Category:Decommissioning Funding Plan DKTs 30
MONTHYEARML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24088A2352024-03-26026 March 2024 Decommissioning Funding Status Report ML24080A0702024-03-20020 March 2024 Decommissioning Trust Fund Annual Report ML23089A3722023-03-30030 March 2023 Decommissioning Funding Status Report ML23089A3852023-03-30030 March 2023 Decommissioning Funding Status Report ML23089A3642023-03-30030 March 2023 Decommissioning Funding Status Report ML23089A3042023-03-30030 March 2023 Decommissioning Fund Status Report ML22280A1702022-11-0202 November 2022 Connecticuts Decommissioning Funding Status Report for Millstone Power Station Docket No 50-245 ML22089A1862022-03-30030 March 2022 Decommissioning Fund Status Report ML22089A2432022-03-30030 March 2022 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants Letter of Attestation ML22010A0292021-12-31031 December 2021 Independent Spent Fuel Storage Installations (Isfsls) - 10 CFR 72.30 Decommissioning Funding Plan ML21354A8462021-12-14014 December 2021 North Ana Power Station Isfsls - 10 CFR 72.30 Decommissioning Funding Plan ML21355A2852021-12-14014 December 2021 ISFSI, 10 CFR 72.30 Decommissioning Funding Plan ML21355A2972021-12-14014 December 2021 ISFSI, 10 CFR 72.30 Decommissioning Funding Plan ML21091A0982021-03-26026 March 2021 Decommissioning Funding Status Report ML21084A8002021-03-25025 March 2021 Decommissioning Funding Status Report, Financial, Test and Independent Public Accountants' Letter of Attestation ML21085A5532021-03-25025 March 2021 Decommissioning Funding Status Report ML21085A5772021-03-25025 March 2021 Decommissioning Funding Status Report ML21085A5662021-03-25025 March 2021 Decommissioning Funding Status Report ML20087M4592020-03-26026 March 2020 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation ML20087M7152020-03-26026 March 2020 Decommissioning Funding Status Report ML19092A2672019-03-28028 March 2019 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation ML19092A2692019-03-27027 March 2019 Decommissioning Funding Status Report ML19092A2952019-03-26026 March 2019 Decommissioning Funding Status Report ML19092A2942019-03-26026 March 2019 Decommissioning Funding Status Report ML19092A2932019-03-26026 March 2019 Decommissioning Funding Status Report ML19003A1462018-12-31031 December 2018 Independent Spent Fuel Storage Installations (Isfsis) - Submittal of 10 CFR 72.30 Decommissioning Funding Plan ML18092A0822018-03-23023 March 2018 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation ML18092A0802018-03-21021 March 2018 Decommissioning Funding Status Report ML17271A0532017-09-29029 September 2017 2017 Summary of Annual Decommissioning Funding Status Reports for Reactors in Decommissioning ML17100A3082017-03-31031 March 2017 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation ML17093A6692017-03-30030 March 2017 2016 Decommissioning Funding Status Report ML17094A5222017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17094A5182017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17094A5202017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17086A0582017-03-28028 March 2017 Consultation Letter: Fws Response for Millstone (E-Mail 11-07-2016 from D. Simmons/Fws to R. Baum/Nrc/Nmss) ML16088A0892016-03-24024 March 2016 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation ML16085A3462016-03-24024 March 2016 Decommissioning Funding Status Report ML15099A3962015-03-30030 March 2015 Decommissioning Funding Status Report ML15092A1152015-03-30030 March 2015 Submittal of Decommissioning Funding Status Report ML15093A1012015-03-27027 March 2015 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants Letter of Attestation ML15093A1042015-03-26026 March 2015 Decommissioning Funding Status Report ML15093A1022015-03-26026 March 2015 Decommissioning Funding Status Report ML14098A2602014-03-31031 March 2014 Decommissioning Funding Status Report ML14098A2592014-03-31031 March 2014 Decommissioning Funding Status Report ML13098A0872013-03-28028 March 2013 Decommissioning Funding Status Report ML13091A0042013-03-27027 March 2013 Decommissioning Financial Assurance ML12353A0322012-12-13013 December 2012 10 CFR 72.30 Decommissioning Funding Plan ML12082A1782012-03-22022 March 2012 Decommissioning Funding Status Report ML1118101552011-06-14014 June 2011 Submittal of Decommissioning Funding Status Report: Response to Request for Addition Information 2024-09-16
[Table view] Category:40
MONTHYEARML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24088A2352024-03-26026 March 2024 Decommissioning Funding Status Report ML24080A0702024-03-20020 March 2024 Decommissioning Trust Fund Annual Report ML23089A3042023-03-30030 March 2023 Decommissioning Fund Status Report ML23089A3722023-03-30030 March 2023 Decommissioning Funding Status Report ML23089A3852023-03-30030 March 2023 Decommissioning Funding Status Report ML23089A3642023-03-30030 March 2023 Decommissioning Funding Status Report ML22280A1702022-11-0202 November 2022 Connecticuts Decommissioning Funding Status Report for Millstone Power Station Docket No 50-245 ML22089A2432022-03-30030 March 2022 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants Letter of Attestation ML22089A1862022-03-30030 March 2022 Decommissioning Fund Status Report ML22010A0292021-12-31031 December 2021 Independent Spent Fuel Storage Installations (Isfsls) - 10 CFR 72.30 Decommissioning Funding Plan ML21354A8462021-12-14014 December 2021 North Ana Power Station Isfsls - 10 CFR 72.30 Decommissioning Funding Plan ML21355A2972021-12-14014 December 2021 ISFSI, 10 CFR 72.30 Decommissioning Funding Plan ML21355A2852021-12-14014 December 2021 ISFSI, 10 CFR 72.30 Decommissioning Funding Plan ML21277A0652021-09-30030 September 2021 Proposed License Amendment Request Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer ML21091A0982021-03-26026 March 2021 Decommissioning Funding Status Report ML21085A5532021-03-25025 March 2021 Decommissioning Funding Status Report ML21084A8002021-03-25025 March 2021 Decommissioning Funding Status Report, Financial, Test and Independent Public Accountants' Letter of Attestation ML21085A5662021-03-25025 March 2021 Decommissioning Funding Status Report ML21085A5772021-03-25025 March 2021 Decommissioning Funding Status Report ML20244A3362020-08-31031 August 2020 Proposed License Amendment Request, Addition of Analytical Methodology to the Core Opera Ting Limits Report for a Full Spectrum