Funding Status Report ML14183B3182014-06-30030 June 2014 Proposed License Amendment Request Permanent Fifteen-Year Type a Test Interval ML13098A0872013-03-28028 March 2013 Decommissioning Funding Status Report ML13091A0042013-03-27027 March 2013 Decommissioning Financial Assurance ML12353A0322012-12-13013 December 2012 10 CFR 72.30 Decommissioning Funding Plan ML1118101552011-06-14014 June 2011 Submittal of Decommissioning Funding Status Report: Response to Request for Addition Information ML1109003752011-03-29029 March 2011 Decommissioning Funding Status Report ML1109102402011-03-28028 March 2011 Decommissioning Financial Assurance ML0909101482009-03-30030 March 2009 Decommissioning Funding Status Report ML0709300382007-03-29029 March 2007 Decommissioning Funding Status Report ML0508904182005-03-29029 March 2005 Decommissioning Funding Status Report Notification of Intent to Remove Parent Guarantee ML0409800272004-03-29029 March 2004 Decommissioning Funding Status Report and Update to Parent Company Guaranty ML0327904602003-09-30030 September 2003 North Anna Early Site Permit Application, Revision 0, Table of Contents, Administrative Information, Site Safety Analysis Report Through Appendix 2.5.4A. (Non-Proprietary) ML0309906022003-03-31031 March 2003 Decommissioning Funding Status Report and Update to Millstone Unit 1 Parent Guarantee ML0309304252003-03-28028 March 2003 Decommissioning Financial Assurance, Attachments 1 and 2 ML0309304122003-03-28028 March 2003 Decommissioning Financial Assurance, Exhibit A-1 Through Appendix D ML0309303672003-03-28028 March 2003 Decommissioning Financial Assurance, Comprehensive Cost of Service Study - Exhibit D 2023-03-30 Category:70 MONTHYEARML23089A3642023-03-30030 March 2023
[Table view]Decommissioning Funding Status Report ML22010A0292021-12-31031 December 2021 Independent Spent Fuel Storage Installations (Isfsls) - 10 CFR 72.30 Decommissioning Funding Plan ML21354A8462021-12-14014 December 2021 North Ana Power Station Isfsls - 10 CFR 72.30 Decommissioning Funding Plan ML21091A0982021-03-26026 March 2021 Decommissioning Funding Status Report ML21085A5532021-03-25025 March 2021 Decommissioning Funding Status Report ML20244A3362020-08-31031 August 2020 Proposed License Amendment Request, Addition of Analytical Methodology to the Core Opera Ting Limits Report for a Full Spectrum Loss of Coolant Accident (Fsloca) Gamma Energy Redistribution Information ML19092A2692019-03-27027 March 2019 Decommissioning Funding Status Report ML19092A2952019-03-26026 March 2019 Decommissioning Funding Status Report ML19003A1462018-12-31031 December 2018 Independent Spent Fuel Storage Installations (Isfsis) - Submittal of 10 CFR 72.30 Decommissioning Funding Plan ML17094A5222017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17093A6692017-03-30030 March 2017 2016 Decommissioning Funding Status Report ML15099A3962015-03-30030 March 2015 Decommissioning Funding Status Report ML15092A1152015-03-30030 March 2015 Submittal of Decommissioning Funding Status Report ML15093A1042015-03-26026 March 2015 Decommissioning Funding Status Report ML14183B3182014-06-30030 June 2014 Proposed License Amendment Request Permanent Fifteen-Year Type a Test Interval ML13098A0872013-03-28028 March 2013 Decommissioning Funding Status Report ML13091A0042013-03-27027 March 2013 Decommissioning Financial Assurance ML12353A0322012-12-13013 December 2012 10 CFR 72.30 Decommissioning Funding Plan ML1118101552011-06-14014 June 2011 Submittal of Decommissioning Funding Status Report: Response to Request for Addition Information ML1109003752011-03-29029 March 2011 Decommissioning Funding Status Report ML1109102402011-03-28028 March 2011 Decommissioning Financial Assurance ML0909101482009-03-30030 March 2009 Decommissioning Funding Status Report ML0709300382007-03-29029 March 2007 Decommissioning Funding Status Report ML0508904182005-03-29029 March 2005 Decommissioning Funding Status Report Notification of Intent to Remove Parent Guarantee ML0409800272004-03-29029 March 2004 Decommissioning Funding Status Report and Update to Parent Company Guaranty ML0327904602003-09-30030 September 2003 North Anna Early Site Permit Application, Revision 0, Table