Technical Specifications, Revised Test Frequency of P-4 Interlock Function
ML052990015
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 10/24/2005
From: Stephen Monarque
NRC/NRR/DLPM/LPD2
To: Christian D
Virginia Electric & Power Co (VEPCO)
Monarque, S R, NRR/DLPM, 415-1544
Shared Package
ML052300239 List:
References
TAC MC6301, TAC MC6302
Download: ML052990015 (3)


Text

ESFAS Instrumentation 3.3.2 SURVEILLANCE FREQUENCY SR 3.3.2.5 -------------------NOTE--------------------

Not required to be performed for SLAVE RELAYS if testing would:

1. Result in an inadvertent Reactor Trip System or ESFAS Actuation if accompanied by a single failure in the Safeguard Test Cabinet;
2. Adversely affect two or more components in one or more ESFAS system(s); or
3. Create a reactivity, thermal, or hydraulic transient condition in the Reactor Coolant System.

Perform SLAVE RELAY TEST. 92 days SR 3.3.2.6 ------------------- NOTE--------------------

Verification of relay setpoints not required.

Perform TADOT. 92 days SR 3.3.2.7 -------------------NOTE--------------------

Verification of setpoint not required for manual initiation or interlock functions. I Perform TADOT. 18 months SR 3.3.2.8 ------------------- NOTE-------------------

This Surveillahce shall include verification that the time constants are adjusted to the prescribed values.

Perform CHANNEL CALIBRATION. 18 months North Anna Units 1 and 2 3.3.2-6 Amendment Nos. 244/225

ESFAS Instrumentation 3.3.2 SURVEILLANCE FREQUENCY SR 3.3.2.9 ---- NOTE--------------------

Not required to be performed for the turbine driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after SG pressure is 2 1005 psig.

Verify ESFAS RESPONSE TIMES are within 18 months on a limit. STAGGERED TEST BASIS I

North Anna Units 1 and 2 3.3.2-7 Amendment Nos. 244/225

ESFAS Instrumentation 3.3.2 Table 3.3.2-1 (page 4 of 4)

Engineered Safety Feature Actuation System Instrumentation APPLICABLE MODES OR OTHER SPECIFIED REQUIRED SURVEILLANCE AL.LOWABLE FUNCT I ON CONDITIONS CHANNELS CONDITIONS REQUIREMENTS VALUE

6. Auxiliary Feedwater
a. Automatic Actuation Logic 1, 2. 3 2 trains G SR 3.3.2.2 NA and Actuation Relays SR 3.3.2.3 SR 3.3.2.5
b. SG Water Level-Low Low 1. 2, 3 3 per SG D SR 3.3.2.1 2 17%

SR 3.3.2.4 SR 3.3.2.8 SR 3.3.2.9

c. Safety Injection Refer to Function 1 (Safety Injection) for all initiation functions and requi rements.
d. Loss of Offslte Power 1. 2. 3 1 per bus, F SR 3.3.2.6 2 2184 V 2 buses SR 3.3.2.8 SR 3.3.2.9
e. Trip of all Main Feedwater 1. 2 2 per pump H SR 3.3.2.7 NA Pumps SR 3.3.2.9
7. Automatic Switchover to Containment Sunp
a. Automatic Actuation Logic 1, 2. 3, 4 2 trains C SR 3.3.2.2 NA and Actuation Relays SR 3.3.2.3 SR 3.3.2.5
b. Refuel Ing Water Storage Tank 1. 2, 3. 4 4 I SR 3.3.2.1 2 18.4% and (RWST) Level-Low Low SR 3.3.2.4 S 20.4%

SR 3.3.2.8 SR 3.3.2.9 Coincident with Safety Refer to Function 1 (Safety Injecti on) for all Initiation functions and Injection requl rements.

8. ESFAS Interlocks
a. Reactor Trip, P-4 1, 2. 3 1 per traIn. F SR 3.3.2.7 NA I 2 tra Ins
b. Pressurizer Pressure. P-11 1. 2. 3 3 j SR 3.3.2.1 S 2010 pslg SR 3.3.2.8
c. Tr-Low Low, P-12 1, 2. 3 1 per loop J SR 3.3.2.1 2 542'F and SR 3.3.2.8 S 545°F North Anna Units 1 and 2 3.3.2-11 Amendment Nos. 244/225