ML062060467

From kanterella
Jump to navigation Jump to search

Technical Specifications, Issuance of Amendments on Changes to Analytical Methodology and Core Operating Limits Report, MC7526 and MC7527
ML062060467
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 07/18/2006
From: Stephen Monarque
NRC/NRR/ADRO/DORL/LPLII-1
To: Christian D
Virginia Electric & Power Co (VEPCO)
Monarque, S R, NRR/DORL, 415-1544
Shared Package
ML062070187 List:
References
TAC MC7526, TAC MC7527
Download: ML062060467 (3)


Text

(2) Pursuant to the Act and 10 CFR Part 70, VEPCO to receive, possess, and use at any time special nuclear material as reactor fuel, In accordance with the limitations for storage and amounts required for reactor operation, as described in the Updated Final Safety Analysis Report; (3) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, VEPCO to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor Instrumentation and radiation monitoring equipment calibration, and as fission detectors In amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, VEPCO to receive, possess, and use In amounts as required any byproduct, source, or special nuclear material, without restriction to chemical or physical form, for sample analysis or Instrument calibration or associated with radioactive apparatus or component; and (5) Pursuant to the Act and 10 CFR Parts 30 and 70, VEPCO to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This renewed operating license shall be deemed to contain and is subject to the conditions specified In the following Commission regulations In 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; Is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter In effect; and Is subject to the additional conditions specified or Incorporated below:

(1) Maximum Power Level VEPCO Is authorized to operate the North Anna Power Station, Unit No. 1, at reactor core power levels not In excess of 2893 megawatts (thermal).

(2) Technical Specifications The Technical Specifications contained In Appendix A, as revised through Amendment No.' 24 7are hereby Incorporated In the renewed license.

The licensee shall operate the facility In accordance with the Technical Specifications..

Renewed License No. NPF-4 Amendment No. 247

(3) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, VEPCO to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor Instrumentation and radiation monitoring equipment calibration, and as fission detectors In amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, VEPCO to receive, possess, and use In amounts as required any byproduct, source, or special nuclear material, without restriction to chemical or physical form, for sample analysis or Instrument calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, VEPCO to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This renewed license shall be deemed to contain and is subject to the conditions specified In the Commission's regulations as set forth In 10 CFR Chapter Iand Is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter In effect; and is subject to the additional conditions specified or Incorporated below:

(1) Maximum Power Level VEPCO Is authorized to operate the facility at steady state reactor core power levels not In excess of 2893 megawatts (thermal).

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 2 2 7 are hereby Incorporated In the renewed license.

The licensee shall operate the facility In accordance with the Technical Specifications.

(3) Additional Conditions The matters specified In the following conditions shall be completed to the satisfaction of the Commission within the stated time periods following the Issuance of the condition or within the operational restrictions Indicated. The removal of these conditions shall be made by an amendment to the renewed license supported by a favorable evaluation by the Commission:

a. if VEPCO plans to remove or to make significant changes In the normal operation of equipment that controls the amount of radioactivity in effluents from the North Anna Power Station, the Renewed License No. NPF-7 Amendment No. 227

Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR)

b. (continued)
14. BAW-10199P-A, "The BWU Critical Heat Flux Correlations."
15. BAW-10170P-A, "Statistical Core Design for Mixing Vane Cores."
16. EMF-2103 (P)(A), "Realistic Large Break LOCA Methodology for Pressurized Water Reactors."
17. EMF-96-029 (P)(A), "Reactor Analysis System for PWRs."
18. BAW-10168P-A, "RSG LOCA - BWNT Loss-of-Coolant Accident Evaluation Model for Recirculating Steam Generator Plants,"

Volume II only (SBLOCA models).

19. DOM-NAF-2-A, "Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code," including Appendix A, "Qualification of the F-ANP BWU CHF Correlations in the Dominion VIPRE-D Computer Code."
c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.
d. The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.

5.6.6 PAM Report When a report is required by Condition B of LCO 3.3.3, "Post Accident Monitoring (PAM) Instrumentation," a report shall be submitted within the following 14 days. The report shall outline the cause of the inoperability, and the plans and schedule for restoring the instrumentation channels of the Function to OPERABLE status.

5.6.7 Steam Generator Tube Inspection Report

a. Following each inservice inspection of steam generator tubes, the number of tubes plugged in each steam generator shall be reported to the Nuclear Regulatory Commission within 15 days.

North Anna Units I and 2 5.6-4 Amendment Nos.

247, 227