Loss of Coolant Accident (Fsloca) Gamma Energy Redistribution Information ML20087M4592020-03-26026 March 2020 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation ML20087M7152020-03-26026 March 2020 Decommissioning Funding Status Report ML19248C7352019-09-0909 September 2019 CFR 50.69 License Amendment Request Pre-Submittal Meeting with NRC - September 9, 2019 ML19092A2672019-03-28028 March 2019 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation ML19092A2692019-03-27027 March 2019 Decommissioning Funding Status Report ML19092A2932019-03-26026 March 2019 Decommissioning Funding Status Report ML19092A2942019-03-26026 March 2019 Decommissioning Funding Status Report ML19092A2952019-03-26026 March 2019 Decommissioning Funding Status Report ML19003A1462018-12-31031 December 2018 Independent Spent Fuel Storage Installations (Isfsis) - Submittal of 10 CFR 72.30 Decommissioning Funding Plan ML18092A0822018-03-23023 March 2018 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation ML18092A0802018-03-21021 March 2018 Decommissioning Funding Status Report ML17271A0532017-09-29029 September 2017 2017 Summary of Annual Decommissioning Funding Status Reports for Reactors in Decommissioning ML17100A3082017-03-31031 March 2017 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation ML17094A5182017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17094A5222017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17093A6692017-03-30030 March 2017 2016 Decommissioning Funding Status Report ML17094A5202017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17086A0582017-03-28028 March 2017 Consultation Letter: Fws Response for Millstone (E-Mail 11-07-2016 from D. Simmons/Fws to R. Baum/Nrc/Nmss) ML16088A0892016-03-24024 March 2016 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation ML16085A3462016-03-24024 March 2016 Decommissioning Funding Status Report ML15092A1152015-03-30030 March 2015 Submittal of Decommissioning Funding Status Report ML15099A3962015-03-30030 March 2015 Decommissioning Funding Status Report ML15093A1012015-03-27027 March 2015 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants Letter of Attestation ML15093A1042015-03-26026 March 2015 Decommissioning Funding Status Report ML15093A1022015-03-26026 March 2015 Decommissioning Funding Status Report ML14183B3182014-06-30030 June 2014 Proposed License Amendment Request Permanent Fifteen-Year Type a Test Interval ML14098A2602014-03-31031 March 2014 Decommissioning Funding Status Report ML14098A2592014-03-31031 March 2014 Decommissioning Funding Status Report ML13098A0872013-03-28028 March 2013 Decommissioning Funding Status Report 2024-09-16
[Table view] Category:50
MONTHYEARML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24088A2352024-03-26026 March 2024 Decommissioning Funding Status Report ML24080A0702024-03-20020 March 2024 Decommissioning Trust Fund Annual Report ML23089A3722023-03-30030 March 2023 Decommissioning Funding Status Report ML23089A3852023-03-30030 March 2023 Decommissioning Funding Status Report ML23089A3642023-03-30030 March 2023 Decommissioning Funding Status Report ML23089A3042023-03-30030 March 2023 Decommissioning Fund Status Report ML22280A1702022-11-0202 November 2022 Connecticuts Decommissioning Funding Status Report for Millstone Power Station Docket No 50-245 ML22089A1862022-03-30030 March 2022 Decommissioning Fund Status Report ML22089A2432022-03-30030 March 2022 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants Letter of Attestation ML22010A0292021-12-31031 December 2021 Independent Spent Fuel Storage Installations (Isfsls) - 10 CFR 72.30 Decommissioning Funding Plan ML21354A8462021-12-14014 December 2021 North Ana Power Station Isfsls - 10 CFR 72.30 Decommissioning Funding Plan ML21355A2852021-12-14014 December 2021 ISFSI, 10 CFR 72.30 Decommissioning Funding Plan ML21355A2972021-12-14014 December 2021 ISFSI, 10 CFR 72.30 Decommissioning Funding Plan ML21091A0982021-03-26026 March 2021 Decommissioning Funding Status Report ML21084A8002021-03-25025 March 2021 Decommissioning Funding Status Report, Financial, Test and Independent Public Accountants' Letter of Attestation ML21085A5532021-03-25025 March 2021 Decommissioning Funding Status Report ML21085A5772021-03-25025 March 2021 Decommissioning Funding Status Report ML21085A5662021-03-25025 March 2021 Decommissioning Funding Status Report ML20087M4592020-03-26026 March 2020 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation ML20087M7152020-03-26026 March 2020 Decommissioning Funding Status Report ML19092A2672019-03-28028 March 2019 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation ML19092A2692019-03-27027 March 2019 Decommissioning Funding Status Report ML19092A2952019-03-26026 March 2019 Decommissioning Funding Status Report ML19092A2942019-03-26026 March 2019 Decommissioning Funding Status Report ML19092A2932019-03-26026 March 2019 Decommissioning Funding Status Report ML19003A1462018-12-31031 December 2018 Independent Spent Fuel Storage Installations (Isfsis) - Submittal of 10 CFR 72.30 Decommissioning Funding Plan ML18092A0822018-03-23023 March 2018 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation ML18092A0802018-03-21021 March 2018 Decommissioning Funding Status Report ML17271A0532017-09-29029 September 2017 2017 Summary of Annual Decommissioning Funding Status Reports for Reactors in Decommissioning ML17100A3082017-03-31031 March 2017 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation ML17093A6692017-03-30030 March 2017 2016 Decommissioning Funding Status Report ML17094A5222017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17094A5182017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17094A5202017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17086A0582017-03-28028 March 2017 Consultation Letter: Fws Response for Millstone (E-Mail 11-07-2016 from D. Simmons/Fws to R. Baum/Nrc/Nmss) ML16088A0892016-03-24024 March 2016 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation ML16085A3462016-03-24024 March 2016 Decommissioning Funding Status Report ML15099A3962015-03-30030 March 2015 Decommissioning Funding Status Report ML15092A1152015-03-30030 March 2015 Submittal of Decommissioning Funding Status Report ML15093A1012015-03-27027 March 2015 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants Letter of Attestation ML15093A1042015-03-26026 March 2015 Decommissioning Funding Status Report ML15093A1022015-03-26026 March 2015 Decommissioning Funding Status Report ML14098A2602014-03-31031 March 2014 Decommissioning Funding Status Report ML14098A2592014-03-31031 March 2014 Decommissioning Funding Status Report ML13098A0872013-03-28028 March 2013 Decommissioning Funding Status Report ML13091A0042013-03-27027 March 2013 Decommissioning Financial Assurance ML12353A0322012-12-13013 December 2012 10 CFR 72.30 Decommissioning Funding Plan ML12082A1782012-03-22022 March 2012 Decommissioning Funding Status Report ML1118101552011-06-14014 June 2011 Submittal of Decommissioning Funding Status Report: Response to Request for Addition Information 2024-09-16