of Contents, Administrative Information, Site Safety Analysis Report Through Appendix 2.5.4A. (Non-Proprietary) ML0309906022003-03-31031 March 2003 Decommissioning Funding Status Report and Update to Millstone Unit 1 Parent Guarantee ML0309304252003-03-28028 March 2003 Decommissioning Financial Assurance, Attachments 1 and 2 ML0309304122003-03-28028 March 2003 Decommissioning Financial Assurance, Exhibit A-1 Through Appendix D ML0309303672003-03-28028 March 2003 Decommissioning Financial Assurance, Comprehensive Cost of Service Study - Exhibit D 2023-03-30 Category:Technical Specifications MONTHYEARML23072A0892023-05-0101 May 2023
[Table view](Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML21232A2172021-10-19019 October 2021 Issuance of Amendment Nos. 288 and 271 to Revise Technical Specifications Battery Surveillance Testing ML21280A3282021-10-0707 October 2021 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions ML20325A0952021-03-19019 March 2021 Issuance of Amendment to Revise Technical Specifications to Allow Usage of a Small Break Loss of Coolant Accident Methodology (Non-Proprietary) ML20302A1792020-10-29029 October 2020 Non-Proprietary, Issuance of Amendment Nos. 286 and 269 to Revise Technical Specifications to Allow Usage of a Full Spectrum Loss of Coolant Accident Methodology ML19238A1272019-09-12012 September 2019 Issuance of Amendment Nos. 282 and 265 to Revise Technical Specifications Regarding Open Phase Protection ML19196A1102019-07-0909 July 2019 Attachments 2, 3 & 4 - Response to NRC Request for Additional Information and Correction of SBLOCA Analysis Error and Revised Marked-Up/Typed NAPS and SPS Technical Specifications Pages ML19156A2072019-05-24024 May 2019 Response to Request for Additional Information on Proposed License Amendment Request Open Phase Protection Per NRC Bulletin 2012-01 ML17187A1322017-06-28028 June 2017 Submittal of Topical Report VEP-NE-1, Revision 0.2-A, Relaxed Power Distribution Control Methodology and Associated Fq Surveillance Technical Specifications for Information Only ML16252A4782016-10-17017 October 2016 Issuance of Amendments Revising Technical Specifications to Address the Issue Identified in Westinghouse NSAL-09-5, Revision 1, and NSAL-15-1, Revision 0 ML16013A4442016-02-22022 February 2016 (NAPS) - Issuance of Amendment for Changes to Technical Specification (TS) 3.8.1 - AC Sources, Operating Revised Surveillance Requirement ML15307A3002016-02-0202 February 2016 (NAPS) - Issuance of Amendments for Changes to the Emergency Action Level Revisions - Correction of Equipment Mark Number ML15245A4822015-10-0707 October 2015 Millstone Power Station, Surry Power Station, and North Anna Power Station - Issuance of Amendments to Revise the Cyber Security Milestone 8 Completion Date in the Renewed Facility Operating Licenses ML15133A3812015-06-16016 June 2015 Issuance of Amendments to Extended Type a Test Frequency to 15 Years ML15147A0292015-05-22022 May 2015 Proposed License Amendment Request (Lar), TS 3.8.1 - AC Sources - Operating, Revised Surveillance Requirement ML15083A4362015-05-14014 May 2015 Issuance of Amendments Regarding Alternate Control Rod Position Monitoring ML15041A6672015-02-0404 February 2015 Proposed License Amendment Request Re Alternate Control Rod Position Monitoring ML14188C4532014-08-27027 August 2014 Issuance of Amendments Regarding Modification of Control Bank Sequence and Overlap Technical Specifications ML14169A3592014-08-12012 August 2014 Stations, Units 1 and 2, Issuance of Amendments Regarding Addition of an Analytical Methodology to the Core Operating Limits Reports and an Increase to the Surry Minimum Temperature for Criticality ML14183B3182014-06-30030 June 2014 Proposed License Amendment Request Permanent Fifteen-Year Type a Test Interval ML13302B8922013-10-0202 October 2013 Technical Specification Bases ML12356A2982012-12-13013 December 2012 Supplemental Information for Proposed Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process. ML12219A0722012-07-30030 July 2012 Proposed Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process ML12136A4512012-05-11011 May 2012 Proposed License Amendment Request - Temporary Change to Allow