MONTHYEARML23072A0892023-05-0101 May 2023 (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML21232A2172021-10-19019 October 2021 Issuance of Amendment Nos. 288 and 271 to Revise Technical Specifications Battery Surveillance Testing ML21280A3282021-10-0707 October 2021 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions ML20325A0952021-03-19019 March 2021 Issuance of Amendment to Revise Technical Specifications to Allow Usage of a Small Break Loss of Coolant Accident Methodology (Non-Proprietary) ML20302A1792020-10-29029 October 2020 Non-Proprietary, Issuance of Amendment Nos. 286 and 269 to Revise Technical Specifications to Allow Usage of a Full Spectrum Loss of Coolant Accident Methodology ML19238A1272019-09-12012 September 2019 Issuance of Amendment Nos. 282 and 265 to Revise Technical Specifications Regarding Open Phase Protection ML19196A1102019-07-0909 July 2019 Attachments 2, 3 & 4 - Response to NRC Request for Additional Information and Correction of SBLOCA Analysis Error and Revised Marked-Up/Typed NAPS and SPS Technical Specifications Pages ML19156A2072019-05-24024 May 2019 Response to Request for Additional Information on Proposed License Amendment Request Open Phase Protection Per NRC Bulletin 2012-01 ML17187A1322017-06-28028 June 2017 Submittal of Topical Report VEP-NE-1, Revision 0.2-A, Relaxed Power Distribution Control Methodology and Associated Fq Surveillance Technical Specifications for Information Only ML16252A4782016-10-17017 October 2016 Issuance of Amendments Revising Technical Specifications to Address the Issue Identified in Westinghouse NSAL-09-5, Revision 1, and NSAL-15-1, Revision 0 ML16013A4442016-02-22022 February 2016 (NAPS) - Issuance of Amendment for Changes to Technical Specification (TS) 3.8.1 - AC Sources, Operating Revised Surveillance Requirement ML15307A3002016-02-0202 February 2016 (NAPS) - Issuance of Amendments for Changes to the Emergency Action Level Revisions - Correction of Equipment Mark Number ML15245A4822015-10-0707 October 2015 Millstone Power Station, Surry Power Station, and North Anna Power Station - Issuance of Amendments to Revise the Cyber Security Milestone 8 Completion Date in the Renewed Facility Operating Licenses ML15133A3812015-06-16016 June 2015 Issuance of Amendments to Extended Type a Test Frequency to 15 Years ML15147A0292015-05-22022 May 2015 Proposed License Amendment Request (Lar), TS 3.8.1 - AC Sources - Operating, Revised Surveillance Requirement ML15083A4362015-05-14014 May 2015 Issuance of Amendments Regarding Alternate Control Rod Position Monitoring ML15041A6672015-02-0404 February 2015 Proposed License Amendment Request Re Alternate Control Rod Position Monitoring ML14188C4532014-08-27027 August 2014 Issuance of Amendments Regarding Modification of Control Bank Sequence and Overlap Technical Specifications ML14169A3592014-08-12012 August 2014 Stations, Units 1 and 2, Issuance of Amendments Regarding Addition of an Analytical Methodology to the Core Operating Limits Reports and an Increase to the Surry Minimum Temperature for Criticality ML14183B3182014-06-30030 June 2014 Proposed License Amendment Request Permanent Fifteen-Year Type a Test Interval ML13302B8922013-10-0202 October 2013 Technical Specification Bases ML12356A2982012-12-13013 December 2012 Supplemental Information for Proposed Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process. ML12219A0722012-07-30030 July 2012 Proposed Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process ML12136A4512012-05-11011 May 2012 Proposed License Amendment Request - Temporary Change to Allow Two Inoperable Demand Position Indicators Per Control Bank PLA-6842, Response to E-mail (Dated March 30, 2012), Request for Additional Information on Proposed Amendment Number 2812012-04-0202 April 2012 Response to E-mail (Dated March 30, 2012), Request for Additional Information on Proposed Amendment Number 281 ML1111900932011-04-27027 April 2011 License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation. ML1029804472010-10-21021 October 2010 Proposed License Amendment Request (LAR) Addition of Analytical Methodology to COLR Best-Estimate Large