[Table view] Category:70
MONTHYEARML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24088A2352024-03-26026 March 2024 Decommissioning Funding Status Report ML24080A0702024-03-20020 March 2024 Decommissioning Trust Fund Annual Report ML23089A3042023-03-30030 March 2023 Decommissioning Fund Status Report ML23089A3722023-03-30030 March 2023 Decommissioning Funding Status Report ML23089A3852023-03-30030 March 2023 Decommissioning Funding Status Report ML23089A3642023-03-30030 March 2023 Decommissioning Funding Status Report ML22280A1702022-11-0202 November 2022 Connecticuts Decommissioning Funding Status Report for Millstone Power Station Docket No 50-245 ML22089A2432022-03-30030 March 2022 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants Letter of Attestation ML22089A1862022-03-30030 March 2022 Decommissioning Fund Status Report ML22010A0292021-12-31031 December 2021 Independent Spent Fuel Storage Installations (Isfsls) - 10 CFR 72.30 Decommissioning Funding Plan ML21354A8462021-12-14014 December 2021 North Ana Power Station Isfsls - 10 CFR 72.30 Decommissioning Funding Plan ML21355A2972021-12-14014 December 2021 ISFSI, 10 CFR 72.30 Decommissioning Funding Plan ML21355A2852021-12-14014 December 2021 ISFSI, 10 CFR 72.30 Decommissioning Funding Plan ML21277A0652021-09-30030 September 2021 Proposed License Amendment Request Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer ML21091A0982021-03-26026 March 2021 Decommissioning Funding Status Report ML21085A5532021-03-25025 March 2021 Decommissioning Funding Status Report ML21084A8002021-03-25025 March 2021 Decommissioning Funding Status Report, Financial, Test and Independent Public Accountants' Letter of Attestation ML21085A5662021-03-25025 March 2021 Decommissioning Funding Status Report ML21085A5772021-03-25025 March 2021 Decommissioning Funding Status Report ML20244A3362020-08-31031 August 2020 Proposed License Amendment Request, Addition of Analytical Methodology to the Core Opera Ting Limits Report for a Full Spectrum Loss of Coolant Accident (Fsloca) Gamma Energy Redistribution Information ML20087M4592020-03-26026 March 2020 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation ML20087M7152020-03-26026 March 2020 Decommissioning Funding Status Report ML19248C7352019-09-0909 September 2019 CFR 50.69 License Amendment Request Pre-Submittal Meeting with NRC - September 9, 2019 ML19092A2672019-03-28028 March 2019 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation ML19092A2692019-03-27027 March 2019 Decommissioning Funding Status Report ML19092A2932019-03-26026 March 2019 Decommissioning Funding Status Report ML19092A2942019-03-26026 March 2019 Decommissioning Funding Status Report ML19092A2952019-03-26026 March 2019 Decommissioning Funding Status Report ML19003A1462018-12-31031 December 2018 Independent Spent Fuel Storage Installations (Isfsis) - Submittal of 10 CFR 72.30 Decommissioning Funding Plan ML18092A0822018-03-23023 March 2018 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation ML18092A0802018-03-21021 March 2018 Decommissioning Funding Status Report ML17271A0532017-09-29029 September 2017 2017 Summary of Annual Decommissioning Funding Status Reports for Reactors in Decommissioning ML17100A3082017-03-31031 March 2017 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation ML17094A5182017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17094A5222017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17093A6692017-03-30030 March 2017 2016 Decommissioning Funding Status Report ML17094A5202017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17086A0582017-03-28028 March 2017 Consultation Letter: Fws Response for Millstone (E-Mail 11-07-2016 from D. Simmons/Fws to R. Baum/Nrc/Nmss) ML16088A0892016-03-24024 March 2016 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation ML16085A3462016-03-24024 March 2016 Decommissioning Funding Status Report ML15092A1152015-03-30030 March 2015 Submittal of Decommissioning Funding Status Report ML15099A3962015-03-30030 March 2015 Decommissioning Funding Status Report ML15093A1012015-03-27027 March 2015 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants Letter of Attestation ML15093A1042015-03-26026 March 2015 Decommissioning Funding Status Report ML15093A1022015-03-26026 March 2015 Decommissioning Funding Status Report ML14183B3182014-06-30030 June 2014 Proposed License Amendment Request Permanent Fifteen-Year Type a Test Interval ML14098A2602014-03-31031 March 2014 Decommissioning Funding Status Report ML14098A2592014-03-31031 March 2014 Decommissioning Funding Status Report ML13098A0872013-03-28028 March 2013 Decommissioning Funding Status Report 2024-09-16
[Table view] Category:Letter
MONTHYEARIR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 ML24302A2402024-10-28028 October 2024 CFR 21 Report 1-BY-BC-1-LV Battery Charger IR 05000338/20240032024-10-28028 October 2024 – Integrated Inspection Report 05000338-2024003 and 05000339-2024003 ML24302A2342024-10-23023 October 2024 Request for Project Number Related to Dominion Energy Services New Nuclear Program at North Anna Power Station ML24302A1762024-10-22022 October 2024 Core Operating Limits Report Surry 2 Cycle 33 Pattern Hot Revision 0 ML24289A0152024-10-21021 October 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report 05000423/LER-2024-001, Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary2024-10-14014 October 2024 Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary ML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D IR 05000336/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000336/2024402 and 05000423/2024402 (Cover Letter Only) ML24281A1102024-10-0707 October 2024 Requalification Program Inspection ML24281A1372024-10-0707 October 2024 ISFSI - Submittal of Cask Registration for Spent Fuel Storage