Two Inoperable Demand Position Indicators Per Control Bank PLA-6842, Response to E-mail (Dated March 30, 2012), Request for Additional Information on Proposed Amendment Number 2812012-04-0202 April 2012 Response to E-mail (Dated March 30, 2012), Request for Additional Information on Proposed Amendment Number 281 ML1111900932011-04-27027 April 2011 License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation. ML1029804472010-10-21021 October 2010 Proposed License Amendment Request (LAR) Addition of Analytical Methodology to COLR Best-Estimate Large Break Loss of Coolant Accident (BE-LBLOCA) ML0935004002010-03-0303 March 2010 Issuance of Amendments to Adopt TSTF-490, Revision 0, Regarding Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Using the Consolidated Line Item Improvement Process ML0920503812009-07-23023 July 2009 License Amendment Request, One Time Extension of the Completion Time for 1 J - 480 Volt AC Distribution Subsystem ML0909000552009-03-26026 March 2009 License Amendment Request, Measurement Uncertainty Recapture Power Uprate ML0904004652009-02-0606 February 2009 License Amendment Request for Adoption of TSTF-511, Rev. 0, Eliminate Work Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 ML0815106502008-06-30030 June 2008 Technical Specifications, Issuance of Amendment Regarding One-Time 5-Year Extension to Type a Test Interval ML0735202472007-12-17017 December 2007 Proposed License Amendment Request, One-time Risk-Informed Extension to the Completion Time for EDG Fuel Oil Storage Tank Recoating ML0730604062007-10-31031 October 2007 Tech Spec Pages for Amendments 252 and 232 Control Room Habitability, Using the Technical Specification Task Force Traveler, TSTF-448, Revision 3 ML0730304002007-10-17017 October 2007 Tech Pages for Amendments 251 and 231 Technical Specification Change to Add Limiting Condition for Operation 3.0.8 on the Inoperability of Snubbers, Using the Consolidated Line Item Improvement Process, TSTF-372, Rev 4 ML0715001452007-05-29029 May 2007 Proposed License Amendment Request, Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0714104632007-05-21021 May 2007 Proposed License Amendment Request Addition of LCO 3.0.8 - Inoperability of Snubbers Using the Consolidated Line Item Improvement Process Technical Specification Improvement ML0702202192007-01-19019 January 2007 Technical Specifications Corrected Page for Amendment Nos. 249 and 229 ML0701003492007-01-0909 January 2007 Technical Specifications, Relocated the ASTM Standard Used to Test the Total Particulate Concentration of the Stored Fuel Oil from TS 5.5.12, Emergency Diesel Generator Fuel Oil Testing Program to a Licensee-controlled Program ML0634502592006-12-11011 December 2006 Tech Spec Pages for Amendments 249 and 229 Regarding Diesel Fuel Oil Testing Program ML0630000282006-10-16016 October 2006 Tech Spec Pages for Amendments 248 and 228 Regarding Consolidated Line Item Improvement Process for the Steam Generator Tube Integrity ML0627700182006-09-25025 September 2006 Technical Specification Bases Pages ML0620604672006-07-18018 July 2006 Technical Specifications, Issuance of Amendments on Changes to Analytical Methodology and Core Operating Limits Report, MC7526 and MC7527 ML0615101992006-05-30030 May 2006 Proposed Technical Specifications Change Diesel Fuel Oil Testing Program ML0533502792005-11-21021 November 2005 10 CFR 50.9 Correction of Information Provided to Support Technical Specification Change for Quench Spray and Recirculation Spray Nozzles Surveillance Frequency ML0529900852005-10-25025 October 2005 Enclosure, Technical Specifications, Amd MC7612, Equation for Over-Temperature Delta T Function Allowable Value ML0529900152005-10-24024 October 2005 Technical Specifications, Revised Test Frequency of P-4 Interlock Function ML0526301042005-09-15015 September 2005 Tech Spec Pages for Amendment Nos. 243 and 224, Revise the Administrative Controls Section ML0519604352005-07-14014 July 2005 Proposed Technical Specification Changes Correction to Equation for Overtemperature T Function Allowable Value ML0518900342005-07-0505 July 2005 Proposed Technical Specification Changes Addition of Analytical Methodology to COLR 2023-05-01 |