Break Loss of Coolant Accident (BE-LBLOCA) ML0935004002010-03-0303 March 2010 Issuance of Amendments to Adopt TSTF-490, Revision 0, Regarding Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Using the Consolidated Line Item Improvement Process ML0920503812009-07-23023 July 2009 License Amendment Request, One Time Extension of the Completion Time for 1 J - 480 Volt AC Distribution Subsystem ML0909000552009-03-26026 March 2009 License Amendment Request, Measurement Uncertainty Recapture Power Uprate ML0904004652009-02-0606 February 2009 License Amendment Request for Adoption of TSTF-511, Rev. 0, Eliminate Work Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 ML0815106502008-06-30030 June 2008 Technical Specifications, Issuance of Amendment Regarding One-Time 5-Year Extension to Type a Test Interval ML0735202472007-12-17017 December 2007 Proposed License Amendment Request, One-time Risk-Informed Extension to the Completion Time for EDG Fuel Oil Storage Tank Recoating ML0730604062007-10-31031 October 2007 Tech Spec Pages for Amendments 252 and 232 Control Room Habitability, Using the Technical Specification Task Force Traveler, TSTF-448, Revision 3 ML0730304002007-10-17017 October 2007 Tech Pages for Amendments 251 and 231 Technical Specification Change to Add Limiting Condition for Operation 3.0.8 on the Inoperability of Snubbers, Using the Consolidated Line Item Improvement Process, TSTF-372, Rev 4 ML0715001452007-05-29029 May 2007 Proposed License Amendment Request, Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0714104632007-05-21021 May 2007 Proposed License Amendment Request Addition of LCO 3.0.8 - Inoperability of Snubbers Using the Consolidated Line Item Improvement Process Technical Specification Improvement ML0702202192007-01-19019 January 2007 Technical Specifications Corrected Page for Amendment Nos. 249 and 229 ML0701003492007-01-0909 January 2007 Technical Specifications, Relocated the ASTM Standard Used to Test the Total Particulate Concentration of the Stored Fuel Oil from TS 5.5.12, Emergency Diesel Generator Fuel Oil Testing Program to a Licensee-controlled Program ML0634502592006-12-11011 December 2006 Tech Spec Pages for Amendments 249 and 229 Regarding Diesel Fuel Oil Testing Program ML0630000282006-10-16016 October 2006 Tech Spec Pages for Amendments 248 and 228 Regarding Consolidated Line Item Improvement Process for the Steam Generator Tube Integrity ML0627700182006-09-25025 September 2006 Technical Specification Bases Pages ML0620604672006-07-18018 July 2006 Technical Specifications, Issuance of Amendments on Changes to Analytical Methodology and Core Operating Limits Report, MC7526 and MC7527 ML0615101992006-05-30030 May 2006 Proposed Technical Specifications Change Diesel Fuel Oil Testing Program ML0533502792005-11-21021 November 2005 10 CFR 50.9 Correction of Information Provided to Support Technical Specification Change for Quench Spray and Recirculation Spray Nozzles Surveillance Frequency ML0529900852005-10-25025 October 2005 Enclosure, Technical Specifications, Amd MC7612, Equation for Over-Temperature Delta T Function Allowable Value ML0529900152005-10-24024 October 2005 Technical Specifications, Revised Test Frequency of P-4 Interlock Function ML0526301042005-09-15015 September 2005 Tech Spec Pages for Amendment Nos. 243 and 224, Revise the Administrative Controls Section ML0519604352005-07-14014 July 2005 Proposed Technical Specification Changes Correction to Equation for Overtemperature T Function Allowable Value ML0518900342005-07-0505 July 2005 Proposed Technical Specification Changes Addition of Analytical Methodology to COLR 2023-05-01
[Table view] |
Text
ESFAS Instrumentation 3.3.2 SURVEILLANCE FREQUENCY SR 3.3.2.5 -------------------NOTE--------------------
Not required to be performed for SLAVE RELAYS if testing would:
- 1. Result in an inadvertent Reactor Trip System or ESFAS Actuation if accompanied by a single failure in the Safeguard Test Cabinet;
- 2. Adversely affect two or more components in one or more ESFAS system(s); or
- 3. Create a reactivity, thermal, or hydraulic transient condition in the Reactor Coolant System.