ML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 05000423/LER-2023-006-02, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-09-26026 September 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) 05000338/LER-2024-001-01, Automatic Reactor Trip Due to Prni High Negative Rate2024-09-24024 September 2024 Automatic Reactor Trip Due to Prni High Negative Rate IR 05000338/20244202024-09-23023 September 2024 Security Baseline Inspection Report 05000338/2024420 and 05000339/2024420, Cover Letter ML24243A0872024-09-20020 September 2024 Response to EPA Comments Regarding the Final Site Specific Supplement to the Generic Eist for License Renewal North Anna Power Station, Units 1 and 2 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000338/20244022024-09-17017 September 2024 Security Baseline Inspection Report 05000338/2024402 and 05000339/2024402 ML24260A1952024-09-16016 September 2024 Response to Request for Additional Information Regarding Proposed Amendment to Support Implementation of Framatome Gaia Fuel ML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24248A2272024-09-0404 September 2024 Operator Licensing Examination Approval ML24240A1532024-09-0303 September 2024 Summary of Regulatory Audit Supporting the Review of License Amendment Request for Implementation of Framatome Gaia Fuel ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000336/20240052024-08-29029 August 2024 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Reports 05000336/2024005 and 05000423/2024005 ML24215A2622024-08-28028 August 2024 Transmittal Letter for Subsequent Renewed License IR 05000338/20240052024-08-27027 August 2024 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2024005 and 05000339/2024005) IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, IR 05000305/20240022024-08-22022 August 2024 NRC Inspection Report 05000305/2024002 ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance 05000339/LER-2024-001-01, Loss of Generator Field for 2J Eog During 2-PT-82.282024-08-20020 August 2024 Loss of Generator Field for 2J Eog During 2-PT-82.28 ML24234A0742024-08-15015 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-23-63, NEI 03-08 Needed Guidance: PWR Thermal Shield Flexure Inspection Requirements IR 05000336/20240022024-08-13013 August 2024 Integrated Inspection Report 05000336/2024002 and 05000423/2024002 IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) ML24221A1932024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Upper Mattaponi Tribe ML24221A1912024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Rappahannock Tribe, Inc ML24221A1862024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Band of Cherokee Indians ML24221A1882024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Monacan Indian Nation ML24221A1872024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Shawnee Tribe of Oklahoma ML24221A1852024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Tribe of Indians ML24221A1842024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Nation, Oklahoma ML24221A1832024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Chickahominy Indian Tribe-Eastern Division ML24221A1822024-08-0808 August 2024 Tribal Section 106 Letters - North Anna - Chickahominy Indian Tribe ML24221A1812024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Catawba Indian Nation ML24208A0142024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-Absentee-Shawnee Tribe of Indians of Oklahoma ML24206A0062024-08-0808 August 2024 Notice of Availability of the Final Environmental Impact Statement for the North Anna Nuclear Power Station Unit Numbers 1 and 2 Subsequent License Renewal (Docket Numbers: 50-338 and 50-339) ML24206A0052024-08-0808 August 2024 SLR Final EIS Letter to Achp 2024-09-04
[Table view] |
Text
Dominion Resources Services, Inc.
- (1(10 Dominion Boulevard, Glen Allen, VA 2,'('(,{!
March 30, 2009
\Xc'!) ;\ddress: www.dom.com United States Nuclear Regulatory Commission Serial No.09-038 Attention: Document Control Desk NL&OSITJS R3 Washington, D. C. 20555-0001 Docket Nos. 50-280,281 50-338,339 50-245,336,423 50-305 License Nos. DPR-32,37 NPF-4,7 DPR-21, 65 NPF-49 DPR-43 VIRGINIA ELECTRIC AND POWER COMPANY DOMINION NUCLEAR CONNECTICUT, INC.
DOMINION ENERGY KEWAUNEE, INC.
SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 MILLSTONE POWER STATION UNITS 1, 2 AND 3 KEWAUNEE POWER STATION DECOMMISSIONING FUNDING STATUS REPORT Pursuant to 10 CFR 50.75(f)(1), Virginia Electric and Power Company (Dominion),
Dominion Nuclear Connecticut, Inc. (DNC) and Dominion Energy Kewaunee, Inc. (DEK) are providing this report on the status of decommissioning funding for each of the eight nuclear power reactors referenced above. provides the following information for North Anna Power Station (NAPS) and Surry Power Station (SPS):
Table I - NRC Minimum Financial Assurance Amount as of 12/31/2008 Table II - Allocated Radiological Funds Held in External Trusts at 12/31/2008 Table 111- Current Annual Funding Levels Table IV- NRC Minimum Financial Assurance Summary Table Present Value & Future Value provides the following information for Millstone Power Station (MPS) Units 2 & 3:
Table I - NRC Minimum Financial Assurance Amount as of 12/31/2008 Table II - Funds Held in External Trusts as of 12/31/2008 Table 111- Current Annual Funding Levels Table IV- NRC Minimum Financial Assurance Summary Table Present Value & Future Value
Serial No.09-038 Docket Nos. 50-280/281, 338/339, 245/336/423, 305 Page 2 of 4 Attachment 3 provides the following information for MPS Unit 1:
Decommissioning Funding Status Report for Millstone Unit 1 Updated Decommissioning Funding Worksheet as of 12131/2008 Attachment 4 provides the following information for Kewaunee Power Station (KPS):
Table I - NRC Minimum Financial Assurance Amount as of 12/31/2008 Table II - Funds Held in External Trusts as of 12/31/2008 Table 111- Current Annual Funding Levels Table IV- NRC Minimum Financial Assurance Amounts Present Value & Future Value Since the previous submittal of March 29, 2007, there have been no material changes to trust agreements established for nuclear decommissioning of the SPS, NAPS, MPS, or KPS units.
Please contact Mr. David A. Sommers at (804) 273-2823 if you have any questions or require additional information.
Sincerely,
. -~J~;; .
Leslie N. Hartz if Vice President Nuclear Support Services Virginia Electric and Power Company Dominion Nuclear Connecticut, Inc.
Dominion Energy Kewaunee, Inc.
Attachments:
Attachment 1- NAPS and SPS Decommissioning Financial Assurance Attachment 2- MPS Units 2 and 3 Decommissioning Financial Assurance Attachment 3 MPS Unit 1 Annual Decommissioning Funding Worksheet Attachment 4- KPS Decommissioning Financial Assurance Commitments made in this letter: None
Serial No.09-038 Docket Nos. 50-280/281, 338/339, 245/336/423, 305 Page 3 of 4 cc: U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W., Suite 23T85 Atlanta, GA 30303-8931 U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 U. S. Nuclear Regulatory Commission Region III 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4351 NRC Senior Resident Inspector Surry Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector Kewaunee Power Station Ms. C. J. Sanders NRC Project Manager (MPS Units 2 & 3)
U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 0-8 83 Rockville, MD 20852-2738 Mr. J. 8. Hickman NRC Project Manager (MPS Unit 1)
U. S. Nuclear Regulatory Commission Two White Flint North Mail Stop 0-8 F5 11545 Rockville Pike Rockville, MD 20852-2738
Serial No.09-038 Docket Nos. 50-280/281, 338/339, 245/336/423, 305 Page 4 of 4 Ms. D. N. Wright NRC Project Manager (NAPS and SPS)
U. S. Nuclear Regulatory Commission, Mail Stop 0-8 H4A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. J. F. Stang, Jr NRC Project Manager U. S. Nuclear Regulatory Commission, Mail Stop 0-8 G9A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. P. S. Tam NRC Project Manager (KPS)
U. S. Nuclear Regulatory Commission, Mail Stop 0-8 H4A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. J. E. Reasor, Jr.
Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.
Suite 300 Glen Allen, VA 23060 Mr. Joseph Roy Massachusetts Municipal Wholesale Electric Co.
Moody Street, P. O. Box 426 Ludlow, MA 01056 Mr. Stephen Page Central Vermont Public Service Corp.
77 Grove Street Rutland, VT 05701
Attachment 1 Serial No.09-038 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 DECOMMISSIONING FINANCIAL ASSURANCE Nuclear Decommissioning Financial Assurance as of 12/31/08
Serial No.09-038 Attachment 1 VIRGINIA ELECTRIC AND POWER COMPANY Nuclear Decommissioning Financial Assurance as of 12/31/08 I ISerial No.09-038 (Dominion)
Attachment 1 I VIRGINIA ELECTRIC AND POWER COMPANY Nuclear Decommissioning Financial Assurance as of 12/3112008 I Table I: page 1 of 3 NRC Minimum Financial Assurance Amount as of 12131/2008 (Millions of Dollars)
(see note 1) (see note 1)
Surry Surry North Anna North Anna Customer Unit 1 Unit2 Unil1 Unit 2 Total Classification DPR-32 DPR-37 NPF-4 NPF-7 All Units Virginia State Corporation Commission (VSCC) $ 290.84 $ 290.84 $ 284.06 $ 284.06 $ 1.149.79 Company Contribution $ - $ $ - $ - $ -
North Carolina Utilities Commission $ 17.29 $ 17.29 $ 16.17 $ 16.17 $ 66.92 Federal Energy RegUlatory Commission $ 21.19 $ 21.19 $ 9.15 $ 9.15 $ 60.67 Virginia Retail (not underVSCC jurisdiction) $ 44.02 $ 44.02 $ 42.77 $ 42.77 $ 173.58 Unallocated $ 774 $ 774 $ (134) $ (134) $ 1279 Total $ 381.1 $ 381.1 $ 350.8 $ 350.8 $ 1,463.8 Table II:
Allocated Radiological Funds Held In Extemal Trusts at 12/31/2008 (Millions of Dollars)
(see note 2) (see nole 2) (see notes 1 & 2) (see notes 1 & 2)
Surry Surry North Anna North Anna Customer Unit 1 Unit 2 Unit 1 Unit 2 Total Classification DPR-32 DPR-37 NPF-4 NPF-7 All Units Virginia State Corporation Commission (VSCC) $ 160.6 $ 157.3 $ 140.8 $ 135.3 $ 594.0 Company Contribution $ 0.8 $ 0.9 $ 0.2 $ 0.2 $ 2.1 North Carolina Utilities Commission $ 9.9 $ 11.4 $ 11.1 $ 10.7 $ 43.0 Federal Energy Regulatory Commission $ 7.8 $ 8.8 $ 2.3 $ 2.2 $ 21.2 Virginia Retail (not underVSCC jurisdiction) $ 22.7 $ 25.1 $ 22.5 $ 21.3 $ 91.7 Unallocated $ - $ - $ - $ - $ -
Total $ 201.9 $ 203.5 $ 176.9 $ 169.7 $ 752.0 Page 1 of 3
Serial No.09-038 Attachment 1 VIRGINIA ELECTRIC AND POWER COMPANY Nuclear Decommissioning Financial Assurance as of 12/31/08 ISerial No.09-038 (Dominion)
Attachment 1 I
I VIRGINIA ELECTRIC AND POWER COMPANY I Nuclear Decommissioning Financial Assurance as of 1213112008 Table III: page 2 of 3 Current Annual Funding Levels (Millions of Dollars)
(see note 1 ) (see note 1 )
Surry Surry North Anna North Anna Customer Unit 1 Unit2 Unit 1 Unit 2 Total Classification DPR-32 DPR-37 NPF-4 NPF-7 All Units IMginia Stale Corporation Commission (VSCC) $ - $ - $ $ $ -
Company Contribution $ 0.2 $ 0.3 $ 0.1 $ 0.0 $ 0.6 North Carolina Utilities Commission $ - $ - $ - $ $ -
Federal Energy Regulatory Commission $ 0.2 $ 0.3 $ 0.2 $ 0.2 $ 0.9
~rginia Retail (not underVSCC jurisdiction) $ 0.9 $ 1.0 $ 0.8 $ 0.7 $ 3.4 Unallocaled $ - $ - $ - $ - $
Total $ 1.4 $ 1.5 $ 1.0 $ 1.0 $ 4.8 Page 2 of 3
Serial No.09-038 Attachment 1 VIRGINIA ELECTRIC AND POWER COMPANY Nuclear Decommissioning Financial Assurance as of 12/31/08 Iserial No.09-038 (Dominion)
Attachment 1 I
VIRGINIA ELECTRIC AND POWER COMPANY Nuclear Decommissioning Financial Assurance as of 12/3112008 I Table IV: page 3 of 3 NRC Minimum Financial Assurance Summary Table Present Value & Future Value (Millions of Dollars ~ except percentages and years)
(see note 1) (see note 1)
Surry Surry North Anna North Anna Customer Unit 1 Unit2 Unit 1 Unit 2 Total Classification DPR-32 DPR*37 NPF*4 NPF*7 All Units External External External External Method for Providing Finandal Assurance Sinking Fund Sinking Fund Sinking Fund Sinking Fund NRC Minimum Amounts as of 1213112008 $ 381.1 $ 381.1 $ 350.8 $ 350.8 $ 1,463.8 Funds in Extemal Trusts as of 12131/2008 $ 296.4 $ 291.5 $ 239.0 $ 225.6 $ 1,052.6 (See Note 2)
Allocated Radiological Funds in Extemal Trusts as of 1213112008 $ 201.9 $ 203.5 $ 176.9 $ 169.7 $ 752.0 (See Notes 2 & 3)
Allocated Radiological Funds in Extemal Trusts as of 1213112008 Minus NRC Minimum Amount as of 1213112008 $ (179.2) $ (177.6) $ (173.9) $ (181.1) $ (711.8)
(See Notes 3 & 4)
Annual Trust Funds Eamings Rate (After Tax & Fees - assumes 2% Real Rate of Return) 2.00% 2.00% 2.00% 2.00%
Year That Operating License Expires (Reflects Ucense Renewal for Suny and North Anna) 2032 2033 2038 2040 Allocated Radiological Funds in excess or (underfunded) to NRC Minimum In Future Dollars (3.5 years after start of Decommissioning) $ 4.4 $ 21.8 $ 30.3 $ 30.3 $ 86.7 (See Notes 3, 4 & 5)
Notes:
(1) The Norlh Anna Power Station is jointly owned by Virginia Electric and Power Company (88.4%) and Old Dominion Elecllic Cooperative (11.6%). However, Virginia Electric and Power Company is responsible for (89.26%) of the Decommissioning obligation. The amounts stated in the above tables reflect only that portion ofthe Decommissioning obligation attributable to Virginia Electric and Power Company.