Perform SLAVE RELAY TEST. 92 days SR 3.3.2.6 ------------------- NOTE--------------------
Verification of relay setpoints not required.
Perform TADOT. 92 days SR 3.3.2.7 -------------------NOTE--------------------
Verification of setpoint not required for manual initiation or interlock functions. I Perform TADOT. 18 months SR 3.3.2.8 ------------------- NOTE-------------------
This Surveillahce shall include verification that the time constants are adjusted to the prescribed values.
Perform CHANNEL CALIBRATION. 18 months North Anna Units 1 and 2 3.3.2-6 Amendment Nos. 244/225
ESFAS Instrumentation 3.3.2 SURVEILLANCE FREQUENCY SR 3.3.2.9 ---- NOTE--------------------
Not required to be performed for the turbine driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after SG pressure is 2 1005 psig.
Verify ESFAS RESPONSE TIMES are within 18 months on a limit. STAGGERED TEST BASIS I
North Anna Units 1 and 2 3.3.2-7 Amendment Nos. 244/225
ESFAS Instrumentation 3.3.2 Table 3.3.2-1 (page 4 of 4)
Engineered Safety Feature Actuation System Instrumentation APPLICABLE MODES OR OTHER SPECIFIED REQUIRED SURVEILLANCE AL.LOWABLE FUNCT I ON CONDITIONS CHANNELS CONDITIONS REQUIREMENTS VALUE
- 6. Auxiliary Feedwater
- a. Automatic Actuation Logic 1, 2. 3 2 trains G SR 3.3.2.2 NA and Actuation Relays SR 3.3.2.3 SR 3.3.2.5
- b. SG Water Level-Low Low 1. 2, 3 3 per SG D SR 3.3.2.1 2 17%
SR 3.3.2.4 SR 3.3.2.8 SR 3.3.2.9
- c. Safety Injection Refer to Function 1 (Safety Injection) for all initiation functions and requi rements.
- d. Loss of Offslte Power 1. 2. 3 1 per bus, F SR 3.3.2.6 2 2184 V 2 buses SR 3.3.2.8 SR 3.3.2.9
- e. Trip of all Main Feedwater 1. 2 2 per pump H SR 3.3.2.7 NA Pumps SR 3.3.2.9
- 7. Automatic Switchover to Containment Sunp
- a. Automatic Actuation Logic 1, 2. 3, 4 2 trains C SR 3.3.2.2 NA and Actuation Relays SR 3.3.2.3 SR 3.3.2.5
- b. Refuel Ing Water Storage Tank 1. 2, 3. 4 4 I SR 3.3.2.1 2 18.4% and (RWST) Level-Low Low SR 3.3.2.4 S 20.4%
SR 3.3.2.8 SR 3.3.2.9 Coincident with Safety Refer to Function 1 (Safety Injecti on) for all Initiation functions and Injection requl rements.
- 8. ESFAS Interlocks
- a. Reactor Trip, P-4 1, 2. 3 1 per traIn. F SR 3.3.2.7 NA I 2 tra Ins
- b. Pressurizer Pressure. P-11 1. 2. 3 3 j SR 3.3.2.1 S 2010 pslg SR 3.3.2.8
- c. Tr-Low Low, P-12 1, 2. 3 1 per loop J SR 3.3.2.1 2 542'F and SR 3.3.2.8 S 545°F North Anna Units 1 and 2 3.3.2-11 Amendment Nos. 244/225