(2) The total Trust balances since the March 29,2007 filing have deaeased. This decrease is due solely to the economic downturn and the resultant losses in fund value.
(3) The Allocated Radiological Funds amounts shown excludes amounts designated for the future Deconmissioning of the Independent Spent Fuel Storage Installations(ISFSls),
spent fuel management, and non-radiological decommissioning.
(4) Negative amounts indicate that the value of Trust funds are less than the value of the NRC Minimum for the period indicated.
(5) The Future Value calculation for Surry and North Anna reflects 2% Real Rate of Return applied from 11112009 to 3.5 years after start of Decommissioning Page 3 of 3
Attachment 2 Serial No.09-038 DOMINION NUCLEAR CONNECTICUT, INC. (DNC)
MILLSTONE POWER STATION UNITS 2 AND 3 DECOMMISSIONING FINANCIAL ASSURANCE Nuclear Decommissioning Financial Assurance as of 12/31/08
Serial No.09-038 Attachment 2 DOMINION NUCLEAR CONNECTICUT, INC.
Nuclear Decommissioning Financial Assurance as of 12/31/08 Dominion Nuclear Connecticut, Inc.
I Serial No.09-038 (DNC)
Attachment 2 I Millstone Power Station Nuclear Decommissioning Financial Assurance as of 1213112008 Table I: page 1 of 3 NRC Minimum Financial Assurance Amount as of 1213112008 (Millions of Dollars)
(see Note 5) (See Note 1)
MPS MPS MPS Unit 1 Unlt2 Unit 3 Total U3 Ownership DPR*21 DPR-65 NPF-49 U2&U3 Ownership %
Dominion Nudear Connecticut, lne. nla $ 401.2 $ 398.7 $ 799.8 93.47%
Central Vermont PSC nla nla $ 7.4 $ 7.4 1.73%
Massachusetts Municipal WEC nla nla $ 20.5 $ 20.5 4.80%
Total nla S 401.2 S 426.5 S 827.7 100.00%
Table II:
Funds Held In External Trusts as of 12/31/2008 (Millions of Dollars)
(see Note 5) (see Note 1)
MPS MPS MPS Unit 1 Unit 2 Unit 3 Total U3 Ownership DPR*21 DPR-65 NPF-49 U2&U3 Ownership %
Dominion Nudear Connecticut, Inc. nla $ 290.9 $ 286.9 $ 577.8 93.47%
Central Vermont PSC nla nla $ 4.2 $ 4.2 1.73%
Massachusetts Municipal WEC nla nla $ 16.2 $ 16.2 4.80%
Total (see no'. 2 nla $ 290.9 $ 307.3 $ 598.2 100.00%
Page 1 of 3
Serial No.09-038 Attachment 2 DOMINION NUCLEAR CONNECTICUT, INC.
Nuclear Decommissioning Financial Assurance as of 12/31/08 I Serial No.09-038 (DNC)
Attachment 2 I Dominion Nuclear Connecticut, Inc.
Millstone Power Station Nuclear Decommissioning Financial Assurance as of 12131/2008 Table III: page 2 of 3 Current Annual Funding Levels (Millions of Dollars)
(See Note 5) (See Note 1)
MPS MPS MPS Unit 1 Unit 2 Unit 3 Total U3 Ownership DPR*21 DPR-65 NPF-49 U2&U3 Ownership %
Dominion Nudear Connecticut, Inc. nfa $ - $ - $ 93.47%
Central Vermont PSC nfa $ - $ - $ - 1.73%
Massachusetts Municipal WEC nfa $ - $ - $ - 4.80%
Total nla $ . $ . $ 100.00%
Page 2 of 3
Serial No.09-038 Attachment 2 DOMINION NUCLEAR CONNECTICUT, INC.
Nuclear Decommissioning Financial Assurance as of 12/31/08 I Serial No. 09.{)38 (DNG)
Attachment 2 I Dominion Nuclear Connecticut, Inc.
Millstone Power Station Nuclear Decommissioning Financial Assurance as of 12/31/2008 Table IV: page 3 of 3 NRC Minimum Financial Assurance Summary Table Present Value & Future Value (Millions of Dollars - except percentage and years)
(See Note 5) (See Note 1)
MPS MPS MPS Unit 1 Unit 2 Unit 3 Total Ownership DPR*21 DPR-65 NPF-49 U2&U3 Method for Providing Financial Assurance nla Pre-payment Pre-payment NRC Minimum Amounts as of 1213112008 nla $ 401.2 $ 426.5 $ 827.7 Funds in Extemal Trusts as of 12131/2008 (See note 2) nla $ 290.9 $ 307.3 $ 598.2 Funds in External Trusts as of 1213112008 Minus NRC Minimum Amounts as of 1213112008 (See notes 2 & 3) nla $ (110.2) $ (119.2) $ (229.5)
Annual Trust Funds Eamings Rate (After Tax & Fees - assumes 2% Real Rate of Return) nla 2.00% 2.00%
Year That Operating License Expires Retired (Reflects License Renewal for Unit 2 and Unit 3) 1998 2035 2045 Funds in excess or (underfunded) to NRC Minimum In Future Dollars (3.5 years after start of Decommissioning) nla $ 120.6 $ 245.3 $ 365.9 (see notes 3 & 4)
Noles:
(1) Millstone Unit3 is jointly owned by Dominion Nuclear Connecticut, Inc.(93.4707%), Central Vermont PSC (1.7303%) and Massachusetts MlJ1icipal \/VEe (4.7990%).
(2) The External Trust FlI1ds shown reflect the total amount of funds in the Trusts, all of which are available for Radiological Decommissioning. The total of the Trusts since the March 29, 2007 filing have decreased. This decrease is due solely to the economic downturn and the resultant losses in Trust FlJ"ld value.
(3) Negative amounts indicate that the value of Trust funds are less than the value of the NRC Minimum for the period irdicated.
(4) The Future Value caleuation for Miilstone U2 and U3 reflects 2% Real Rale of Return applied from 1/1/2009 to 3.5 years after star! of Decommissioning.
(5) The MPS Unit 1 Decommissioning Furding Worksheet is shown as a separate atta:hment.
Page 3 of 3
Attachment 3 Serial No.09-038 DOMINION NUCLEAR CONNECTICUT, INC. (DNC)
MILLSTONE POWER STATION UNIT 1 DECOMMISSIONING FUNDING WORKSHEET Nuclear Decommissioning Financial Assurance as of 12/31/08
Serial No.09-038 Attachment 3 DOMINION NUCLEAR CONNECTICUT, INC.
Nuclear Decommissioning Financial Assurance as of 12/31/08 Decommissioning Funding Status Report for Millstone Unit 1 Updated Decommissioning Funding Worksheet as of 12/31/2008 (in Millions)
Decommissionin Cost Estimate
$ 404.849 Remaining Decommissioning cost estimate in : 1/1/2009 Dollars Decommissioninq Trust Funds
$ 243.686 Unit 1 Qualified Fund Balance as of. 12/31/2008
$ - Unit 1 Non-Qualified Fund Balance as of. 12/31/2008
$ 243.686 Total Decommissioning Fund Balance as of: 12/31/2008 Decommissioning Annual Expenditures (2009 - 2027)
$ 3.869 SAFSTOR monitoring (2009-2027) amount in: 1/1/2009 Dollars
$ 0.826 Decommissioning activities (2009-2027) amount in: 1/1/2009 Dollars
$ 4.695 Total Annual Expenditures (2009-2027) amount in: 1/1/2009 Dollars Inputs 2009 Start year of Analysis 4.02% Escalation Rate 6.02% After Tax EarninQs - LonQ Term (assumes 2% Real Rate of Return)
Page 1 of 2
Serial No.09-038 Attachment 3 DOMINION NUCLEAR CONNECTICUT, INC.
Nuclear Decommissioning Financial Assurance as of 12/31/08 2008 Energy Solutions (vendor) Cost Study Estimate Basis - Remaining Decom Costs (in FV Millions $)
Beginning End Remaining of Projected of Unit 1 Decom Year Projected Unit 1 Expenditures Year Expenditures Year Balance Earnings (in future $) Balance in 1/1/2009 $
2009 $ 243.686 $ 14.537 $ 4.695 $ 253.529 $ 4.695 2010 $ 253.529 $ 15.124 $ 4.884 $ 263.769 $ 4.695 2011 $ 263.769 $ 15.735 $ 5.080 $ 274.424 $ 4.695 2012 $ 274.424 $ 16.371 $ 5.285 $ 285.510 $ 4.695 2013 $ 285.510 $ 17.032 $ 5.497 $ 297.045 $ 4.695 2014 $ 297.045 $ 17.721 $ 5.719 $ 309.047 $ 4.695 2015 $ 309.047 $ 18.437 $ 5.949 $ 321.535 $ 4.695 2016 $ 321.535 $ 19.182 $ 6.188 $ 334.528 $ 4.695 2017 $ 334.528 $ 19.957 $ 6.437 $ 348.048 $ 4.695 2018 $ 348.048 $ 20.763 $ 6.696 $ 362.115 $ 4.695 2019 $ 362.115 $ 21.602 $ 6.966 $ 376.752 $ 4.695 2020 $ 376.752 $ 22.476 $ 7.246 $ 391.982 $ 4.695 2021 $ 391.982 $ 23.384 $ 7.537 $ 407.829 $ 4.695 2022 $ 407.829 $ 24.330 $ 7.841 $ 424.318 $ 4.695 2023 $ 424.318 $ 25.313 $ 8.156 $ 441.475 $ 4.695 2024 $ 441.475 $ 26.337 $ 8.484 $ 459.328 $ 4.695 2025 $ 459.328 $ 27.402 $ 8.826 $ 477.904 $ 4.695 2026 $ 477.904 $ 28.510 $ 9.181 $ 497.234 $ 4.695 2027 $ 497.234 $ 29.664 $ 9.550 $ 517.347 $ 4.695 2028 $ 517.347 $ 29.820 $ 44.581 $ 502.587 $ 21.069 2029 $ 502.587 $ 30.202 $ 2.371 $ 530.418 $ 1.077 2030 $ 530.418 $ 31.876 $ 2.467 $ 559.827 $ 1.077 2031 $ 559.827 $ 33.644 $ 2.566 $ 590.906 $ 1.077 2032 $ 590.906 $ 35.513 $ 2.669 $ 623.750 $ 1.077 2033 $ 623.750 $ 37.488 $ 2.776 $ 658.462 $ 1.077 2034 $ 658.462 $ 39.576 $ 2.893 $ 695.145 $ 1.079 2035 $ 695.145 $ 41.782 $ 3.008 $ 733.920 $ 1.078 2036 $ 733.920 $ 44.114 $ 3.136 $ 774.898 $ 1.081 2037 $ 774.898 $ 46.579 $ 3.251 $ 818.226 $ 1.077 2038 $ 818.226 $ 49.185 $ 3.382 $ 864.029 $ 1.077 2039 $ 864.029 $ 51.940 $ 3.518 $ 912.451 $ 1.077 2040 $ 912.451 $ 54.852 $ 3.659 $ 963.643 $ 1.077 2041 $ 963.643 $ 57.931 $ 3.806 $ 1,017.768 $ 1.077 2042 $ 1,017.768 $ 61.187 $ 3.959 $ 1,074.996 $ 1.077 2043 $ 1,074.996 $ 64.597 $ 5.177 $ 1,134.417 $ 1.354 2044 $ 1,134.417 $ 67.413 $ 30.515 $ 1,171.315 $ 7.672 2045 $ 1,171.315 $ 69.646 $ 30.186 $ 1,210.774 $ 7.296 2046 $ 1,210.774 $ 72.793 $ 4.627 $ 1,278.940 $ 1.075 2047 $ 1,278.940 $ 76.893 $ 4.828 $ 1,351.005 $ 1.078 2048 $ 1,351.005 $ 81.228 $ 5.021 $ 1,427.212 $ 1.078 2049 $ 1,427.212 $ 85.812 $ 5.223 $ 1,507.800 $ 1.078 2050 $ 1,507.800 $ 90.660 $ 5.433 $ 1,593.027 $ 1.078 2051 $ 1,593.027 $ 95.787 $ 5.652 $ 1,683.162 $ 1.078 2052 $ 1,683.162 $ 100.415 $ 32.245 $ 1,751.333 $ 5.913 2053 $ 1,751.333 $ 93.476 $ 398.992 $ 1,445.817 $ 70.334 2054 $ 1,445.817 $ 68.520 $ 616.590 $ 897.747 $ 104.488 2055 $ 897.747 $ 47.182 $ 228.909 $ 716.020 $ 37.291 2056 $ 716.020 $ 36.328 $ 225.861 $ 526.487 $ 35.371 2057 $ 526.487 $ 31.058 $ 21.750 $ 535.795 $ 3.274 2058 $ 535.795 $ 32.269 $ 0.180 $ 567.884 $ 0.026 2059 $ 567.884 $ 34.206 $ 0.025 $ 602.065 $ 0.004 2060 $ 602.065 $ - $ - $ -
......,.,... U1.,.,."",......""" 1I1QOO9IIYO"'~ .,....,
Remaining U1 expenditures (in future $) " : * ,
Estimated Funds at end of Decommissioning (In 1/112009 $) " '
Page 2 of 2
Attachment 4 Serial No.09-038 DOMINION ENERGY KEWAUNEE, INC. (DEK)
KEWAUNEE POWER STATION DECOMMISSIONING FINANCIAL ASSURANCE Nuclear Decommissioning Financial Assurance as of 12/31/08
Serial No.09-038 Attachment 4 DOMINION ENERGY KE\"IAUNEE, INC.
Nuclear Decommissioning Financial Assurance as of 12131/2008 Dominion Energy KewauneE!, Inc. (DEK)
I Serial No. 09*038 (DEK)
Attachment 4 Kewaunee Power Station Nuclear Decommissioning Financial AssLlrance as of 12131/2008 Table I: page 1013 NRC Minimum Financial Assurance Amount as of 12/31/2008 (Millions of Dollars)
Kewaunee Total Ownership DPR-43 Kewaunee Dominion Energy Kewaunee, Inc. S 359.1 $ 359.1 Total $ 359.1 $ 359.1 Table II:
Funds Held in External Trusts as of 12/3112008 (Millions of Dollars)
Kewaunee Total Ownership DPR-43 Kewaunee Dominion Energy Kewaunee, Inc. (see note 1) S 371.0 $ 371.0 Total S 371.0 S 371.0 Page 1 of 3
Serial No.09-038 Attachment 4 DOMINION ENERGY KE\/vAUNEE, INC.
Nuclear Decommissioning Financial Assurance as of 12/31/2008 Dominion Energy KewauneEl, Inc. (DEK)
I Serial No.09-038 (DEK)
Attachment 4 Kewaunee Power Station Nuclear Decommissioning Financial AssLlrance as of 12131/2008 Table III: page20f3 Current Annual Funding Levels (Millions of Dollars)
Kewaunee Total Ownership DPR-43 Kewaunee Dominion Energy Kewaunee, Inc. $ . $ .
Total $ . $ .
Page 2 of 3
Serial No.09-038 Attachment 4 DOMINION ENERGY KE\,VAUNEE, INC.
Nuclear Decommissioning Financial Assurance as of 12/31/2008 Dominion Energy KewauneE!. Inc. (DEK)
I Serial No.09-038 (DEK)
Attachment 4 Kewaunee Power Station Nuclear Decommissioning Financial AssLlrance as of 12131/2008 Table IV: page 3 of3 NRC Minimum Financial Assurance Amounts Present Value & Future Value (Millions of Dollars)
Kewaunee Total Ownership DPR-43 Kewaunee Method for Providing Financial Assurance Prepayment Prepayment NRC Minimum Financial Amounts as of 12131/2008 $ 359.1 $ 359.1 Funds in Extemal Trusts as of 12131/2008 (see note 1) $ 371.0 $ 371.0 Total Funds in Extemal Trusts as of 12131/2008 Minus NRC Minimum Amounts as of 12131/2008 (see note 2) $ 11.9 $ 11.9 Annual Trust Funds Eamings Rate (After - Tax & Fees - assumes 2% Real Rate of Retum) 2.00%
Date That Operating License Expires (refleds no License Renewal) (see note 4) 12/21/201" Funds in excess or (underfunded) to NRC Minimum In Future Dollars (3.5 Years after start of Decommissioning)(see notes 2 & 3) $ 71.4 $ 71.4 Notes:
(1) The External Trust Funds shown reflect the total amoll1t of funds in the Trusts all of which are av~ ilabla for radiological decommissioning. The total of the Trusts since the March 29,2007 filing have decreased. This decrease is due solely to the economic downtum and the resultant losses in Trust Fund value.
(2) Negative amounts (if any) indicate that the value of Trust funds are less than the value of the NRC Minimum for the period indicated.
(3) The Future Value calculation for Kewaunee reflects 2%') Real Rate of Return applied from 1/112009 to 3.5 years after start of Decommissioning.
(4) DEK applied to renew its operating license in August 2008 Page 3 of 3